• 제목/요약/키워드: 기초공사

검색결과 1,016건 처리시간 0.034초

Development of the Automated Vertical Controllable Pilot-type Equipment for Improving Construction Performance of PHC Piles (PHC 파일 시공성능향상을 위한 연직 자동제어 파일롯타입의 개발)

  • Cho Chang-Yeon;Lee Junbok;Kim Han-Soo;Kim Jeoung-Tae;Cho Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • 제5권2호
    • /
    • pp.72-80
    • /
    • 2004
  • The objective of the research is to develop the automated vertical controllable pilot-type equipment for PHC piles. The motivation for the research is that inherent problems related to vertical control during pile driving. The paper explains the current vertical control methods and problems, design and manufacturing of the pilot-type automated equipment and its testing and discussions of the results.

A Study on the Efficiency of Earned Value Management System for Practical Application (공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안)

  • Lee Woo-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.500-503
    • /
    • 2003
  • Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.

  • PDF

정보통신공사비지수 개발에 관한 연구

  • Kim, Tae-Gyun;Jo, Hun-Hui;An, Cheol-Mo;Gwak, Jeong-Ho;Seo, Sun-Seok;Kim, Yeong-Sam;Kim, Seo-Gyeong;Kim, Jin-Ho
    • Information and Communications Magazine
    • /
    • 제29권7호
    • /
    • pp.89-96
    • /
    • 2012
  • 정보통신공사의 공사비 산정은 그동안 원가계산 방식으로 이루어져 왔으나, 최근 들어 건설 및 전기분야에서와 같이 실적공사비를 활용할 수 있도록 제도 시행을 추진하고 있다. 그러나 실적공사비를 적용하기 위해서는 과거 공사비 실적자료를 현가화 할 수 있는 지수의 개발이 전제되어야 함에도, 그동안 정보통신공사는 한국건설기술연구원의 통신공사비지수(기타 특수건설의 최하위지수)나 한국은행의 생산지물가지수를 이용할 수밖에 없는 한계를 지니고 있었다. 이에 본 연구에서는 실적적산 데이터를 기반으로 정보통신공사의 특성을 고려한 정보통신공사비지수를 제시하고자 한다. 개발된 지수는 실적공사비 자료의 현가화 뿐 아니라, 물가변동에 따른 계약단가 조정(Escalation), 정보통신분야의 거시적인 동향을 파악할 수 있는 주요 지표로 정보통신공사의 사업비산정 및 관련 분야의 기초자료로 활용될 수 있다.

장기방치공사 재개시 공사계획 및 관리

  • Cho, Sang-Young;Jung, Yong-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • 제4권1호
    • /
    • pp.8-15
    • /
    • 2004
  • 1997년 11월 IMF 영향에 따른 ○○건설사의 부도로 인해 1년동안 ('97. 11∼'98. 11) 공사가 중단된 채 방치되어 많은 문제점을 안고 공사를 재개하지 못하고 있는 현장이 전국에는 아직도 100여개 정도 산재해 있는 것으로 알고 있다. 이와 같은 현장의 공사재개를 위해서는 다음과 같은 문제점을 검토해야 한다. 첫째 기술적 문제점으로는 기초와 지하주차장 골조공사가 일부 시공중 중단되어 철근이 1년 동안 방치된 채 부식되어 있어 구조물 안전진단은 물론 부도에 따른 기 시공 협력업체들의 채무정리(22개사)에 대한 문제가 해결되지 많아 공사의 재개에 많은 어려움이 있으므로 충분한 사전검토가 필요하다. 둘째 외부적 문제점으로는 그동안 공사중단으로 인한 입주자들에 대한 신뢰확보 즉 조합 및 분양자들이 건설사의 부도로 인한 중도금 납입 거부상태는 물론 선납금, 연체이자 등의 경제적 피해 손실로 발주처에 대한 집단소송 진행 등에 따른 건설사 및 발주처에 대한 불신 해소를 어떻게 하느냐가 공사재개의 중요한 관건이었다.(중략)

