Analysis and Realistic Estimation of Maintenance Cost of Construction Equipment Expenses (건설기계 경비의 관리비 구성 분석 및 현실화)

  • Kim, Kyung-A;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.503-508
    • /
    • 2007
  • The Equipment Expenses section of the Poom-Saem, that is used for Construction Cost Estimation on public sectors in Korea, has been rarely revised, and so does not reflect changes of construction equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of maintenance costs(Interest, Storage, Insurance, Tax), the equipment expenses section of the Poom-Saem and the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. Based on results from analysing figures related with the estimation of maintenance costs, the maintenance cost is redefined. Then, construction equipment was classified into 6 exclusive construction equipment and general one, and realistic figures of the maintenance cost, which consists of interest, storage, insurance, tax, are suggested respectively. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation that helps to estimate appropriate construction costs and the ground work of related studies.

  • PDF

How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem (시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안)

  • Ahn, Bang-Ryul;Huh, Youngki;Kim, Dae Young;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki;Ahn, Bang-Ryul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.37-42
    • /
    • 2008
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan($2004{\sim}2006$) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, 1,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

Estimation of Construction Equipment Expenses - Bulldozer and Loader - (표준품셈의 기계경비 산정 현실화를 위한 자료 조사.분석 -불도우저와 로우더를 중심으로-)

  • Huh, Young-Ki;Kim, Kyung-A;Ahn, Bang-Ryul;Tae, Yong-Ho;Park, Hee-Sung;Kim, Chang-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.155-166
    • /
    • 2008
  • The Equipment Expenses section of the Poom-Saem that is used for Construction Cost Estimation of public sectors in Korea has been rarely revised, and so does not reflect changes of Construction Equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of equipment expenses for a bulldozer and a loader, the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1 (시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Kim, Dae;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.397-404
    • /
    • 2015
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Public construction projects are typically estimated using the Poom-Saem which includes hourly rates for workers and equipments. Despite its importance, the construction equipment cost may not properly reflect the current market value because it is being updated every six years at most. To keep the data for construction equipment cost estimation up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a wide gap to directly adopt the standard market price for updating the construction equipment prices. Therefore, this paper suggests an effective way to develop an ordinary management systems for updating construction equipment prices in the Poom-saem based on the standard market price.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.219-224
    • /
    • 2007
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan(2004${\sim}$2006) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, l,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

  • PDF

Development of Cost Estimate System of Construction Equipment through Analysing Its Domestic Rental Market (임대실태 분석을 통한 건설기계경비 산정시스템 개발)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Suh, Sang-Wook;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.121-132
    • /
    • 2012
  • The current estimation system of construction equipment cost was first introduced in 1960's when general contractors had ownership of equipment. However, most of construction equipment in construction sites has been rented from equipment leasing company these days. Therefore, the improvement of current cost estimation system is therefore inevitable in order to advance domestic construction industry. This study is aimed to suggest the improved system by analyzing nationwide market rental rates of major construction equipment. A user friendly prototype of actual database grounded on actual market rental rates collected from over 200 leasing companies in the nation was proposed. The database includes various rates and statistics analyzed by different form of contract as well as different region. Using the collected data, "The Cost Estimate System in Construction Equipment Database" was developed by using VBA(Visual Basic for Applications). The system makes users convenient to utilize the rental rates by choosing equipment and region, and various types of contract.

A Study on the Improvement of Construction Cost Standards for Pipe Laying and Joining Work (관 부설 및 접합공사 공사비산정기준 개선에 관한 연구)

  • Oh, Jae-Hoon;Ahn, Bang-Ryul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.675-684
    • /
    • 2020
  • To prevent safety accidents caused by aging pipe infrastructure and to maintain water quality, construction projects for water and sewage pipes are actively conducted across Korea. This study analyzed the criteria situations, site survey details, and regulation revisions related to the calculation of construction cost standards for pipe laying and joining work. The analysis showed that the major causes for revision are the unclear construction scope, limitations in implementing some pipe materials due to installation facility types, workforce focused on ordinary labor, limitations of manual laying work, and the lack of tool hire cost and machine expense-calculation criteria. Field studies were conducted to categorize the pipes according to their features, in addition to identifying the use of lifting heavy equipment and light equipment. In addition, excavation and testing work conducted in connection to pipe laying, as well as the use of skilled labor, were investigated. The current study clarified the work scope through new common items, provides an organization based on the pipe material, adjusted the workforce ratio to focus more on skilled labor, and developed grounds for calculating machine expenses. These revisions were estimated to save approximately 1.28% of the construction costs in each project according to an analysis of the construction cost impact study. truction costs in each project, according to an analysis of construction cost impact study.