Analysis of the Relations between Design Errors Detected during BIM-based Design Validation and their Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jong-Sung;Kim, Jae-Yeo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.535-544
    • /
    • 2017
  • This paper analyzes the relations between design errors, prevented by building information modeling (BIM)-based design validation, and their impacts in order to identify critical consideration factors for implementing BIM-based design validation in architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to their causes (illogical error, discrepancy, and missing item) and work types (structure, architecture, and mechanical, electrical, and plumbing (MEP)). The probabilistic relations among the independent variables, including the causes and work types of design errors, and the dependent variables, including the project delays, cost overruns, low quality, and rework generation that can be caused by these errors, are analyzed using logistic regression. The characteristics of each design error are analyzed by means of face-to-face interviews with practitioners. According to the results, the impacts of design error causes in predicting the probability values of project delays, cost overruns, low quality, and rework generation were statistically meaningful.

IETM (Interactive Electronic Technical Manual) for Urban Regeneration (도시재생사업에서의 전자매뉴얼)

  • Yu, Jung-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.74-81
    • /
    • 2008
  • Urban Regeneration has an object to restore a function of urban through physical/cicumstance, social lift/culture, industrial/economic regeneration. It has characteristics like existence of a lot of projects, complextity of stakeholders' structure, long period of project life cycle to achieve variety of project's promotion strategy. To accomplish a Urban regeneration that has above characteristics successfully, information about other projects should be managed organically. And it should provie information linked up with each projects by integrated management. We need a decision making method that helps users cope with requirements of change during project, and offers information when each users need to make a decision timely. So I propose a strategy to build the IETM considering urban regeneration characteristics.

  • PDF

Promoting the Masses' Investment through Crowdfunding Platform: Focusing on Lending based Crowdfunding Platform (크라우드펀딩 플랫폼을 통한 대중적 투자 활성화 방안 연구: 대출형 크라우드펀딩 플랫폼을 중심으로)

  • Lee, Ae Ri;Lee, Sang-Jong;Kim, Kyung Kyu;Kwon, Hyuk-Jun
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.11
    • /
    • pp.644-660
    • /
    • 2016
  • With the development of Fintech industry, research interest in crowdfunding is growing. Crowdfunding, originated from crowdsourcing, involves the participation of many individuals' contributions to funding a new project. Specifically, lending based crowdfunding provides a platform for raising funds in the form of loans by connecting borrowers to funders(investors) via Internet, not through traditional financial institutions. Recently, lending based crowdfunding attracts much attention as a new investment alternative; however, there is a lack of research about lending based crowdfunding. This study aims to examine the factors influencing an investor's participation in lending based crowdfunding by focusing on platform features, investor features, and project features. Based on the findings, this study discusses theoretical and practical implications for promoting the crowd's investments through crowdfunding platforms.

Analysis of Main Control Factors for Design Value Engineering Work in Construction Projects (건설 프로젝트 설계VE 업무의 중점 관리 요인 분석)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.128-137
    • /
    • 2006
  • Recently the role and the importance of design value engineering is expected to be high, so research is needed for its effective accomplishment. But in domestic arena, the introduction of the history of design value engineering is too short and insufficient in act of research. Therefore in this research we have suggest the standard for the effective accomplishment of design value engineering work. The way is the abstraction many causes. firstly, we analyzed the team project case of value engineering professional instruction. second, we analyzed the cause of problem produced in accomplishment process of design value engineering work through research for the professional field. So from the base of the analyzed content, we have suggest main control factor for the effectiveness of design value engineering work and the following scheme and process of work efficiency optimization.

Decision Making Process for Alternative Selection of Proper Design Change in Construction Project (적정 설계변경안 선정을 위한 의시결정 지원 프로세스)

  • Lee, Jong-Sik;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.

