Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit (모듈러 경제성 확보를 위한 공장생산 프로세스의 다기능공 적용 방안)

  • Kim, Hakcheol;Hwang, Youngkyu;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.11-19
    • /
    • 2014
  • The Construction industry is a labor-intensive industry that its labor cost takes up about 30~40% out of the whole construction cost. However, due to a stereotype that on-site work is a 3D job there is a shortage of the labor forces. Modular construction method is to produce modular units in the plant so that workers could work stably. Also, after delivering the module from plant to the site, there will be only installment to be required that shortens construction duration. Even though the modular market is currently expanding based on military facilities in Korea, its best strengths are not demonstrated well which are shortened construction period and low cost. It also causes labor problem of production due to minimum utilization of the modular construction method. Multi-skilled labor means a technician that is able to perform more than two kinds of work with more than two techniques. Multi-skilled labor can proceed smoothly by figuring out the connectivity between the precedent and following operations. Therefore, this research is to apply the concept of Multi-skilled labors, suggest solutions and allocate manpowers efficiently. As a result, it helps to decrease idle manpowers during the operation and the total labor forces can be saved. Low cost is the original strength of the modular which can stand out so the modular market is expected to expand.

A Study on the Improvement of the Design VE Process using VE Idea-DataBank System (설계 VE 프로세스 개선을 위한 VE Idea-DataBank System 구축에 관한 연구 - 한국도로공사 고속도로 건축공사를 대상으로 -)

  • Park, Heetaek;Park, Chansik;Jung, Wooseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2014
  • Construction value engineering(VE) is often performed in the form of a short term review of designs, rather than during a regular workshop with a standardized work plan, and its application method is limited. Thus, tasks are performed by applying the method in reverse depending on the VE results, and function analysis, a key VE method, is omitted or only applied for the sake of formality. In addition, it is hard to expect great results from VE because of insufficient time and budget allowed to perform VE and a lack of understanding of VE procedures and methods. In particular, the methods used to store and reuse the tremendous amount of ideas and information created during the process of VE implementation is not systematic. Even the Korea Expressway Corporation, which has produced relatively systematic VE performance compared to other institutions, has had the above-mentioned problems. Therefore, this study aims to improve existing VE processes and suggest a method to efficiently store and retrieve VE information by analyzing the limitations of construction VE practice and the characteristics of VE for highway facilities as part of improving design VE performance.

Improvement of Patient Safety and Inspection Satisfaction by Developing Pretreatment Process System with the Patients Who Reserved CT Enhance Examination (CT 조영검사 예약환자의 전처치 프로세스 시스템 개발을 통한 환자안전 및 검사 만족도 향상)

  • Beom, Hyinam;Han, Jaebok;Song, Jongnam;Kim, Wook;Choi, Namgil
    • Journal of the Korean Society of Radiology
    • /
    • v.10 no.1
    • /
    • pp.29-37
    • /
    • 2016
  • This study aims to improve the satisfaction level of the patient who undergoes CT contrast examination by developing and applying pretreatment process system, which not only can reduce the side effects caused by the test but also can help carry out the test smoothly. The subjects were 214 patients who booked CT contrast examination from January 2014 to February 2014 but could not carry out their test on schedule. We analyzed the reasons for the delay and conducted follow-up survey on them. We analyzed the usefulness of pretreatment process system by contemplating and developing pretreatment process system and applying it to the patients for whom follow-up survey was conducted from January 2015 to February 2015. The number of outpatients who came to the hospital form January to February 2014 was 2,846 and the number of patients who could not undergo the test was 214, accounting for 7.52% of the total. The specific reason for the delay includes 214 cases of unknown creatinine 98 with 120 minutes of average delay time, 40 cases of creatinine over 1.3(19%) with 30minutes of average delay time, 34 cases of past contrast media side effect 6% with 40 minutes of average delay time and 25 cases of lack of pretreatment such as fasting, etc. 11% with 120minutes of average delay time. The number of CT scan has been increasing ever since the development of CT and the frequency of using the contrast media is expected to increase. If we can employ pretreatment process system in order to effectively control the side effect of contrast media and help the CT contrast examination to be smoothly conducted on schedule, I'm sure we could improve the quality of our medical service and increase our patients' satisfaction who come to our CT scan room.

