Korean Journal of Construction Engineering and Management
/
v.18
no.2
/
pp.12-20
/
2017
The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.
Korean Journal of Construction Engineering and Management
/
v.9
no.5
/
pp.104-115
/
2008
Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.
Korean Journal of Construction Engineering and Management
/
v.10
no.3
/
pp.53-61
/
2009
With the Government's policy of increasing the supply of residential houses in 1970s, the number of apartments have increased dramatically, and as the result, the number of old aged apartment are increasing too. Therefore remodeling is being executed to improve the residential environment. The rate of remodeling is increasing instead of rebuilding because rebuilding takes more resource and because of the realestate issue. There are many uncertainties in construction progress of remodeling such as communication between personnel, demolition and repair work. There are no standard for remodeling construction so such problems have been causing more problems. It has been found that BIM (Building Information Modeling) may be effective for resolving issues of standardization of remodeling construction. Therefore this study wishes to develop a standard process for remodeling work through BIM to estimate the possibility of its use at remodeling sites. Based on this, I wish to contribute to the issue of achieving construction efficiency pursued by BIM.
Korean Journal of Construction Engineering and Management
/
v.22
no.2
/
pp.42-52
/
2021
The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.
Journal of the Korea Institute of Building Construction
/
v.18
no.4
/
pp.385-394
/
2018
There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.
Korean Journal of Construction Engineering and Management
/
v.13
no.1
/
pp.14-23
/
2012
Due to the increase of aged housing demolition in preparation for the rapid growth of the market, Eco-friendly remodeling demolition work which can minimize environmental destruction have been studied. However, the owner or contractor to apply for eco-friendly remodeling demolition work does not reflect the characteristics of the site can not have a potential for many variables. In addition, There is no standard which can find effective part and catch a problem by performing eco-friendly remodeling demolition. Therefore, the project owner and construction company executives in the Pre-construction stage to the implementation of eco-friendly remodeling demolition construction by providing a model for the pre-evaluating the project. In this paper, the performance of eco-friendly remodeling of demolitions is proposed for the pre-evaluating model. After the eight items were drawn affecting the performances which are influence to accomplishment of the eco-friendly remodeling demolition, evaluation criteria was suggested for each item. Also By classifying and assessing the evaluation items, It will be able to identify the problems and supplements for eco-friendly remodeling demolition. Through the final evaluation sheet, The works of the appropriacy and supplement will be checked for the eco-friendly remodeling demolition. Finally The preinvestigation model is helpful for making the plan of systematic demolition, futhermore It is contribute to the expansion of the eco-friendly remodeling demolition.
Korean Journal of Construction Engineering and Management
/
v.22
no.6
/
pp.107-119
/
2021
Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.785-789
/
2008
As people pays more attention to remodeling as a method to effectively improve, maintain, and manage building properties, it is important to ensure the economic feasibility of remodeling compared to reconstruction, instead of focusing on systematic regulations. In order to identify core technologies, the study set criteria to survey cost of a remodeling project by analyzing current status of remodeling projects. Based on the criteria, the study calculated average construction cost for five remodeling projects that were conducted recently, compared the cost with new construction projects, and examined major level works that are essential in a remodeling project. Based on the major level works, the study conducted interviews with construction experts to draw core technologies in design, structure and construction of a remodeling project.
