Development of 3-Dimensional Rebar Detail Design and Placing Drawing System |
Choi, Hyun-Chul
(Design Team, Changsoft I&I)
Lee, Yunjae (Design Team, Changsoft I&I) Lee, Si Eun (Division of Information & Communication System, Baekseok Univ.) Kim, Chee Kyeong (Division of Architectural Engineering, Sunmoon Univ.) |
1 | Cho, K.J., Lee, J.H. (2009) An Efficient Algorithm for Rebar Element Generation Using 3D CAD Data, Journal of the Computational Structural Engineering Institute of Korea, 22(5), pp.475-486. 과학기술학회마을 |
2 | Goh, I.D., Choi, J.H., Kim, E.D., Lee, J.M. (2009) Extracting Building Element Geometry from BIM/IFC Physical Files, Journal of the Computational Structural Engineering Institute of Korea, 22(2), pp.163-172. 과학기술학회마을 |
3 | Lee, K.W. (1999) Principle of CAD/CAM/CAE systems, Addison Wesley, USA. |