Analysis of the Construction Process Managed by the U.S. Army Corps of Engineers Far East District Using IDEF0 (주한미군공사 수행을 위한 FED(Far East District) 프로세스 분석에 관한 연구)

  • Hwang, Jae-Hong;Ham, Nam-Hyuk;Kim, Je-Hyuck;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.163-173
    • /
    • 2010
  • A significant number of projects have been managed by US Army Corps of Engineers FED. Today, more information must be provided to the parties involved in the projects by phase than ever before. Specifically, USFK`s construction projects have been managed by FED(Far East District). Recently, however, large US private construction companies have been filling the role previously taken by FED. However, there is few construction managers to implement FED project in Korea. Accordingly, this study analyzes FED projects practices with focus on the construction management actors in order to suggest guideline. This study suggests a model FED construction process(Bid, Contract, Construction, As-Built Phase) by analyzing the existing FED project process using a IDEF0 methodology.

Development of 3-Dimensional Rebar Detail Design and Placing Drawing System (3차원 배근설계 및 배근시공도 작성 자동화 시스템 개발)

  • Choi, Hyun-Chul;Lee, Yunjae;Lee, Si Eun;Kim, Chee Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.4
    • /
    • pp.289-296
    • /
    • 2014
  • The rebar detailing is an important work influencing the final performance and quality of RC structures. But it is one of the most irrational and illogical activity in construction site. Many groups of workers, including main contractors, structural engineers, shop drawers, rebar fabricators, and etc., participate in this activity. A loosely-organized process for this activity is apt to produce a big amount of rebar loss or even degraded structures. A 3-dimensional rebar auto-placing system, called as Rebar Hub, has been designed and implemented in this research. Rebar Hub provides a totally integrated service from 3D structural modeling of buildings to rebar auto-placing considering anchorage, splice, and the length of ordered rebar. In addition, Rebar Hub can recognize the 2D drawing CAD files and then build 3D structural models which are used for the start point of 3D rebar auto-placing. After rebar auto-placing, each members of the 3D structural model have rebar information belonging to them. It means that the rebar information can be used for the afterward works such as quantity-survey, manufacturing and fabrication of rebars. Rebar Hub is showing outstanding performance while applying to practical projects. It has almost five times productivity and reduces the rebar loss up to 3~8% of the initially-surveyed amount of rebar.

A Study on the Integrated Control and Safety Management System for 9% Ni Steel LNG Storage Tank (9% 니켈강재식 LNG 저장탱크용 통합제어안전관리시스템에 관한 연구)

  • Kim, Chung-Kyun
    • Journal of the Korean Institute of Gas
    • /
    • v.14 no.5
    • /
    • pp.13-18
    • /
    • 2010
  • This paper presents the development of an integrated control and safety management system for 9% nickel steel LNG storage tank. The new system added the measuring equipment of pressure, displacement and force compared to the conventional measurement and control system. The measured data has simultaneously been processed by integrating and analyzing with new control equipments and safety management systems. The integrated control and safety management system, which may increase a safety and efficiency of a super-large full containment LNG storage tank, added additional pressure gauges and new displacement/force sensors at the outer side wall and a welding zone of a stiffener and top girder of an inner tank, and the inner side wall of a corner protection tank. The displacement and force sensors may provide failure clues of 9% nickel steel structures such as an inner tank and a corner protection, and a LNG leakage from the inner tank. The conventional leak sensor may not provide proper information on 9% nickel steel tank fracture even though LNG is leaked until the leak detector, which is placed at the insulation area between an inner tank and a corner protection tank, sends a warning signal. Thus, the new integrated control and safety management system is to collect and analyze the temperature, pressure, displacement, force, and LNG density, which are related to the tank system safety and leakage control from the inner tank. The digital data are also measured from control systems such as displacement and force of 9% nickel steel tank safety, LNG level and density, cool-down process, leakage, and pressure controls.

