Browse > Article
http://dx.doi.org/10.6106/KJCEM.2015.16.6.073

Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms  

Park, Kyungmo (ERICA Industry-University Cooperation Foundation, Hanyang University)
Kim, Changduk (Department of Architectural Engineering, Kwangwoon University)
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.6, 2015 , pp. 73-83 More about this Journal
Abstract
Construction management firms in Korea have mainly focused on the key management areas of time, cost, quality and safety management in line with a rapid change of construction industry recently. However, a risk management is considered comparatively less important found from our research on an investment by the firms for training, system establishment. This has been identified that the construction management firms have taken an approach of dealing with risks with their experience, insight rather than managing risks with a systemized principles or proper tools. Therefore, the current system for risk management was identified by analyzing risk factors and work process in this research and systemized process for risk management of the identified risk factors was suggested. This research is expected to be a basis on establishing standard gudiance for risk management and risk management tools.
Keywords
Risk; Risk Factors; AHP; Business Process; BPMN;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Choudhry, R. and Iqbal, K. (2013). "Identification of risk management system in construction industry in Pakistan." J. Manage. Eng., 29(1), pp. 42-49.   DOI
2 Han, J. W. (2001). "A Study on modeling methods for standardization of business process." MS thesis, Yonsei Univ., Seoul, Korea.
3 Kang, H. W., Kim, M. S., Kim, S. H., and Kim, Y. S. (2012). "A Study on the Analysis of Risk Factors in Engineering Procurement and Construction Phase for Overseas Plant Project." Korean Journal of Architectural Institute of Korea, 28(5), pp. 111-119.
4 Kim, B. Y. (2011). "The Analysis of the Major Costincreasing Risk Factors from the Perspective of Construction Management." MS thesis, Sungkyunkwan Univ., Gyeonggi-do, Korea.
5 Lee, D. Y. (2010). "A Study on Developing Risk Analysis and Management Model During Entire Construction Phase." MS thesis, Chungnam National Univ., Daejeon Metropolitan City, Korea.
6 Lee, J. S., and Kim, J. J. (2011). "Evaluating and Analyzing Risk Factors Generated During the Whole Project Phases by Considering the Characteristics of Urban Regeneration in the Residential Environment Improvement Projects." Korean Journal of Architectural Institute of Korea, 27(11), pp. 211-219.
7 Park, H. S., and Kim, S. K., (2011). "Risk Analysis and Classification of Public-Private Partnership in Project Financing Process." Korean Journal of Construction Engineering and Management, 12(5), pp. 117-127.   DOI
8 Park, K. (2013). "Development of standard operating systems for risk reduction of cm company site operations." Ph.D thesis, Kwangwoon Univ., Seoul, Korea.
9 Park, K., Lee, H.W., and Kim, C. (2014). "Assessment of risk management practices of CM enterprises: The need for an enterprise-level risk management framework." Korean Journal of Construction Engineering and Management, KICEM, 15(3), pp. 66-73.   DOI
10 Seo, S. W. (2002). "Decision Making Model for Construction Risk Using Optimiazed Response Method." MS thesis, Hanyang Univ., Seoul, Korea.