The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
/
v.30
no.9
/
pp.17-26
/
2001
최근 국제적인 여건과 사회적인 상황이 급변하여 대량생산-대량소비지향으로 인한 폐기물의 대량방출사회에서 지구환경보전을 중시하는 사회로 전환되어 가고 있다. 지구환경의 보전을 위하여 다양한 분야에서 각종 논의가 진행되고 있는 가운데 건축분야에서도 지구기후변화에 영향을 미치는 것으로 알려져 있는 이산화탄소배출의 억제와 폐기물 삭감 등에 대한 관심이 증대되고 있다. 최근 관심이 집중되고 있는 건축물의 장수명화와 리모델링도 이러한 움직임과 궤틀를 같이 하는 것이다. 물론 리모델링은 신축시장의 급감에 따른 대체시장으로서 검토되고 있는 측면이 더 크게 작용하고 있는 것도 사실이지만, 그동안 신축에 대한 집중적인 투자에 중점이 두어져 재고건축물에서 간과해 왔던 유지관리와 리모델링에 대한 중요성 인식이 결부되어 있다고 보여진다. 사실 지금까지 리모델링이 전혀 이루어지지 않았던 것이 아니라 일반건축물 부문에서는 상당부분 이루어져 왔으며, 공동주택 부문에서도 극소수 이루어져 왔다. 리모델링에 대한 정의와 개념을 어떻게 보느냐에 따라 많은 차이가 있을 수 있지만, 리모델링은 건축물 또는 외부공간의 성능 및 기능의 노후화나 진부화에 대응하여 보수, 수선, 개수, 부분증축 및 개축, 제거, 새로운 기능추가 및 용도변경에 이르는 광범위한 행위를 포함한다. 리모델링을 통하여 건축물의 성능을 유지하거나 향상시켜 쾌적하고 건강한 건축물의 재고 를 구축함과 아울러 건강한 지역환경을 조성하여 국민생활의 질적인 향상을가져옴으로써 환경을보전하 고 자원낭비를 줄여 지속가능한 건축물과 사회를 만들어 갈수있도록 하는 것이다. 건축물에서 리모델링을 하게 되는 동기는 시간이 흘러 물리적인 측면이나 기능적인 측면에서 노후화가 발생하거나 기능적인 요구가 변화함에 따라 건설당시의 성능이나 기능유지가 어렵거나 건설당시의 기능만으로는 요구조건을 만족함 수 없기 때문에 건설 당시의 수준을 유지하거나 새로운 요구에 적합하도록 향 상시키기 위해서는 물리적 또는 기능적인 개선이나 개량이 필요하기 때문이다. 물리적인 개선이나개량을위하여 중요한것은건축 물을 구성하는 자재나 부품의 수명문제이다. 수명의 길이차이가 건축물의 리모델링에 영향을 주고 있을 뿐만 아니라 서로 다른 수명의 자재나 부품의 접합상태가 리모델링 공사에 많은 영향을 미치게 된다. 리모델링 공사가 신축공사의 70-80% 정도의 공사비가 소요되기 때문에 리모델링 공사가 어렵다는 업체의 불만은 바로 이러한 점을 극명하게 드러내는 좋은 사례이다. 본 고는 이러한 측면에서 건축물의 장수명화를 근간으로 한 설비의 리모델링을 용이하게 하기 위한 건축 계획 및 구법에 대하여 고찰하고자 한다. 그리고 본 고는 기존건축물의 설비자체의 보수나 개수를 용이하게 하는 것에 초점이 맞추어진 것이 아니라 건축설계 및 시공시에 향후 설비부분을 용이하게 개.보수할 수 있도록 배려하는 측면을 중심으로 설명하였다.
Korean Journal of Construction Engineering and Management
/
v.12
no.1
/
pp.3-12
/
2011
Technology based civilization has made a sustained advancement, resulting in economic growth and material prosperity. The outcome was the beginning of environmental destruction. Especially, in regard to construction, it has been recognized as a key culprit for pollution. As such, the construction industry has recently shown interest in the environment, as it has been applying environment friendly method of construction and reducing wastes. As the number of old common housing increases in our country, reconstruction and remodeling are implemented as a means of improvement. However, it can be said that remodeling is the inevitable option because of cost and environmental problems associated with reconstruction. As part of its feature, remodeling work is preceded by removal work. And, removal work inevitably creates construction wastes. Treatment of wastes that takes into consideration environmental aspects is important and for this, removal work that is based on environment friendly remodeling to ensure selective separation must be implemented. Yet, a removal work based on environment friendly remodeling has a lower level of output compared to existing methods. Because remodeling work by its nature has a post construction work which proceeds after it, securing work efficiency is important as the removal work is a critical path activity. Thus, the present study improves the work process of a removal work that is based on environment friendly remodeling so that it becomes a work process that includes work efficiency. For this, as a case study, old common housing has been selected, and a TACT process has been developed which is based on data acquired from environment friendly removal work. And, this study develops an optimal TACT process which is based on environment friendly remodeling by conducting a simulation for a 15 floor apartment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.