The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.

The Survey of Time Management Status in the Domestic Construction Site (국내 건설현장의 공정관리 현황 실태 조사)

  • Yoon, Byung-Sik;Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.578-582
    • /
    • 2008
  • The domestic construction companies have implemented a various of management methodology and tools for time management. However, the work completion rate versus work plan have a big difference with the planned work completion rate previously despite of implementing the time management methodology and tools. The research searches the problems that the previous time management process and tools focusing on the management factors that can be controlled. Also, It suggest the improvement direction for these limits.

  • PDF

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

A Study Short Run Production Cusum Individual X Chart & Moving Range Chart (단납기 생산체계의 누계치 관리도와 유동성 관리도에 관한 연구)

  • Kim Je-Hong
    • Journal of the Korea Society of Computer and Information
    • /
    • v.9 no.4 s.32
    • /
    • pp.215-220
    • /
    • 2004
  • Production management confronted the environment of infinite competition should be prepared to abrupt variations of management environment and have the ability to be changed in short term. It has to be studied, the control method of products that correspond to multi-functionalization and reduced product life which is caused by high-quality and varied customers demands. As a process control method, we most be able not only to control varies characteristic in a control at once but also to detected special values quickly for high-quality. In this paper a control method referred above is presented.

  • PDF

Design of Zp-s Control Chart for Monitoring Small Shift of Process Variance (미세 공정산포 관리를 위한 Zp-s관리도 설계)

  • Kim, Jong-Geol;Kim, Chang-Su;Eom, Sang-Jun;Yun, Hye-Seon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.199-207
    • /
    • 2013
  • 산업의 빠른 발전 속도에 따라 연구 개발도 함께 발전해야 한다. 따라서 현재 제조공정에 대한 품질 특성치의 분석방법으로 공정 모수의 작은 변화도 쉽게 탐지를 할 수 있는 EWMA 관리도와 Shewhart 관리도보다 공정 변화에 민감하게 탐지 가능한 CUSUM 관리도에 관한 연구가 많이 이루어지고 있다. 하지만 식스시그마 공정관리에 맞춘 평균, 불량률, 미세 분산을 동시에 감지할 수 있는 동시 관리 체계 연구는 많이 미흡하다. 본 연구에서는 기존의 CUSUM, EWMA 관리도 기법보다 빠른 이상 감지를 위해서 평균, 불량률, 분산 3가지가 동시에 관리되어질 수 있도록 Zp-s 관리도를 소개한다. Zp-s 관리도는 ARL을 통해 기존 관리도보다 민감함을 확인할 수 있다.

  • PDF

An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF

Development of Supporting tool for WBS-based cost (작업분류체계 기반 공사비 작성을 위한 지원도구 개발)

  • Yoon, Hoi-Su;Moon, Jin-Suk;Kim, Seong-Jin;Han, Chung-Han
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1430-1432
    • /
    • 2011
  • 공사비정보와 일정정보는 사업을 관리하는데 있어 매우 중요한 정보로 이들이 연계활용되어야 공정공사비 관리를 원활하게 진행할 수 있다. 그러나 국내의 실정은 공사비가 내역체계 기반으로 관리됨에 따라 설계사에서 작성되어 시설, 부위, 공간 등의 정보를 갖고 있던 수량정보가 내역체계 기반으로 전환되면서 정보들을 상실하고 시공사에서는 다시 물량분개라는 작업을 통해 다시 시설, 부위, 공간 등의 정보를 부여하는 작업이 발생하고 있다. 이에 도로분야 사업을 대상으로 작업분류체계(WBS)를 그 연계방안으로 제시하고 작업분류체계 기반 공사비 작성을 통해 설계사에서 작성된 정보를 시공사에서까지 활용할 수 있도록 하고자 한다. 본 사업에서는 이러한 작업분류체계 공사비 작성을 위한 지원도구 개발을 위해 업무 프로세스 검토, 지원도구 활용 공사비 작성, 시험적용을 통한 지원도구 검증을 수행할 계획이다. 이를 통해 내역정보와 공정정보의 연계가 실현되고, 효율적인 공사비 관리의 기반을 제공할 수 있다.

A Research on the Process Analysis Technique under Non-Normal Distribution (비정규분포하에서의 공정분석기술에 관한 조사연구)

  • Kim, Jong-Gurl;Um, Sang-Joon;Kim, Young-Sub
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.04a
    • /
    • pp.393-400
    • /
    • 2009
  • 품질향상을 위한 효과적인 공정관리체계는 기업의 생존에 있어서 매우 중요하다. 최근에는 제품의 수명과 관련된 신뢰성이 강조되면서, 신뢰성분포로 불리는 비정규분포하에서의 공정관리가 핵심과제로 여겨지고 있다. 특히 품질특성치가 비정규분포를 따를때, 정규가설에 기초한 공정관리기술을 사용한다면 심각한 오류가 초래될 수 있기 때문에, 비정규분포에서의 관리도와 신뢰성샘플링계획에 대한 중요성이 강조되고 있다. 본 연구의 목적은 비정규분포에서의 관리도와 신뢰성샘플링계획에 대한 최근연구를 조사하고, 보다 합리적이고 신뢰도 높은 공정분석에 대한 연구동향을 소개함으로써, 비정규분포하에서의 공정관리에 대한 발전적인 연구방향을 제시하는 것이다.

  • PDF

SaaS-based construction process transfer and Safety Management System (SaaS기반의 건설공정전송 및 안전관리 시스템)

  • Kim, Eui-ryong;Jung, Soo-Sung;Kim, Young-Gon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.735-737
    • /
    • 2015
  • In this paper, SaaS (Software as a Service) based transport and construction process safety management systems by utilizing the construction work process management and safety management and schedule, and results for various types of construction process, achieved through high-speed wireless Internet access by applying to ensure a systematic means for safety and can quickly and accurately manage all made within the process control system. The operator should be indicated by using a smart phone to work as a supervisor report the current status and results of the operation. Also be reported to the supervisor immediately in an emergency situation and there is no vibration occurs over a period of time the smartphone is to check the danger to the operator. If the commissioner is directed to specific business processes that establish and verify the results obtained and the result is satisfied by presenting the part down the measures insufficient command of the field workers risk situations. In the case of software (server) to store all the data relating to the operation member in charge of management and security.

  • PDF