A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project  

Yun, Seok-Heon (국립경상대학교 공학연구원, 건축학부)
Kim, Seong-Sig (한국건설기술연구원)
Publication Information
Korean Journal of Construction Engineering and Management / v.8, no.4, 2007 , pp. 119-127 More about this Journal
Abstract
Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.
Keywords
Schedule-Cost Integration; QDB;
Citations & Related Records
연도 인용수 순위
  • Reference
1 건설교통부(2005), 국도건설공사 설계실무요령
2 김우영, 김옥규, 최윤기, 이현수(2002), 공통자와 공통분류에 의한 비용/일정 통합모델 개발, 대한건축학회 논문집, 제18권 8호, 대한건축학회
3 백승호, 김경래, 이유섭, 이용규(2000), EVMS를 활용한 공 정-공사비 통합관리 프로세스 모델, 건설관리, 제1권 2호, 한 국건설관리학회
4 윤석헌, 김성식(2005), 공정-내역정보 연계를 위한 통합건설 정보분류체계기반의 공통WBS 활용방안, 건설관리, 제6권 6 호, 한국건설관리학회
5 김양택, 현창택(2000), Work Packaging Model의 개선을 통 한 공정-공사비 통합모델 구축, 건설관리, 1권 4호, 한국건설 관리학회
6 한국건설기술연구원(2006), 2005건설CALS표준개발 보고서