Cho Chang-Yeon;Lee Junbok;Kim Han-Soo;Kim Jeoung-Tae;Cho Moon-Young
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.72-80
/
2004
The objective of the research is to develop the automated vertical controllable pilot-type equipment for PHC piles. The motivation for the research is that inherent problems related to vertical control during pile driving. The paper explains the current vertical control methods and problems, design and manufacturing of the pilot-type automated equipment and its testing and discussions of the results.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.500-503
/
2003
Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.
Kim, Tae-Gyun;Jo, Hun-Hui;An, Cheol-Mo;Gwak, Jeong-Ho;Seo, Sun-Seok;Kim, Yeong-Sam;Kim, Seo-Gyeong;Kim, Jin-Ho
Information and Communications Magazine
/
v.29
no.7
/
pp.89-96
/
2012
정보통신공사의 공사비 산정은 그동안 원가계산 방식으로 이루어져 왔으나, 최근 들어 건설 및 전기분야에서와 같이 실적공사비를 활용할 수 있도록 제도 시행을 추진하고 있다. 그러나 실적공사비를 적용하기 위해서는 과거 공사비 실적자료를 현가화 할 수 있는 지수의 개발이 전제되어야 함에도, 그동안 정보통신공사는 한국건설기술연구원의 통신공사비지수(기타 특수건설의 최하위지수)나 한국은행의 생산지물가지수를 이용할 수밖에 없는 한계를 지니고 있었다. 이에 본 연구에서는 실적적산 데이터를 기반으로 정보통신공사의 특성을 고려한 정보통신공사비지수를 제시하고자 한다. 개발된 지수는 실적공사비 자료의 현가화 뿐 아니라, 물가변동에 따른 계약단가 조정(Escalation), 정보통신분야의 거시적인 동향을 파악할 수 있는 주요 지표로 정보통신공사의 사업비산정 및 관련 분야의 기초자료로 활용될 수 있다.
Journal of the Korea Institute of Building Construction
/
v.4
no.1
/
pp.8-15
/
2004
1997년 11월 IMF 영향에 따른 ○○건설사의 부도로 인해 1년동안 ('97. 11∼'98. 11) 공사가 중단된 채 방치되어 많은 문제점을 안고 공사를 재개하지 못하고 있는 현장이 전국에는 아직도 100여개 정도 산재해 있는 것으로 알고 있다. 이와 같은 현장의 공사재개를 위해서는 다음과 같은 문제점을 검토해야 한다. 첫째 기술적 문제점으로는 기초와 지하주차장 골조공사가 일부 시공중 중단되어 철근이 1년 동안 방치된 채 부식되어 있어 구조물 안전진단은 물론 부도에 따른 기 시공 협력업체들의 채무정리(22개사)에 대한 문제가 해결되지 많아 공사의 재개에 많은 어려움이 있으므로 충분한 사전검토가 필요하다. 둘째 외부적 문제점으로는 그동안 공사중단으로 인한 입주자들에 대한 신뢰확보 즉 조합 및 분양자들이 건설사의 부도로 인한 중도금 납입 거부상태는 물론 선납금, 연체이자 등의 경제적 피해 손실로 발주처에 대한 집단소송 진행 등에 따른 건설사 및 발주처에 대한 불신 해소를 어떻게 하느냐가 공사재개의 중요한 관건이었다.(중략)
In most of construction work, especially mat foundation construction, it is very important that accidents be prevented at early aged construction stage. To reduce the risk of accidents, it is necessary to choose the curing method to provide instructions for safety forming work by proper curing of concrete after placing. Therefore, this paper has proposed a designation algorithm of curing method for representing curing type and period by analyzing the transient hydration heat solution, focusing on mat foundation construction. This has been implemented, moreover, using an object oriented programming language to develop structural analysis system taking account crack index. In addition, we present in this paper a safety curing management system developed to assess risk during forming work.
Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
/
1993.07a
/
pp.90-97
/
1993
매입과 준설공영를 할 때 발생하는 현탁물질의 문제는 수역 환경보존의 입장에서 공사관계자들에게 높은 관심을 보이고 있다. 그리고 이러한 현탁물질의 발생정도는 시공법, 공사규모, 주변의 지형과 흐름상장에 의하여 좌우되며 또한 현탁물질에 의한 영향은 현탁물질의 정도, 공사기간, 수역의 이용상태, 공사에 사용하고 있는 토사의 양, 입도분포, 저토의 특성(입경등)에 따라서 좌우된다. (중략)
Korean Journal of Construction Engineering and Management
/
v.23
no.4
/
pp.47-56
/
2022
In a construction project, process planning is an important factor in determining the success or failure of a project. In particular, it is necessary to systematically establish a process plan in the early stage because the finishing work of an apartment house involves more interference than the foundation work or the frame work. First, in this study the problems of Tact process management were identified, Based on the data from the case project, conventional Tact process management and compositive Tact process management were compared and analyzed. Second, cost analysis was performed on applicable plastering work to suggest the necessity and direction of compositive Tact process management. Third, the appropriateness of manpower according to the number of construction households is analyzed through cost analysis. Through this, the validity and effectiveness of compositive Tact process management were verified based on the results derived from this study.
