• Title/Summary/Keyword: 공정리스크

Search Result 80, Processing Time 0.02 seconds

The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall (커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안)

  • Jung Tae-Sik;Kim chang-duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.71-79
    • /
    • 2005
  • As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

Analysis of the Schedule Risk using PROMETHEE in Building Construction Management (건설관리에서의 PROMETHEE기반 공정 리스크 분석)

  • Lee, Jang-Young;Yoon, You-Sang;Jang, Myung-Houn;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.25-34
    • /
    • 2010
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopts the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to provide process of risk analysis to use the PROMETHEE.

Introduction of the M(i,j,k)BCP and Risk Assessment of Underground Limestone Mine (재난관리체계(M(i,j,k)BCP) 제안과 석회석광산의 리스크 평가)

  • Lee, Seong Min;Kim, Sun-Myung;Lee, Yeon Hee
    • Tunnel and Underground Space
    • /
    • v.22 no.6
    • /
    • pp.383-392
    • /
    • 2012
  • This study introduces $M_{(i,j,k)}BCP$ (Mining Business Continuity Planning) which is the smart management system of mine disasters to achieve the safe and eco-friendly mining. Where, 'i' is mine kinds, 'j' is mining processes, and 'k' is risks at process respectively. By specifically setting 'i=1=limestone mine', this study also suggests that $M_{(i,j,k)}BCP$ is the smart management system of limestone mine. Mining risks used in this study were obtained from professional survey and literature review. This study classified these risks by five different mining processes and reduced risk numbers approximately 60 to 26. And they were all allocated into $M_{(i,j,k)}BCP$ and assessed. To do assess risks, this study used four risk indexes which are probability, casualty, facility loss, and discontinuity respectively. By the results of the assessment of risks, results could be four specific groups based on their causes and impacts. In addition, one of the results showed that the most possible risks at limestone mine was the roof-fall and rock-fall in digging process. This result means that $M_{(1,2,1)}BCP$ should be established as a first priority at limestone mine.

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

A Study on the Risk Evaluation of Construction Management Based on Risk Identification (위험도 기반 건설경영 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Lee, Gun;Yeo, Sang-Ku;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.83-91
    • /
    • 2009
  • Construction industry is a complex industry which should be invested with plenty capital, manpower and resources. Investment factors and inner and outer environmental factors should be managed systemically in terms with risk factors possible to occur. It maximizes the profit to establish construction management by managing risk systemically. While previous studies were executed with risk related to some special progress lively, studies about risk in managing construction company leave much to be desired. Therefore, this study examined risk in the whole construction management, showed the checklist and deduced the quantitative factors through questionnaire analysis from specialists. Also, priority and grade of construction management factors were evaluated by analyzing weight of construction risk factors.

Analysis of Effect of Risk Factors on the Success of Risk Management (리스크요소가 리스크관리 성공에 미치는 영향 분석 연구)

  • Chung, Yeon-Kyo;Chung, Byeong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.443-449
    • /
    • 2014
  • Although risk reduction of construction projects have been continued, the risk of fatal accident has been increased. The purpose of this paper is to reduce the cause of the essential risk factors. Questionnaire survey of construction companies in domestic was conducted and the Multiple Regression Analysis of statistics program was used to grasp effective factors among the risk factors of construction companies in domestic. Development of the essential risk factors and its application to projects could lead to improvements such as compression of network, reduction of cost, improvement of quality and reduction of safety accident.

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms (국내 CM기업의 리스크 인자별 관리 업무 프로세스 분석을 통한 표준업무체계 개발)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.73-83
    • /
    • 2015
  • Construction management firms in Korea have mainly focused on the key management areas of time, cost, quality and safety management in line with a rapid change of construction industry recently. However, a risk management is considered comparatively less important found from our research on an investment by the firms for training, system establishment. This has been identified that the construction management firms have taken an approach of dealing with risks with their experience, insight rather than managing risks with a systemized principles or proper tools. Therefore, the current system for risk management was identified by analyzing risk factors and work process in this research and systemized process for risk management of the identified risk factors was suggested. This research is expected to be a basis on establishing standard gudiance for risk management and risk management tools.