The Study of Quality Control in Engineering on the Turnkey Project(Focus on Change Orders at the Construction Phase) (턴키공사 설계품질관리에 관한 연구(시공단계의 설계변경을 중심으로))

  • Lee Yong-Jin;Lee Teck-Wn;Kim Jin-Young;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.58-66
    • /
    • 2001
  • Turnkey project, also called Design-Build project, has been expanding and diversifying its business into the Korean market. However, it has been experiencing numerous difficulties due to a large number of change orders on the public turnkey project. Change order during the construction phase impact on time deliveries, budget and quality on a turnkey project. In preparation for this, the government has to improve the awarding procedure and general conditions for turnkey projects. Contractors should also cooperate with their co-working partners and establish a standardized procedure, which provides change order control for efficient implementation on the construction site.

  • PDF

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

법령과 고시 - 표준하도급계약서 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.233
    • /
    • pp.47-54
    • /
    • 2009
  • 공정거래위원회(위원장 정호열)는 지난 11월 6일 표준하도급계약서를 개정하고 이날부터 시행에 들어갔다. 개정된 표준하도급계약서는 발주자의 요청에 따라 설계변경이 이루어진 경우 증가된 물량 또는 신규비목의 단가는 설계변경 당시를 기준으로 산정한 단가와 이 단가에 낙찰률을 곱한 금액을 합한 금액의 100분의 50 이내에서 당사자간 협의해 정하도록 했다. 다만, 발주자의 요청 이외의 사유로 설계변경이 이뤄진 경우에는 종전과 같이 $\Delta$증감된 공사의 단가는 수급사업자가 작성한 산출내역서 상 단가를 적용하고 $\Delta$신규비목의 단가는 설계변경 당시 기준으로 작성한 단가에 낙찰률을 곱한 금액을 적용토록 했다.

  • PDF

A Study On Reduce Scheme Of Design Error In Turn-Key Projects (턴키공사 설계오류 저감방안에 관한 연구)

  • Kim Byeong-Soo;Kim Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.286-289
    • /
    • 2003
  • In turn-key projects, escalation of cost by design errors is not allowed because a contractor prepares the design. Therefore, cost escalation by design errors results in increasing the cost of the prime contractor. The rate of profit decreases finally. In addition, design errors bring not only schedule delay but also serious quality problem by unknown errors. This study tries to dissolve problems, that of cost increase. process delay and a falling-off in quality by investigating cause of design errors and presenting a scheme for reducing design errors.

  • PDF

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

Evaluation of Freeway Mobile Work Zone Safety using Driving Simulations (주행 시뮬레이션을 활용한 고속도로 이동공사 안전성평가)

  • Park, Hyunjin;Oh, Cheol;Moon, Jaepil
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.6
    • /
    • pp.124-140
    • /
    • 2017
  • There exists a limitation to provide proper advance information for safe maneuvering through guidance and caution signs in freeway mobile work zones, unlike fixed work zones. Although a work-protection vehicle is currently deployed at the rear of the work vehicle, more active countermeasures to prevent crashes are required. The purpose of this study was to propose a method to evaluate the safety in mobile work zones and to present effective countermeasures. Driving simulation experiments were conducted to analyze characteristics of driver's behavior in mobile and fixed work zones. Safety distance index (SDI) based on the comparison of stopping distances of a work-protection vehicle and a following subject vehicle was used to evaluate traffic safety. More dangerous driving behavior was observed in the mobile work zone. Especially, it was identified that the lane-change of vehicles following the work- protection vehicle was late. Therefore, it is necessary to actively introduce methods to provide warning information so that the driver can recognize the work-protection vehicle in advance and carry out appropriate evasive maneuvers.

법령과고시 2 - 건설산업기본법 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.278
    • /
    • pp.44-49
    • /
    • 2013
  • 민간건설공사 대금 지급보증제 도입과 불공정 특약 규정 무효 등을 주요 내용으로 하는 개정된 건설산업기본법이 지난 8월 6일 개정되어 내년 2월 7일부터 시행된다. 개정된 법률에서 계약금액 및 기간 변경 불인정, 계약체결 전 예측이 어렵거나 구체적으로 정하지 않는 내용의 책임 전가 등 건설공사 도급계약 내용 중 계약당사자 간 현저하게 불공정하고 불평등한 특약은 효력을 잃는다. 또한 민간건설공사에서 수급인은 계약이행보증에 대응하여 발주자에게 공사대금지급보증 또는 담보제공 요구를 할 수 있게 되며, 계약당사자가 대등한 입장에서 공정하게 계약을 체결하도록 표준계약서 사용이 권장된다.

  • PDF

Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects (공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.12-20
    • /
    • 2021
  • In order to secure construction quality and safety and prevent cost disputes, the importance of calculating 'the appropriate construction period' has recently emerged. It is necessary to analyze a considerable amount of historical data to establish the standard for calculating the construction period. However, many experts are raising questions about the use of past data due to changes in the construction business environment, such as shortening working hours, reinforcing quality regulations, and changing climate conditions. In addition, the possibility of errors increases when calculating a uniform construction period using historical statistics because the work order and productivity are very diverse according to construction conditions. Therefore, through this study, a new solution to change from the method of analyzing past data to the method of reviewing current production data through an active 'transformation of thoughts' was proposed through this study. In other words, the process of reviewing and calculating 'the appropriate construction period' was institutionalized by introducing 'process management experts' and 'construction experts by type of construction' in the design stage.

Estimation of Contingency for Highway Construction Project Using Regression Analysis (회귀분석을 이용한 고속도로 건설공사 예비비의 산정)

  • Yoon, Yoo Jung;Woo, Sungkwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.617-626
    • /
    • 2006
  • The purpose of contingency estimate is to manage the increase in construction cost and the extension of the term of works due to the inevitable occurrence of uncertain situations. The aim of contingency strategies have two intentions. One thing, can be called a passive strategy, gets ready for construction cost increase due to uncertainty factors, the other thing, can be called a active strategy, gets rid of the obstruction factors of work prior to construction performance. Therefore, from the view point of medium and long term, there is necessary to accumulate data in conjunction with design modification cases and carefully analyze uncertainty factors from construction types and characters. Therefore, this thesis will analyze design modification case at a special work such as highway and select factors that affect construction cost and present contingency estimate process using regression analysis.

Case Study of Explosive Demolition of Concrete Well Structure (광진교의 우물통 기초 발파철거 사례분석)

  • 두준기
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.19-30
    • /
    • 2001
  • 본 논문에서는 수상구간의 우물통 기초 철거공법을 약액(팽탕성 과괴제) 주임공법에서 발파공법으로 변경하여 공사기간을 단축시키면서도 주변의 보안물건에 대한 공해를 발생시키지 않고 안전하게 공사하여 원가를 절감한 사례를 중심으로 발파공법을 고찰하였다.

  • PDF