Hot Cell Facility for Demonstration of Advanced Spent Fuel Conditioning Process

사용후핵연료 차세대관리 종합공정 실증시설

  • Published : 2003.11.01

Abstract

The advanced spent fuel conditioning process(ACP) was proposed to reduce considerably the overall volume and radioactivity for effective management of the PWR spent fuel in respects on safety and economy. The ACP is under research and development, and have scheduled to perform hot test for demonstration of the ACP after several years. For hot test, hot cell facility of ${\alpha}{\gamma}$ type possess conservative safety is required essentially. A existing hot cell of ${\beta}{\gamma}$ type will be refurbished to minimize construction expenditures of hot cell facility. In this study, the design requirements are established, and the process detail work flow was analysed for the optimum arrangement to ensure effective process operation in hot cell. And also, the basic and detail design of hot cell facility and process and safety analysis was peformed to secure conservative safety of hot cell facility and process.

국내 경수로형 사용후핵연료의 효율적인 관리를 위하여 현재 건식처리공정으로 개발 중에 있는 차세대관리 종합공정의 실증시험이 계획되어 있다. 실증시험의 수행을 위해서는 기밀성이 유지되는 ${\alpha}{\gamma}$ type 핫셀시설과 시설의 안전성 확보가 필수적이다. 핫셀시설 확보에 필요한 재원을 최소화하기 위하여 기존 ${\beta}{\gamma}$ type 핫셀을 개조하여 활용하기로 하였으며, 차세대관리 종합공정의 특성을 고려하여 실증시설의 보수적 안전성 확보와 핫셀 내 효율적인 공정운전을 위한 분야별 설계요건을 확립하였다. 또한 이를 기준으로 실증공정의 공정조건과 상세한 작업흐름을 분석하여 핫셀 및 부대설비와 공정기기들의 구성과 배치론 최적화하였으며, 실증공정 및 핫셀 개조를 위한 기본 설계와 상세설계, 안전성분석과 환경영향평가를 완료하였다.

Keywords