Study on Image Processing Algorithm Education Based on Web Camera and LEGO Mindstorms (웹 카메라와 LEGO Mindstorms를 활용한 영상 처리 알고리즘의 교육에 관한 연구)

  • Kim, Sung-Young;Hwang, Jun-Ha
    • Journal of Engineering Education Research
    • /
    • v.13 no.6
    • /
    • pp.171-179
    • /
    • 2010
  • In this paper, we describe a case study of a new lab. project that improves efficiency for education and interest on learning in image processing and pattern recognition related subjects by using LEGO Mindstorms. In addition we verify the validity with analysis of the practical application. LEGO Mindstorms is already used in many educational institution of several countries since about 10 years ago and various case studies have been published. The use of LEGO Mindstorms is generally positive but the negative comments about this exist. The main cause of negative opinion is from unpredictability. The unpredictability from mainly analog characteristics of robot can degrade the effective learning. The describing lab. project suppresses occurrence of unpredictability by minimizing dependence on robots. Students can concentrate on learning the related algorithms by minimizing the learning content and further consideration.

  • PDF

A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects (건설프로젝트의 품질결함의 발생요인간 상관분석)

  • Chi, Sungjoon;Cha, Yongwoon;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.21-28
    • /
    • 2015
  • Construction defects are major components that result in cost overruns and schedule delays in construction projects. There have been extensive research efforts to investigate the cause of defects. However, little effort has been devoted to analyze correlation among various reasons of construction defects while a defect is not usually an outcome of a single cause, but rather occurs when several interrelated causes combine. Based on this recognition, this paper analyzes 831 nonconformity reports collected from 30 construction projects in Korea from 2011 to 2014. The correlation analysis revealed that a significant portion of construction defects occurred in the procurement and construction phase and as the pattern of function defect and installation defect. Triggered by human error, defective material and faulty method, these defects are treated by conccession, repair, rework that can significantly lower the cost and schedule performance. This paper is significant in terms of providing a theoretical basis for analyzing correlation among various reasons of construction defects and quantitative measures for establishing effective defect prevention strategies.

Effective Management of Construction Information Using a XML Based Project Deliverable Management System (XML 데이터베이스를 활용한 성과물 관리 프로세스의 효과)

  • Moon, Sungwoo;Yang, Byungsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.481-489
    • /
    • 2006
  • These days construction management is executed in an information technology environment, which creates a large volume of digital data. At the completion of a project, the contractor is required to transfer to the owner the digital data as project deliverables usually in a form of CD's. From an enterprise-wide view point, this traditional way makes the management of project deliverables ineffective as the data accumulated from different projects could be enormous. The objective of this paper is to propose a structured way to utilize a XML database for better management of project deliverables. The XML database provides an environment which users can access through a project deliverable management system (PDMS). A pilot of the PDMS has been developed to test the effectiveness of document control. The result of the test demonstrates that the effectiveness of project deliverable management can be increased by providing a high transportability and usability of data in the construction life cycle.

A Study on the Actual Condition and Development of BCWS Management In Large Apartment Complex Project (대단지 아파트 건설공사의 계획기성 관리실태에 관한 연구)

  • Kim Sang-Hee;Yang Yong-Cheol;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.434-437
    • /
    • 2003
  • In apartment project, BCWS is a critical management factor and has a great influence on the success of the project. But due to the characteristics of large apartment complex, there are several problems in making out a time schedule of work as well as production and management of precise bcws from the allocation of resources. In this study, Actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of bcsw through the analysis of the problems and the origins relating to BCWS from a field area.

  • PDF

Analysis of Conflict Cases in Urban Regeneration Projects (도시재생사업에서의 갈등사례 유형 분석)

  • Lee, Seul-Ki;Kwon, Hea-Rim;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.78-87
    • /
    • 2009
  • Because of a wide range of performance and diversity of project and uncertainty caused by complexity and a number of stakeholder, conflict occur necessarily in Urban generation including large-scale and many project which do the same time, for long time. so active conflict management which recognized risk before the fact and deal with conflict is necessarily needed. Therefore, This study is typing conflict cases and indicating critical conflict type through analysis on conflict case about process and stakeholder of urban generation to offer information which is referred to finding a solution when conflict occur by forecasting conflict that can occur before the fact.