• Title/Summary/Keyword: 공사수행방안

Search Result 508, Processing Time 0.023 seconds

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

청계천 유역 지하수 모니터링을 위한 자료 구축 및 관리 방안

  • Park Jong-Cheol;Jang Se-Jeong;Kim Yun-Yeong;Hyeon Yun-Jeong;Lee Gang-Geun;Kim Hyeon-Jun
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2005.04a
    • /
    • pp.437-440
    • /
    • 2005
  • 서울시는 복개천이었던 청계천을 복원하여 도심지를 통과하는 하천을 만들기 위해 청계천 복원 공사를 수행하고 있다. 청계천 복원 공사 구간을 포함하는 유역에는 서울시 지하철 1, 2, 4, 5, 6호선 등이 통과하고 있으며, 도시 내 비수시설, 하수관거시설 등 자연적인 수문현상에 영향을 주는 인위적인 요소들이 복합적으로 존재하고 있다. 때문에 청계천 복원 공사 후 유역내의 여러 요인들과 공사의 정도에 따라 누수가 발생할 것으로 예상된다. 공사 후 청계천에서의 누수율에 대한 측정은 공사의 성공여부를 결정하고, 향후 지속적인 누수가 예상되는 청계천의 유지 보수에 있어서 매우 중요하다. 특히 청계천의 손실량의 대부분을 차지할 지하로의 누수에 대한 측정은 매우 중요하다. 따라서 누수율을 측정하고, 누수율과 주변 요인들과의 관계를 추정할 수 있는 수문모델링을 수행할 필요성이 있다. 수문모델링은 일회성으로 끝나는 것이 아니라 지속적으로 수행될 필요가 있는데, 그러기 위해서는 청계천 유역에서의 지속적인 수문관련 인문 자연자료를 획득하여 정리할 필요성이 있다. 본 연구에서는 청계천 복원 공사 구간의 유역에 대한 인문 자연자료를 GIS(지리정보시스템)을 이용하여 수치도면과 속성테이블 형태로 데이터베이스화한다. 그럼으로써 청계천 주변 유역에 대한 도시형 수문 모델링 연구에 활용하고, 아울러 공사 후 지속적으로 누수율을 측정하는데 자료를 원활히 제공하여 청계천의 유지 보수에 도움을 줄 수 있는 체계를 마련하였다.

  • PDF

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

A Study on the Improvement of Specification in connection with Construction Lessons Learned Database (건설공사 지식데이터베이스 연계를 통한 시방서 개선방안)

  • Song Jae-Young;Lee Tai-Sik;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.511-514
    • /
    • 2002
  • Nowadays, domestic construction companies make an effort to share knowledge and experience accumulated while conducting a project. One way of improving knowledge sharing is to develop specifications which are linked to the expert's knowledge and experience based on the specification classification. Therefore, the purpose of this paper is to review the current domestic specification system and develop the specification linked to the construction lessons learned database. It is expected that the proposed specification system will support the decision making process by effectively providing the knowledge and solution.

  • PDF

Working Design Management of the Design Build Projects Using CBR (CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안)

  • Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.432-437
    • /
    • 2002
  • As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.

  • PDF

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

A Study on Priority Selection Process for Utilizing Urban Decline and the Potential (도시쇠퇴 및 잠재력을 활용한 도시재생 우선순위 선정방안 연구)

  • Yang, Dong-Suk;Lee, Sam-su;Lee, Dong-Geon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2013.11a
    • /
    • pp.1588-1591
    • /
    • 2013
  • 도시재생종합정보시스템은 도시의 쇠퇴정도를 파악하고 그에 따른 도시재생 관련 정책수립 및 사업의 수행에 있어 의사결정 지원과 관련정보 등을 제공함을 목적으로 하고 있다. 본 연구에서는 도시재생 사업이나 정책을 진행시키고자 했을 때, 기 개발되어진 쇠퇴와 잠재력진단 시스템의 연계 및 활용을 통해 효율적인 도시재생 사업의 의사결정을 지원해줄 수 있는 우선순위 선정프로세스를 연구하였다. 또한, 시스템간의 연계를 위한 정보 프로세스 및 구현방안을 제시하였다. 제시된 우선순위 선정방안으로 보다 객관적, 직관적인 도시의 현황 및 DB 제공할 수 있으며 이를 통해 도시재생 사업 및 정책의 의사결정을 위한 근거자료로 활용 할 수 있다.