Quantitively deducing basic method of construction schedule risk

공정리스크의 정량적 도출을 위한 기초적 방법

  • 류한국 (국립창원대학교 건축공학과)
  • Published : 2014.11.14

Abstract

Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.