Development of a Fleet Management System for Cooperation Among Construction Equipment (건설장비 협업을 위한 플릿관리 시스템 개발)

  • Ahn, Seo-Hyun;Kim, Sung-Keun;Lee, Kwan-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.573-586
    • /
    • 2016
  • In construction jobs, a combination of various kinds of machinery is used to perform earthworks at a large-scale site. Individual equipments essentially cooperate with each other on task such as excavation, load, transfer and compaction. While other area have studied cooperation system, related study in domestic construction is in poor condition. In this study, construction equipment fleet management system is developed for solving this problem and find way to improving efficiency in earthworks site. The entire concept of the fleet management system, including its components and process, has been systematically outlined in this paper. An operational methodology has also been suggested, where a number of machines, such as the excavators, trucks and compactors, are chosen and further grouped into a cluster. A case study verify fleet management system's effectiveness on performing task package by comparing existing work method with methodology in this study. Fleet management system in this study is expected to curtail fuel consumption by the reduction of working time and moving distance. Furthermore, it can be anticipated to declining carbon emission effect.

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

A Study on the Evaluation Management of Public Housing Architectural Competition using BIM (공공 공동주택의 BIM적용 설계 경기 평가관리에 한 연구 - BIM적용 가능 평가항목 선정을 중심으로 -)

  • Min, Byoung-Jik;Lim, Jae-Bok;Kim, Ju-Hyung;Seo, Jong-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.1-9
    • /
    • 2012
  • In Korea, recently, efforts have been made to introduce BIM(Building Information Modeling) to housing complex projects. However, there have been several problems including excessive competition for building design and outcome-oriented evaluation due to a lack of clear evaluation criteria and poorly organized management process. Under this circumstance, the study surveyed opinions of project managers and conducted a pilot test to improve evaluation criteria of BIM-based design for housing complexes. The objective is to assess the level of BIM technology and its applicability, and to propose a list of reasonable evaluation criteria for better project management. First, the study examined the current condition of evaluation on the BIM-based housing complexes, and identified 15 preliminary items that might be suitable for application of BIM. Second, the study conducted a pilot test for the 15 items to determine their suitability for the level of BIM technology, clarity of the calculation process, and the extent of fulfilling information quality, and short-listed eight items for application of BIM. In particular, in the design concept stage, mostly 3D visual images and area-related items are suitable for BIM-based evaluation. Accordingly, formerly used items such as project cost, energy and environmental analysis, building structure, and facilities were deemed more relevant to the subsequent stages of basic design and its implementation.

Design and Implementation of Multiple Filter Distributed Deduplication System Applying Cuckoo Filter Similarity (쿠쿠 필터 유사도를 적용한 다중 필터 분산 중복 제거 시스템 설계 및 구현)

  • Kim, Yeong-A;Kim, Gea-Hee;Kim, Hyun-Ju;Kim, Chang-Geun
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.10
    • /
    • pp.1-8
    • /
    • 2020
  • The need for storage, management, and retrieval techniques for alternative data has emerged as technologies based on data generated from business activities conducted by enterprises have emerged as the key to business success in recent years. Existing big data platform systems must load a large amount of data generated in real time without delay to process unstructured data, which is an alternative data, and efficiently manage storage space by utilizing a deduplication system of different storages when redundant data occurs. In this paper, we propose a multi-layer distributed data deduplication process system using the similarity of the Cuckoo hashing filter technique considering the characteristics of big data. Similarity between virtual machines is applied as Cuckoo hash, individual storage nodes can improve performance with deduplication efficiency, and multi-layer Cuckoo filter is applied to reduce processing time. Experimental results show that the proposed method shortens the processing time by 8.9% and increases the deduplication rate by 10.3%.