1 |
Bae, D., Kim, K., and Kim, J. (2005). "A Cluster Analysis of the Audit Result on Quality Management System in Architectural Design and Engineering Firms", Korean Journal of Construction Engineering and Management, KICEM, 6(2), pp. 120-128.
|
2 |
Choi, J., Kim, S., Kim, K., and Kang, K. (2005). "A Study on Correlation between Human Factors and Construction Quality Management", Journal of the Architectural Institute of Korea Structure & Construction, AIK, 21(4), pp. 141-148.
|
3 |
Lee, K., Yoon, Y., and Yang, K. (2005). "Development of Quality Management in Small and Medium Construction Company", Journal of the Korea Institute of Building Construction, KIC, 5(3), pp. 117-224.
DOI
ScienceOn
|
4 |
Lee, S., Lee, H., and Kim, M. (1996). "A Method for Selecting Principal Items of Quality Management through the Defect Analysis in the Construction Process", Journal of the Architectural Institute of Korea Structure & Construction, AIK, 12(4), pp. 301-309.
|
5 |
Park, H., and Park, Y. (2011). "Strategies for Developing the Appropriation Method of the Construction Quality Cost", Korean Journal of Construction Engineering and Management, KICEM, 12(3), pp. 101-111.
DOI
|
6 |
Song, S., Lee, H., and Park, M. (2006). "Quality Performance Management System for Construction Projects Using Quality Performance Indicators", Korean Journal of Construction Engineering and Management, KICEM, 7(3), pp. 76-85.
|