Abstract
u-City projects are different with the existing urban development projects progress via convergence with IT technology. Therefore, it inheres many risk factors more than the existing development projects as including more complexity and variety. The risk management system to systematically manage those risks which get identified and quantified is required. Especially, the planning phase that is appeared the various forms has a large effect on the success of the business. However, the management of risk factors remains in the passive form. So the problems on u-City project in the planning phase and risk factors of existing development business were analyzed for the continuous growth and the successful performance of u-City project, and those risk factors was identified and quantified by using statistical technique. In the results of it, the core risk factors were obtained through which way and the basis for the effective risk management in u-City business is provided.
u-City사업은 기존의 도시개발 사업과 달리 IT기술과의 융합을 통하여 진행된다. 따라서 기존의 개발사업의 비하여 더 많은 복잡성, 다양성을 내포하여 더 많은 위험요인들을 내제하고 있다. 이러한 리스크 요인들을 체계적으로 확인하고 정량화하여 관리, 통제할 수 있는 리스크 관리체계에 대한 필요하다. 특히 계획단계는 그 위험 요인이 다양한 형태로 나타나게 되어 사업의 성패에 많은 영향을 주는 단계이지만, 위험요인에 대한 관리는 소극적인 형식에 머물러 있다. 이러한 상황에서 리스크 요인들의 식별과 분석을 통한 리스크관리는 가장 필요한 요소이다. 따라서 본 연구에서는 u-City 사업의 지속적인 성장과 성공적인 수행을 위하여 계획단계에서의 문제점과 기존의 개발사업의 리스크 요인을 분석하여, u-City 계획단계에서 관리되어야 할 리스크 인자를 식별하고 이를 통계적 기법을 활용하여 리스크의 중요도, 발생확률, 발생영향에 따라 리스크 요인을 분석하여 정량화 하였다. 이를 통하여 우선적으로 관리되어야 할 핵심리스크 요인을 도출하였으며, u-City사업의 효과적인 리스크 관리를 위한 기초자료를 마련하였다.