Curing Method Designation System in Mat Foundation Construction (매트기초 건설을 위한 양생방법 선정시스템)

  • Lee, Tae-Gyu
    • The Journal of the Korea Contents Association
    • /
    • 제12권8호
    • /
    • pp.366-372
    • /
    • 2012
  • In most of construction work, especially mat foundation construction, it is very important that accidents be prevented at early aged construction stage. To reduce the risk of accidents, it is necessary to choose the curing method to provide instructions for safety forming work by proper curing of concrete after placing. Therefore, this paper has proposed a designation algorithm of curing method for representing curing type and period by analyzing the transient hydration heat solution, focusing on mat foundation construction. This has been implemented, moreover, using an object oriented programming language to develop structural analysis system taking account crack index. In addition, we present in this paper a safety curing management system developed to assess risk during forming work.

A Preliminary Study for the Simulation Model of Soil Duffusion (토사 확산 Simulation Model 개발의 기초연구)

  • 신문섭;이종남
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 한국해안해양공학회 1993년도 정기학술강연회 발표논문 초록집
    • /
    • pp.90-97
    • /
    • 1993
  • 매입과 준설공영를 할 때 발생하는 현탁물질의 문제는 수역 환경보존의 입장에서 공사관계자들에게 높은 관심을 보이고 있다. 그리고 이러한 현탁물질의 발생정도는 시공법, 공사규모, 주변의 지형과 흐름상장에 의하여 좌우되며 또한 현탁물질에 의한 영향은 현탁물질의 정도, 공사기간, 수역의 이용상태, 공사에 사용하고 있는 토사의 양, 입도분포, 저토의 특성(입경등)에 따라서 좌우된다. (중략)

  • PDF

Comparative Analysis of Conventional Tact and Compositive Tact in Apartment House Finishing Construction (공동주택 마감공사의 기존 Tact와 복합병행 Tact 비교분석 - 공동주택 미장공사 중심으로 -)

  • Hwang, SuHyeon;Sim, JeaHyung;Ham, NamHyuk;Kim, JaeJun
    • Korean Journal of Construction Engineering and Management
    • /
    • 제23권4호
    • /
    • pp.47-56
    • /
    • 2022
  • In a construction project, process planning is an important factor in determining the success or failure of a project. In particular, it is necessary to systematically establish a process plan in the early stage because the finishing work of an apartment house involves more interference than the foundation work or the frame work. First, in this study the problems of Tact process management were identified, Based on the data from the case project, conventional Tact process management and compositive Tact process management were compared and analyzed. Second, cost analysis was performed on applicable plastering work to suggest the necessity and direction of compositive Tact process management. Third, the appropriateness of manpower according to the number of construction households is analyzed through cost analysis. Through this, the validity and effectiveness of compositive Tact process management were verified based on the results derived from this study.

A Study on Maintaining Control of Tension for a Catenary's Cable (현수형 가선 케이블의 정장력 유지제어에 관한 연구)

