Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Organizational Program Management of Multiple Maintenance Projects Under Fund Constraints (복수 개${\cdot}$보수 프로젝트의 자금제약하 프로그램 관리 - 자원제약 마스터-일정계획을 중심으로 -)

  • Koo Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.211-218
    • /
    • 2004
  • In a large owner organization, a program manager of multiple maintenance and remodeling projects has experienced increasing scale and complexity of coordinating the M/R projects with in-house technicians who belong to multiple trade shops. This paper proposes a dual-level hierarchical planning strategy that consists of a program master plan in the long-term horizon and a master construction schedule in an operational scheduling window. A rolling horizon approach to the program master plan is proposed to deal with the external uncertainty of unknown stream of project requests. A resource-constrained scheduling algorithm is developed to generate the master construction schedule in a scheduling window. During development of the algorithm, more emphasis is placed on long-term organizational resource continuity, especially flow management of program constraint resources, than ephemeral events of an individual activity and project. Monte Carlo simulation experiments of three scheduling windows are used to evaluate the relative performance of the proposed scheduling algorithm against three popular scheduling heuristics for resource-constrained multiple projects.

A Study on the Functional Analysis of Parking Lot Expansion Technology using Technology-Tree (기술트리를 이용한 주차장 확대 기술의 기능분석에 관한 연구)

  • Youn, Bohyung;Choi, Jaewook;Park, Sungpyo;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.64-76
    • /
    • 2019
  • Aged apartments lack parking space and are suffering from severe parking difficulties due to the increase in the supply of private cars due to the economic improvement. Efficient remodeling technology is required as a way to solve the problem of a shortage of parking spaces, but there is a lack of establishing a technology for remodeling plans that can reflect the characteristics of various parks. This study was conducted to analyze the functions of the parking lot expansion technology using the technology tree and to derive the final technology through the function deployment. As a result of functional deployment of the plan to expand the parking lot, the fifth function was deployed and a total of 22 technologies were derived. Four types of technologies are categorized, four technologies for underground expansion, 12 technologies for underground and ground expansion, two technologies for ground expansion, and four technologies for ground-based expansion. As a result of the functional deployment of the main entrance plan, the fifth function was deployed and derived with 22 technologies. The total technologies were grouped into four categories, four technologies for direct underground entry, 11 technologies for indirect underground entry, three technologies for direct access to ground, and four technologies for indirect entry to ground. Through case verification, the detailed technologies applied to the semi-industrial complex of remodeling were identified and expert surveys and interviews were conducted to verify the adequacy of the technology tree.

A Study on the Remodeling Case of General Hospitals in Korea - Focused on the Case of S Hospital - (국내 종합병원의 리모델링 사례 연구 - S 병원을 중심으로 -)

  • Kim, Ha-Jin;Kim, Boong-Sik;Yang, Nae-Won
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.8 no.1
    • /
    • pp.21-28
    • /
    • 2002
  • As hospitals change continuously and rapidly, the way of growth and change becomes another important factor in the design of a hospital. The hospitals are adapted for the continuous growth and change during their life span. But the hospitals built in 1970's and 80's have been expanded and reconstructed without any plan of growth and change. So, there is required to the architectural planning on the remodeling and modernization strategy of general hospitals. The purpose of this study is to provide the fundamental data for the reasonable design planning and the basic principles of the construction plan in the hospital remodeling. Thus, this study is to investigate and analyze the characteristics of hospital remodeling, the remodeling planning, and the scheduling process in terms of construction. As a result, this study would apply to design guideline for the remodeling of general hospitals.

  • PDF

Decision Support Process Model for Energy Efficient Remodeling Projects focused on Building Envelope and Renewable-energy Systems (에너지절감형 리모델링을 위한 적정 대안 선정 프로세스 모델 - 건축물 외피 및 신재생에너지 시스템을 중심으로 -)

  • Shin, Young-su;Cho, Kyuman;Kim, Jae-youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.91-100
    • /
    • 2015
  • An increase in energy such as natural gas, coal, oil, has occurred to a large amounts of environment impact emissions, it is necessary to reduce in the construction industry for the energy consumption. To encourage remodeling project in developed countries of the majority, on the basis of this, remodeling project in the construction industry has grown to a large amount. Results of analysis of the research related to the advanced remodeling, analysis of the economic validity in accordance with the production and process and building elapsed years of selection alternative of remodeling there has been a problem that has not been properly reflected. In this study, a decision support model that can simultaneously choose the most cost-effective and energy-efficiency alternative. Developed process model, generates a "Remodeling Solution" that combines the renewable energy equipment and envelope system, energy performance evaluation of the application of international standards(ISO-13790, DIN V 18599), perform the economic evaluation through LCCA(Life Cycle Cost Analysis) technique, circulated evaluation and configured to output the optimal Remodeling Solution. The results of applying the model developed in the case, it was confirmed that it is possible to select a choice of cost-effective energy-saving alternative. Then, developed model through this study, it is expected to be able to help highly effective remodeling alternative to selecting by decision-makers.

