Development of the Space Cost Breakdown Structure(CBS) for Multi-Family Housing Projects (공공아파트 건설공사의 공간별 공사비분류체계 개발)

  • Hyun, Chang-Taek;Koo, Kyo-Jin;Yeon, Hee-Jung;Moon, Hyun-Seok;Cho, Kyu-Man;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.178-187
    • /
    • 2007
  • As the government has enforced recently the policies on the distribution of the housing, the construction cost of multi-family housing projects has increasingly become very sensitive and political issue. However, it is difficult to predict the construction cost in planning and design phase of the project because the Bill of Quantity of the multi-family housing projects was composed of breakdown structure based on each work package. To predict the construction cost in planning and design phase for multi-family housing projects in more effective and reasonable way, this study developed the cost breakdown structure based on spaces using Delphi method. The Cost Breakdown Structure (CBS) based on spaces for multi-family housing projects basically consists of three parts: (i) Building part; (ii) Non-building part; and (iii) Additional part. The characteristics of spaces in multi-family housing projects are fully taken into consideration. Then these three parts were subdivided into work packages in terms of work tasks. Additionally, the usefulness and effectiveness of Space CBS in this paper were validated by analyzing the BOQs of several collected sample projects and matching with Space CBS afterwards.

Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

A Study on the Estimation of Elemental Costs for an Apartment Building (공동주택에 대한 부위별 공사비 산정에 관한 연구 - 사례 H사의 실행단가를 중심으로 한 연구 -)

  • Kang, Hyun-Wook;Yoo, Jong-Hwan;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.173-181
    • /
    • 2007
  • The purpose of this study is to estimate elemental costs of an apartment building. The adapted research method includes a case study from $^{\circ}{\AE}H^{\circ}{\phi}$ construction company. The results of this study are as follows: 1) An elemental cost format of an apartment building is proposed, 2) An elemental cost table based on a case study of $^{\circ}{\AE}H^{\circ}{\phi}$ construction company is suggested.

인천국제공항철도 건설사업관리 수행체계

  • Yoon Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.13-18
    • /
    • 2003
  • 국내 건설프로젝트의 대부분은 설계, 시공, 운영이 별도의 체계로 운영이 되이온 경향이 많은 바, 이를 개선하기 위해선, 기획단계에서 운영단계에 이르는 건설생애주기 단계별로 수행업무절차를 체계적으로 정립하여야 한다. 본 고에서는 이를 위하여 인천국제공항철도사업을 모델로 바람직한 대형공사에서의 사업관리 수행체계에 대하여 알아보았다.

  • PDF

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction (건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.133-139
    • /
    • 2004
  • The purpose of this study is to present an improved lift-up &procurement work flow for effective resource utilization in building construction. The current lift-up &procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up &procurement work flow. The main contents of the study are as follows; 1) Problems of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning was investigated. The study recommends continuous improvement of lift-up &procurement work flow and efficient management of information in building construction as a future research.