Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information  

Yun, Seok-Heon (경상대학교 공학연구원)
Kim, Seong-Sig (한국건설기술연구원)
Publication Information
Korean Journal of Construction Engineering and Management / v.6, no.6, 2005 , pp. 107-114 More about this Journal
Abstract
The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.
Keywords
Integrated Construction Information Classification; cost-schedule data; WBS;
Citations & Related Records
연도 인용수 순위
  • Reference
1 최윤기, 일정과 비용을 통합한 건설공사진도율 산정시스템, 건설기술연구보고, 12권, 서울대학교, 1998
2 김영재 외, 총액개약 건설공사의 EVM운영모델, 대한건축학회 논문집, 2002. 6
3 건설교통부 '공공공사 효율화 정책자료집', 1999
4 김우영 외, 공통자(Common Denominator)와 공통분류 (Common Category)에 의한 비용/일정 통합모델 개발, 2002. 8, 대한건축학회 논문집, 대한건축학회, 18권 8호
5 김양택, 현창택, Work Packaging Model의 개선을 통한 공정-공사비 통합모델 구축, 한국건설관리학회논문집, 한국건설관리학회, 제1권 제4호, 2000. 12
6 한국건설기술연구원, 건설정보분류체계 표준화 연구, 건설교통부, 1996. 12
7 한국건설기술연구원, 건설정보분류체계 발전방향 수립, 건설교통부, 1999.10
8 한국건설기술연구원, 건설정보분류체계 구축을 위한 연구 (II), 건설교통부, 2002. 12
9 한국건설기술연구원, 건설사업관리 발주체계 및 조달시스템 개발 연구, 건설교통부, 2001.09