본 논문은 제어대상인 현수형 케이블의 수학적 모델을 작성하고 이것에 장력을 발생하는 교류서보 전동기의 수학적 모델을 구하였다. 제어 방법은 제어대상의 동적 모델이 비선형 시변계이기 때문에 강인성이 있는 퍼지제어를 적용하고 차대가 움직이기 시작할 때 발생하는 오버슈트을 억제하기 위해서 피드포워드제어를 채택한다. 케이블의 동적 모델에 기초하여 퍼지제어기와 피드포워드제어를 도입하여 시스템을 구성하고 시뮬레이션 실험에 의해 그 유효성을 평가하였다. 현재 로프제조 공정, 전차 트롤리선 가설공사는 장력의 제어가 필요하지만 거의 수동으로 행하고 있는 실정이고 제품의 균질성과 생산성 향상을 위하여 제조 공정의 자동화가 필요하다. 따라서 전차의 트롤리선 가설공사는 케이블을 탑재한 차대가 주행하면서 드럼에 감긴 케이블을 풀어주고 양단의 장력을 일정히 유지하도록 조절할 필요가 있다. 그러나 전기공사에서 시행하고 있는 송 배전 선로의 전력케이블 가선공사나 전차 트롤리선 가설공사는 수동으로 하고 있는 실정이고 이것의 자동화기계가 필요하다. 따라서 본 연구의 목적은 현수형 가선 케이블 가설장치의 자동화이다. 본 연구에서는 제어대상인 현수형 케이블의 수학적 모델을 작성하고 이것에 장력을 발생하는 교류서보 전동기의 수학적 모델을 구하였다. 제어 방법은 제어대상의 동적 모델이 비선형 시변계이기 때문에 강인성이 있는 퍼지제어를 적용하고 차대가 움직이기 시작할 때 발생하는 오버슈트를 억제하기 위해서 피드포워드제어를 채택한다. 케이블의 동적 모델에 기초하여 퍼지제어기와 피드포워드제어를 도입하여 시스템을 구성하고 시뮬레이션 실험에 의해 그 유효성을 평가하였다.
The problems like a deterioration of loading bearing capacity, an exaggeration of settlement and lateral deformation are able to be generated, meanwhile structures are built in soft ground. Top-Base method is belonged to a rigidity mat foundation method which is used to surface treatment of soft ground. This method makes an effect to increase the bearing capacity of foundation using friction force, and prevent the differential settlement. Further more, the In-Situ Top-Base method has advantages in the phase of economic effect by reduction of the construction cost and offers an expediency on construction comparing with precast products. This paper presents the way of the estimation of bearing capacity for In-Situ Top-Base method through field plate load test in soft ground. It utilizes the results to a future design by analyzing the properties in the existing study and designs through these analysis and calculating the top-base method's reasonable range.
지방자치단체의 계약업무에 기초가 되는 지방계약법 시행령이 지난 11월 24일 공포되어 시행에 들어갔다. 이번 지방계약법 개정은 지난 해 12월 30일 개정된 국가계약법 시행령 제68조와 동일하게 제77조를 신설하여 '하자책임 구분이 용이하고 공정관리에 지장이 없는 공사에 대하여 기계설비공사와 같은 '설계서가 별도로 작성되는 공사로 명시함으로써 공공공사의 분리발주 활성화를 유도하는 내용을 담고 있다. 이로써 지방계약법에도 분리발주 허용 대상을 구체화 하고 발주기관의 장이 공사의 예산편성과 기본설계 등 사업의 계획단계부터 분리발주의 가능 여부 검토 조항이 명문화 됨으로써 지자체 분리발주가 더욱 활성화 될 것으로 예상된다. 이에 앞서 대한설비건설협회는 분리발주 법제화를 정부, 국회, 제18대 대선후보 등에 지속적으로 건의한 결과 박근혜 정부가 공공공사의 분리발주 법제화가 포함된 40대 중점 국정과제를 확정하고 공공공사의 분리발주 허용 대상과 활성화 조문이 포함된 국가계약법 시행령 제68조를 지난해 12월 30일 개정, 시행에 들어간 바 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.