Jeju Shinyang Fishing Port Remodeling Plan Utilizing Marine Tourism Resources (해양관광자원을 활용한 제주 신양항 리모델링 계획)

  • Kim, Yelim;Sung, Jong-Sang
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.2
    • /
    • pp.52-69
    • /
    • 2016
  • The fishing port was once the foothold of production as well as the stronghold of communities but with the declining of the fishing industry, ports became abandoned space. Jeju Special Self-Governing Province has continued its effort to vitalize marine tourism since 2010. Shinyang Port in particular is designated as a Prearranged Marina Port Development Zone, and planning for the Jeju Ocean Marina City project is underway. Nevertheless, fishing port remodeling projects implemented on Jeju so far have focused only on civil engineering such as renovating old facilities. In addition, most Marina Port Development Projects have been irrelevant to local communities. Leading projects by the local government mostly suffer from a lack of funding, which results in the renovation of old facilities and improper maintenance, while private sector investment projects do not lead to benefit sharing with the community. Shinyang Port, also renovated in 2008, ended up with outer breakwater extension construction that neither solved the fundamental problem of the site nor gave benefits to residents. To arrange a way to solve problems for civil engineering focused development project, improper maintenance, and benefit sharing with community, first, this study proposes a development plan that connects with the outlying areas near the ports. The plan reflects existing topography, Jeju traditional stonewalls, narrow paths on the master plan and programs by reading the regional context. In this way, this paper suggests a space development plan reflecting the local landscape and characteristic factors. Second, it satisfies various needs by using existing and new Marine Tourism Resources. Third, it examines sustainable operation and management measures through residents' participation. The proposal is significant in two key ways: it is a fresh attempt at connecting the fishing port with its outlying areas from a landscape perspective; and it considers environmental, social, economic issues, and suggests participation for local communities. Thus, the model can be used in future fishing-port remodeling plans for revitalizing unused space, including invaluable traditional landscapes, and for boosting the marine-leisure industry.

A Decision Methodology for the Priority of Military Facility Remodeling (군 시설 리모델링의 우선순위 결정 방법)

  • Yang In-Cheul;Jeon Yong-Seok;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2003
  • The procedure of present military facility remodeling has many problems at the stage of evaluating the priorities in various remodeling projects which have been caused from lots of corps. These problems have usually happened not only because of the shortage of the cooperation system in the related divisions but also because of the nonexistence of the effective process and method for evaluating the priorities. I've reviewed the study of remodeling and military facility business and applied the AHP(Analytic Hierarchy Process) method which is effective to evaluate the priorities in various groups' decision.

  • PDF

A Technical Review of Container Terminal Remodeling : the Case of Busan Port (컨테이너터미널 리모델링 기술검토 : 부산항 사례)

  • Choi Yong-Seok;Kim Woo-Seon;Ha Tae-Young
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.499-508
    • /
    • 2006
  • Many changes lie ahead for Korea both domestically and internationally including opening of Busan New Port, more active Gwangyang Port as well as rapid growth of Shanghai Port and enhanced services and productivity at Shenzen Port. Compared to newer ports, container terminals in Busan Port possesses old equipment and facilities. Therefore, in order for Busan Port to maintain its service level and remain competitive, it needs to undergo remodeling to enhance productivity. Remodeling activities should be implemented on a continual basis by developing and applying new technologies such as those for gate system, berth system, yard system, and IT system In order to review the alternatives, we performed questionnaire survey and interview. From the result of analysis, we designed the application plan based on priority in remodeling, period of technology application, and direction for application.

A Study on the Characteristics of Remodeling Planning in Small-mid sized Hospital - Focused on the case study of 300beds general hospital (중소규모 병원의 리모델링 계획 특성에 관한 연구 - 300병상 종합병원 계획사례를 중심으로)

  • Choi, Kwangseok;Kim, Kiyon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.22 no.4
    • /
    • pp.105-115
    • /
    • 2016
  • Purpose: This study is a case study of a small-mid sized hospital to promote a full-scale remodeling to ensure the quality and competitiveness of the medical services and trying to arrange the remodeling characteristics of small-mid sized hospital which is suffering from aging facilities as well as chronic congestion and lack of spaces. Methods: Research was conducted by consultation with hospital executives and each department operators, and on-site investigation, Results: The result of this study can be summarized into two points. The first one is that existing statistical value like area per bed, in the remodeling of the small-mid hospitals may not mean much. planners have to verify the necessary room space areas in close consultation with the department operators. And after confirming layout possibilities, they have to create the program. The second one is that remodeling planning can be a realistic plan with structural and installation diagnosis at the same time. If so, it is advisable to proceed architectural design from the beginning for cost and time savings. Implications: This results can be applied to small-mid hospitals to apply to the medical law revision and others.