• Title/Summary/Keyword: 공정 관리

Search Result 2,766, Processing Time 0.031 seconds

Hot Cell Facility for Demonstration of Advanced Spent Fuel Conditioning Process (사용후핵연료 차세대관리 종합공정 실증시설)

  • 정원명;구정회;조일제;국동학;이은표;백상열;이규일;유길성;박성원
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.331-336
    • /
    • 2003
  • The advanced spent fuel conditioning process(ACP) was proposed to reduce considerably the overall volume and radioactivity for effective management of the PWR spent fuel in respects on safety and economy. The ACP is under research and development, and have scheduled to perform hot test for demonstration of the ACP after several years. For hot test, hot cell facility of ${\alpha}{\gamma}$ type possess conservative safety is required essentially. A existing hot cell of ${\beta}{\gamma}$ type will be refurbished to minimize construction expenditures of hot cell facility. In this study, the design requirements are established, and the process detail work flow was analysed for the optimum arrangement to ensure effective process operation in hot cell. And also, the basic and detail design of hot cell facility and process and safety analysis was peformed to secure conservative safety of hot cell facility and process.

  • PDF

Requirement analysis and architecture establishment for ship production monitoring system (조선소 생산공정모니터링 시스템 개발을 위한 요구사항 분석 및 아키텍처 수립)

  • Lee, Kwangkook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.9
    • /
    • pp.2079-2086
    • /
    • 2014
  • Shipbuilding production management is one of the most significant activities in productivity improvement. Shop-floor managers and production planners still do not have enough production information for shop-floor scheduling due to shortage of information sharing among them. In this research, main issues were derived from requirement analysis between production planning and shop-floor control to establish a software system architecture for ship production monitoring system(SPMS), which is developed with component based design(CBD). The proposed system's key functions cover from block shop assembly to quay outfitting stage to visualize production progress as well as to maximize production information sharing. The system will allow more reliable and accurate production information to permeate down to members of the workforce just in time.

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

Development of a Materials Management System Considering Construction Supply Chain Management (건설공급사슬을 고려한 건설공사 자재관리시스템 개발)

  • Jang, Myung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.87-93
    • /
    • 2009
  • A construction supply chain needs an integrated information system, as the general contractor and subcontractors must communicate regularly with one another and share a substantial amount of information in their cooperative work. In the construction industry, supply chain management is necessary in the management of a system, including business process improvement, participant-oriented management, and the supply chain. This research proposed a supporting system and developed the prototype focusing on materials that play an important role in the supply chain. Construction projects are managed mainly through schedule management. As such, supply chain management should be linked with schedule management. The research implemented a prototype of the supporting system for construction supply chain management. The prototype was implemented in Microsoft Project using VBA, including a simulation tool based on @Risk for Project.

EWMA control chart for Katz family of distributions (카즈분포족에 대한 지수가중이동평균관리도)

  • Cho, Gyo-Young
    • Journal of the Korean Data and Information Science Society
    • /
    • v.21 no.4
    • /
    • pp.681-688
    • /
    • 2010
  • In statistical process control, the primary method used to monitor the number of nonconformities is the c-chart. The conventional c-chart is based on the assumption that the occurrence of nonconformities in samples is well modeled by a Poisson distribution. When the Poisson assumption is not met, the X-chart is often used as an alternative charting scheme in practice. And EWMA control chart is used when it is desirable to detect out-of-control situations very quickly because of sensitive to a small or gradual drift in the process.

Reengineering of TACT Process Management Analyzed on Task Information (업무정보 분석을 통한 TACT공정관리 프로세스 재설계)

  • Kim, Ok-Kyue;Park, Jun-Mo;Kim, Beop-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.113-124
    • /
    • 2012
  • TACT process reengineering is applied to the finish work of apartment buildings and extra tall buildings to conduct efficient process control in Korea. Non-systemized information on the performances, however, causes difficulties in building a database for such records and it takes long time to find the relevant information. In order to solve such problems, scientific and quantitative understanding on the construction information and data is required to perform TACT process reengineering satisfactorily and also proper management plan should be provided for the working level staff to understand the required information and data more easily. In this regard, this paper reorganizes the TACT process reengineering based on the general process control and classifies the items of required information to redesign. Redesigned process was verified by specialists making use of work-information matrix. As a result, paper contributed to increasing comprehension level of the working level people and when the persons in charge are transferred to other duty, it makes them understand all the working procedure faster, which enables the departments involved to carry out their cooperation and adjustment more efficiently.

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.

Plasma 공정에서 Gas Purge를 이용한 미세 Particle 제어방법 연구

  • Kim, Tae-Rang;Bang, Jin-Yeong;Gang, Tae-Gyun;Choe, Chang-Won;Yun, Tae-Yang
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2013.08a
    • /
    • pp.196.1-196.1
    • /
    • 2013
  • 반도체의 device design rule이 shrink 됨에 따라 공정이 난이도가 높아지고 이에 따른 관리가 어려워지고 있다. 특히 미세 particle에 대한 제어의 필요성은 보다 커졌다. 진공 chamber 발생하는 미세 particle의 주요 원인으로는 공정 중 발생한 polymer, chamber 내 부품의 식각 및 스퍼터링에 의한 부산물 등이 있다. Plasma 공정 도중 발생한 particle은 plasma 내 전자에 의해 대전되어 음의 전하량을 가지게 된다. 음의 전하량을 가진 particle은 plasma와 wafer의 경계면에서 형성되는 sheath 때문에 wafer에 도달하지 못하고 plasma 내에 부유하게 된다. 이러한 particle은 plasma가 꺼지게 되면 sheath가 사라지면서 wafer에 도달하게 되고 wafer의 오염을 유발하게 되고 생산 수율을 저하시키는 요인이 된다. 이러한 이유로 최근 plasma 공정에서는 공정 중 발생하는 부유성 particle에 대한 관리가 중요해졌다. 이를 관리하기 위해 plasma를 끄기 전 부유성 particle을 제거하는 방안을 고안하고 평가를 진행하였다. 공정이 끝나고 plasma가 꺼지기 전 plasma를 유지하여 부유성 particle이 wafer에 도달하지 못하는 상태에서 gas purge를 실시한다. 이러한 과정 후 plasma를 끄게 되면 부유성 particle이 wafer에 도달하는 것을 감소시키게 된다. 이번 평가를 통해 부유성 particle에 대해서 대략 20%의 감소 효과를 볼 수 있었다. 이를 토대로 향후 조건 최적화 후 적용 시 particle 감소뿐 만 아니라 수율 향상에도 기여할 수 있을 것이라 기대된다.

  • PDF

Web-based Distributed Lean Construction Information System;Development of System Prototype (웹 기반 분산형 린건설 정보시스템 개발;시스템 프로토타입 개발)

  • Park, Moon-Seo;Yoon, You-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.182-189
    • /
    • 2007
  • To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve design/material supply/schedule management, functioning to efficiently manage the information created at construction production processes and developing a web based construction information system that provides result management/decision making support/knowledge based information services.

  • PDF