An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

Improvement of Construction Process management dividing the work area reasonably in Building Construction (작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선)

  • Yoon You-Sang;Joung Young-Kwon;Suh Sang-Wook;Shin Dong-Woo;Kim Chang-Duk;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.59-65
    • /
    • 2003
  • The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.

CPM Bar Chart Technique for Construction Scheduling (CPM Bar Chart 기법을 활용한 일정계획)

  • Kim Kyung-Hwan;Kim Soo-Yoo;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.135-142
    • /
    • 2004
  • This paper proposes the CPM bar chart (CBC), a hybrid of the bar chart and the critical pad method (CPM). The CBC overcomes shortages of the fenced bar chart, while still keeping advantages. The fence with direction is applied instead of the broken fence, which triggers considerable problems to identify and apply in the fenced bar chart. In addition, the notorious task to find dummy activities is no longer required. Upon the benefits of simplicity in the bar chart and logical work sequence in the CPM network. the CBC provides a relatively easy way to create and understand a schedule, thus improving communication quality between project participants. With the advantages, the CBC can also be effectively applied to various scheduling techniques such as resource constrained scheduling, resource leveling, scheduling with activity split, delay impact analysis, etc.

Development Process of Application Software for MMIS Simulation Facility (MMIS 모사설비의 응용 소프트웨어 개발 프로세스)

  • 박근옥;이종복;이준구
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2002.11a
    • /
    • pp.47-51
    • /
    • 2002
  • 전 규모에서 소규모에 이르는 MMIS(Man Machine Interface System) 모사설비는 실제의 원자력발전소에 사용될 MMIS를 응용 소프트웨어로 구동되는 모사환경을 통하여 사전에 시험 및 검증할 목적으로 사용된다. 기존의 MMIS 모사설비 개발은 잘 정의된 개발 프로세스에 기반을 두지 않고 프로젝트 관리자 또는 개발 담당자의 경험과 직관에 의존하여 수행되었다. 이로 인하여 MMIS 모사설비의 개발 일정이 지연되거나 개발의 결과가 초기목표를 만족하지 못하는 불만족 사항이 나타났다. 본 연구는 MMIS 모사설비의 응용 소프트웨어 개발을 위한 프로세스를 정의하고 이에 따라 설비개발을 진행하였다. 개발 프로세서는 계획 단계, 설계 및 구현단계, 시험단계의 세 부분으로 구성하였다. 본 논문에서는 MMIS 모사설비에 요구되는 일반적인 성능특성요건과 개발공정요건을 살펴보고, 본 연구가 정립한 응용 소프트웨어 개발의 프로세스 및 각 프로세서에서의 공정활동을 제시한다.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재소요계획모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.598-601
    • /
    • 2003
  • As the scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which can extract necessary information is increased. However, compare with large companies, medium-sized companies's organization of head office and management system is weak, so it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and have not associated with schedule information. So when schedule if changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

Short-term Scheduling Optimization for Subassembly Line in Ship Production Using Simulated Annealing (시뮬레이티드 어닐링을 활용한 조선 소조립 라인 소일정계획 최적화)

  • Hwang, In-Hyuck;Noh, Jac-Kyou;Lee, Kwang-Kook;Shin, Jon-Gye
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.1
    • /
    • pp.73-82
    • /
    • 2010
  • Productivity improvement is considered as one of hot potato topics in international shipyards by the increasing amount of orders. In order to improve productivity of lines, shipbuilders have been researching and developing new work method, process automation, advanced planning and scheduling and so on. An optimization approach was accomplished on short-term scheduling of subassembly lines in this research. The problem of subassembly line scheduling turned out to be a non-deterministic polynomial time problem with regard to SKID pattern’s sequence and worker assignment to each station. The problem was applied by simulated annealing algorithm, one of meta-heuristic methods. The algorithm was aimed to avoid local minimum value by changing results with probability function. The optimization result was compared with discrete-event simulation's to propose what pros and cons were. This paper will help planners work on scheduling and decision-making to complete their task by evaluation.

Development of simulation-based ship production execution system(SPEXS) for a panel block assembly shop (판넬블록 생산관리를 위한 시뮬레이션 기반 조선생산실행시스템 개발)

  • Lee, Kwang-Kook;Kim, Young-Hun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.11
    • /
    • pp.2313-2320
    • /
    • 2011
  • The management of a panel block shop in a shipyard is a complex process that entails the largest amount of work and in which many decisions are involved. Shipbuilders have considered the process as a bottleneck since every panel for every ship and offshore hull structure must be processed through the shop. In order to maximize process productivity, simulation-based ship production execution system(SPEXS) is proposed for panel block operations utilising discrete-event simulation and simulated annealing. An application of panel block assembly shop, called SPEX-Panel supports production planners by general dispatching rules and metaheuristics to make better scheduling decisions on the shop floor. In addition, the system will help increase productivity in the yard with continuous improvement.

A Survey of the Modeling of the Production Planning and Scheduling in an Integrated Steel Mill (일관제철소 생산계획 및 일정계획 모형에 관한 조사연구)

  • Seong, Deokhyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.263-281
    • /
    • 2017
  • Global optimization that considers the processes at integrated steel mills is more important than the local optimization to improve the efficiency of a single process. Research utilizing mathematical models at integrated steel mills predominantly focus on solving problems solely for a specific process or focusing on what techniques are applied to. However, it is important to define the problems that must be solved at the steelworks, identify the objectives and constraints that can be modeled, and selection of methodologies that can be applied to the problems. The purpose of this study is to investigate the problems in improving efficiency at integrated steel mills from the viewpoint of production & operations management. We review the research have been conducted in order to solve those problems. We classified the research into 6 categories and suggested future research direction based on the global optimization. It is expected that research themes for improving the efficiency at integrated steel mills will be derived.

A Study on the Application of TACT Planning & Scheduling in Finish Work of Apartment Houses (공동주택 마감공사에서의 택트공정관리 적용에 관한 연구)

  • Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-425
    • /
    • 2003
  • The purpose of this study is using a TACT planning and scheduling for apartment houses construction that have many of same units. Because using a TACT planning and scheduling is concluded time reduction at same units as apartment plan. The main contents of this study are 1) window and door work through the field study, 2) adjust worker assignment to minimize work time variation, and 3) an effect of working time through a case study. As a result, the total working time can be improved $21.2\%$ by using the TACT planning and scheduling. The stu요 recommends that 1) establish an accurate data between work period and resource, and 2) preparation to measures minimization of waiting time before using a TACT planning and scheduling.

  • PDF