• Title/Summary/Keyword: 리모델링공사

Search Result 128, Processing Time 0.027 seconds

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

A Measure for Standardization of Old Aged Apartment Remodeling through Application of BIM (BIM 적용을 통한 노후공동주택 리모델링 공사 표준화 방안)

  • Han, Ju-Yeoun;Cha, Hee-Sung;Lee, Dong-Gun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.53-61
    • /
    • 2009
  • With the Government's policy of increasing the supply of residential houses in 1970s, the number of apartments have increased dramatically, and as the result, the number of old aged apartment are increasing too. Therefore remodeling is being executed to improve the residential environment. The rate of remodeling is increasing instead of rebuilding because rebuilding takes more resource and because of the realestate issue. There are many uncertainties in construction progress of remodeling such as communication between personnel, demolition and repair work. There are no standard for remodeling construction so such problems have been causing more problems. It has been found that BIM (Building Information Modeling) may be effective for resolving issues of standardization of remodeling construction. Therefore this study wishes to develop a standard process for remodeling work through BIM to estimate the possibility of its use at remodeling sites. Based on this, I wish to contribute to the issue of achieving construction efficiency pursued by BIM.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage (친환경 리모델링 철거공사 수행을 위한 사전검토 모델 개발)

  • Chae, Seong-Hyun;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.14-23
    • /
    • 2012
  • Due to the increase of aged housing demolition in preparation for the rapid growth of the market, Eco-friendly remodeling demolition work which can minimize environmental destruction have been studied. However, the owner or contractor to apply for eco-friendly remodeling demolition work does not reflect the characteristics of the site can not have a potential for many variables. In addition, There is no standard which can find effective part and catch a problem by performing eco-friendly remodeling demolition. Therefore, the project owner and construction company executives in the Pre-construction stage to the implementation of eco-friendly remodeling demolition construction by providing a model for the pre-evaluating the project. In this paper, the performance of eco-friendly remodeling of demolitions is proposed for the pre-evaluating model. After the eight items were drawn affecting the performances which are influence to accomplishment of the eco-friendly remodeling demolition, evaluation criteria was suggested for each item. Also By classifying and assessing the evaluation items, It will be able to identify the problems and supplements for eco-friendly remodeling demolition. Through the final evaluation sheet, The works of the appropriacy and supplement will be checked for the eco-friendly remodeling demolition. Finally The preinvestigation model is helpful for making the plan of systematic demolition, futhermore It is contribute to the expansion of the eco-friendly remodeling demolition.

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Competitive Core Technology Proposal for a Remodeling Project (경쟁력 있는 리모델링 공사를 위한 요소기술 도출)

  • Han, Ju-Yeoun;Kim, Ki-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.785-789
    • /
    • 2008
  • As people pays more attention to remodeling as a method to effectively improve, maintain, and manage building properties, it is important to ensure the economic feasibility of remodeling compared to reconstruction, instead of focusing on systematic regulations. In order to identify core technologies, the study set criteria to survey cost of a remodeling project by analyzing current status of remodeling projects. Based on the criteria, the study calculated average construction cost for five remodeling projects that were conducted recently, compared the cost with new construction projects, and examined major level works that are essential in a remodeling project. Based on the major level works, the study conducted interviews with construction experts to draw core technologies in design, structure and construction of a remodeling project.

