Improvement of Construction Process Control to Reduce Construction Risk

건설공사 공정관리이행의 리스크 감소를 위한 개선방안

  • 박홍태 (천안공업대학 토목과) ;
  • 손창백 (세명대학교 건축과) ;
  • 강인석 (경상대학교 건설공학부 토목공학과, 생산기술연구소)
  • Published : 2000.03.01

Abstract

The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

효율적인 공정이행관리는 공사관리자에게 공기단축과 공사비절감을 위한 유용한 정보제공이 가능하도록 해야 한다. 그러나 국내의 공정이행관리는 공정관리 전산체계 적용상의 어려움과 내역ㆍ공정 연계가 가능한 공사정보분류체계 및 전산체계 부재 등의 요인들이 복합적으로 어울려져, 공사과정에서 발생되는 정보의 효율적인 관리가 어려운 점이 있다. 본 연구에서는 현재의 공정관리 운영실태와 공정관리 수행을 저해하는 전반적인 문제점을 기술적 측면과 운영상 측면의 항목별로 분석한 후, 문제점으로 인해 발생가능한 리스크를 감소시킬 수 있는 개선방안을 제시하였다. 개선방안은 내역과 공정이 연계될 수 있는 공사정보분류체계 및 전산체계의 구성과 관련된 긍정관리 기술적 방안을 위주로 하였으며, 기타 운영상 측면의 방안으로 구성되어 있다.

Keywords