  • Yoon, Jung-Hwan;Hong, Soon-Ill;Kim, Chunl-Woo
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 D
    • /
    • pp.2339-2341
    • /
    • 2000
  • 본 논문은 제어대상인 현수형 케이블의 수학적 모델을 작성하고 이것에 장력을 발생하는 교류서보 전동기의 수학적 모델을 구하였다. 제어 방법은 제어대상의 동적 모델이 비선형 시변계이기 때문에 강인성이 있는 퍼지제어를 적용하고 차대가 움직이기 시작할 때 발생하는 오버슈트을 억제하기 위해서 피드포워드제어를 채택한다. 케이블의 동적 모델에 기초하여 퍼지제어기와 피드포워드제어를 도입하여 시스템을 구성하고 시뮬레이션 실험에 의해 그 유효성을 평가하였다. 현재 로프제조 공정, 전차 트롤리선 가설공사는 장력의 제어가 필요하지만 거의 수동으로 행하고 있는 실정이고 제품의 균질성과 생산성 향상을 위하여 제조 공정의 자동화가 필요하다. 따라서 전차의 트롤리선 가설공사는 케이블을 탑재한 차대가 주행하면서 드럼에 감긴 케이블을 풀어주고 양단의 장력을 일정히 유지하도록 조절할 필요가 있다. 그러나 전기공사에서 시행하고 있는 송 배전 선로의 전력케이블 가선공사나 전차 트롤리선 가설공사는 수동으로 하고 있는 실정이고 이것의 자동화기계가 필요하다. 따라서 본 연구의 목적은 현수형 가선 케이블 가설장치의 자동화이다. 본 연구에서는 제어대상인 현수형 케이블의 수학적 모델을 작성하고 이것에 장력을 발생하는 교류서보 전동기의 수학적 모델을 구하였다. 제어 방법은 제어대상의 동적 모델이 비선형 시변계이기 때문에 강인성이 있는 퍼지제어를 적용하고 차대가 움직이기 시작할 때 발생하는 오버슈트를 억제하기 위해서 피드포워드제어를 채택한다. 케이블의 동적 모델에 기초하여 퍼지제어기와 피드포워드제어를 도입하여 시스템을 구성하고 시뮬레이션 실험에 의해 그 유효성을 평가하였다.

  • PDF

Estimation of Bearing Capacity for In-Situ Top-Base Method by Field Experimental Plate Load Test (현장평판재하시험에 의한 현장타설형 팽이말뚝기초의 지지력산정)

  • Shin, Eun-Chul;Ahn, Min-Hye
    • Journal of the Korean Geosynthetics Society
    • /
    • 제10권1호
    • /
    • pp.1-8
    • /
    • 2011
  • The problems like a deterioration of loading bearing capacity, an exaggeration of settlement and lateral deformation are able to be generated, meanwhile structures are built in soft ground. Top-Base method is belonged to a rigidity mat foundation method which is used to surface treatment of soft ground. This method makes an effect to increase the bearing capacity of foundation using friction force, and prevent the differential settlement. Further more, the In-Situ Top-Base method has advantages in the phase of economic effect by reduction of the construction cost and offers an expediency on construction comparing with precast products. This paper presents the way of the estimation of bearing capacity for In-Situ Top-Base method through field plate load test in soft ground. It utilizes the results to a future design by analyzing the properties in the existing study and designs through these analysis and calculating the top-base method's reasonable range.

법령과고시(3) - 지방계약법 시행령 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • 통권293호
    • /
    • pp.98-99
    • /
    • 2014
  • 지방자치단체의 계약업무에 기초가 되는 지방계약법 시행령이 지난 11월 24일 공포되어 시행에 들어갔다. 이번 지방계약법 개정은 지난 해 12월 30일 개정된 국가계약법 시행령 제68조와 동일하게 제77조를 신설하여 '하자책임 구분이 용이하고 공정관리에 지장이 없는 공사에 대하여 기계설비공사와 같은 '설계서가 별도로 작성되는 공사로 명시함으로써 공공공사의 분리발주 활성화를 유도하는 내용을 담고 있다. 이로써 지방계약법에도 분리발주 허용 대상을 구체화 하고 발주기관의 장이 공사의 예산편성과 기본설계 등 사업의 계획단계부터 분리발주의 가능 여부 검토 조항이 명문화 됨으로써 지자체 분리발주가 더욱 활성화 될 것으로 예상된다. 이에 앞서 대한설비건설협회는 분리발주 법제화를 정부, 국회, 제18대 대선후보 등에 지속적으로 건의한 결과 박근혜 정부가 공공공사의 분리발주 법제화가 포함된 40대 중점 국정과제를 확정하고 공공공사의 분리발주 허용 대상과 활성화 조문이 포함된 국가계약법 시행령 제68조를 지난해 12월 30일 개정, 시행에 들어간 바 있다.

  • PDF