  • PDF

설비의 리모델링을 고려한 건축물 설계

  • 김수암
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.30 no.9
    • /
    • pp.17-26
    • /
    • 2001
  • 최근 국제적인 여건과 사회적인 상황이 급변하여 대량생산-대량소비지향으로 인한 폐기물의 대량방출사회에서 지구환경보전을 중시하는 사회로 전환되어 가고 있다. 지구환경의 보전을 위하여 다양한 분야에서 각종 논의가 진행되고 있는 가운데 건축분야에서도 지구기후변화에 영향을 미치는 것으로 알려져 있는 이산화탄소배출의 억제와 폐기물 삭감 등에 대한 관심이 증대되고 있다. 최근 관심이 집중되고 있는 건축물의 장수명화와 리모델링도 이러한 움직임과 궤틀를 같이 하는 것이다. 물론 리모델링은 신축시장의 급감에 따른 대체시장으로서 검토되고 있는 측면이 더 크게 작용하고 있는 것도 사실이지만, 그동안 신축에 대한 집중적인 투자에 중점이 두어져 재고건축물에서 간과해 왔던 유지관리와 리모델링에 대한 중요성 인식이 결부되어 있다고 보여진다. 사실 지금까지 리모델링이 전혀 이루어지지 않았던 것이 아니라 일반건축물 부문에서는 상당부분 이루어져 왔으며, 공동주택 부문에서도 극소수 이루어져 왔다. 리모델링에 대한 정의와 개념을 어떻게 보느냐에 따라 많은 차이가 있을 수 있지만, 리모델링은 건축물 또는 외부공간의 성능 및 기능의 노후화나 진부화에 대응하여 보수, 수선, 개수, 부분증축 및 개축, 제거, 새로운 기능추가 및 용도변경에 이르는 광범위한 행위를 포함한다. 리모델링을 통하여 건축물의 성능을 유지하거나 향상시켜 쾌적하고 건강한 건축물의 재고 를 구축함과 아울러 건강한 지역환경을 조성하여 국민생활의 질적인 향상을가져옴으로써 환경을보전하 고 자원낭비를 줄여 지속가능한 건축물과 사회를 만들어 갈수있도록 하는 것이다. 건축물에서 리모델링을 하게 되는 동기는 시간이 흘러 물리적인 측면이나 기능적인 측면에서 노후화가 발생하거나 기능적인 요구가 변화함에 따라 건설당시의 성능이나 기능유지가 어렵거나 건설당시의 기능만으로는 요구조건을 만족함 수 없기 때문에 건설 당시의 수준을 유지하거나 새로운 요구에 적합하도록 향 상시키기 위해서는 물리적 또는 기능적인 개선이나 개량이 필요하기 때문이다. 물리적인 개선이나개량을위하여 중요한것은건축 물을 구성하는 자재나 부품의 수명문제이다. 수명의 길이차이가 건축물의 리모델링에 영향을 주고 있을 뿐만 아니라 서로 다른 수명의 자재나 부품의 접합상태가 리모델링 공사에 많은 영향을 미치게 된다. 리모델링 공사가 신축공사의 70-80% 정도의 공사비가 소요되기 때문에 리모델링 공사가 어렵다는 업체의 불만은 바로 이러한 점을 극명하게 드러내는 좋은 사례이다. 본 고는 이러한 측면에서 건축물의 장수명화를 근간으로 한 설비의 리모델링을 용이하게 하기 위한 건축 계획 및 구법에 대하여 고찰하고자 한다. 그리고 본 고는 기존건축물의 설비자체의 보수나 개수를 용이하게 하는 것에 초점이 맞추어진 것이 아니라 건축설계 및 시공시에 향후 설비부분을 용이하게 개.보수할 수 있도록 배려하는 측면을 중심으로 설명하였다.

  • PDF

Development of Optimal TACT Process for Eco-Friendly Demolition Works in Aged Housing Remodeling - Focus on Case Study - (친환경 리모델링 철거공사의 최적 TACT공정 개발 - 사례연구를 중심으로 -)

  • Woo, Joong-Pyung;Kim, Ki-Hyun;Hwang, Young-Gyu;Kim, Kyung-Rai;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.3-12
    • /
    • 2011
  • Technology based civilization has made a sustained advancement, resulting in economic growth and material prosperity. The outcome was the beginning of environmental destruction. Especially, in regard to construction, it has been recognized as a key culprit for pollution. As such, the construction industry has recently shown interest in the environment, as it has been applying environment friendly method of construction and reducing wastes. As the number of old common housing increases in our country, reconstruction and remodeling are implemented as a means of improvement. However, it can be said that remodeling is the inevitable option because of cost and environmental problems associated with reconstruction. As part of its feature, remodeling work is preceded by removal work. And, removal work inevitably creates construction wastes. Treatment of wastes that takes into consideration environmental aspects is important and for this, removal work that is based on environment friendly remodeling to ensure selective separation must be implemented. Yet, a removal work based on environment friendly remodeling has a lower level of output compared to existing methods. Because remodeling work by its nature has a post construction work which proceeds after it, securing work efficiency is important as the removal work is a critical path activity. Thus, the present study improves the work process of a removal work that is based on environment friendly remodeling so that it becomes a work process that includes work efficiency. For this, as a case study, old common housing has been selected, and a TACT process has been developed which is based on data acquired from environment friendly removal work. And, this study develops an optimal TACT process which is based on environment friendly remodeling by conducting a simulation for a 15 floor apartment.