• Title/Summary/Keyword: 공공프로젝트

Search Result 319, Processing Time 0.027 seconds

A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

Development of intranet-based Program Management Information System of multi-complex project with application of BIM (BIM을 활용한 다중복합 프로젝트의 인트라넷 기반 통합사업관리체계 구축 방안)

  • Song, Il-Bab;Hur, Young-Ran;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 2012
  • Public construction projects need complex and multi-functional management skill, since the most of public construction projects are comprised of multi-project and mega-projects. In order to effectively manage construction projects, PMIS is widely used. However the majority of the current PMIS have been developed as a single project-oriented business management system. Thus compatibility problems are encountered during the process of integrating the entire systems to manage the multi-complex projects. In addition, the form of orders applying BIM are increased recently, but the research and development of BIM based PMIS are still lacking. In this study, therefore, the functions of PMIS main objectives based on the analysis of PMIS As-Is and To-Be of PMIS, the dual management system utilizing Internet and Intranet will be proposed to integrate the individual PMIS with Integrated Program Management System. Rather than combining commercial BIM tool and PMIS directly, which is the common method of failure, the sequential process model to adopt BIM based PMIS is also explained. Step-by-step development method of BIM based PMIS is suggested to prepare for the activation of BIM technology in the nearest future.

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

An Exploratory Study on S/W Project Quality and Organizational Performance by Process Maturity Certification (프로세스 성숙도 인증 여부에 따른 프로젝트 품질 성과 및 조직 성과 차이에 관한 탐색적 연구 : CMM 인증 및 비인증 조직을 중심으로)

  • Moon, Song-Chul;Kim, Hyun-Soo
    • The KIPS Transactions:PartD
    • /
    • v.11D no.2
    • /
    • pp.387-396
    • /
    • 2004
  • Qualify of software development project is very important in complex and large domestic software market. Software development companies are eager to Bet some quality certification such as CMM certification. However, reliability and effectiveness of CMM certification tomes into question. This study explores the relationships between software project Quality (and some organizational performance) and organization's CMM certification. The result shows no strong relationships between project quality and CMM certification. This may imply that an incremental improvement of project process plays a more important role than certification process itself.

Development of the Space Cost Breakdown Structure(CBS) for Multi-Family Housing Projects (공공아파트 건설공사의 공간별 공사비분류체계 개발)

  • Hyun, Chang-Taek;Koo, Kyo-Jin;Yeon, Hee-Jung;Moon, Hyun-Seok;Cho, Kyu-Man;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.178-187
    • /
    • 2007
  • As the government has enforced recently the policies on the distribution of the housing, the construction cost of multi-family housing projects has increasingly become very sensitive and political issue. However, it is difficult to predict the construction cost in planning and design phase of the project because the Bill of Quantity of the multi-family housing projects was composed of breakdown structure based on each work package. To predict the construction cost in planning and design phase for multi-family housing projects in more effective and reasonable way, this study developed the cost breakdown structure based on spaces using Delphi method. The Cost Breakdown Structure (CBS) based on spaces for multi-family housing projects basically consists of three parts: (i) Building part; (ii) Non-building part; and (iii) Additional part. The characteristics of spaces in multi-family housing projects are fully taken into consideration. Then these three parts were subdivided into work packages in terms of work tasks. Additionally, the usefulness and effectiveness of Space CBS in this paper were validated by analyzing the BOQs of several collected sample projects and matching with Space CBS afterwards.

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

Research for improving quality of SI(System integration) development project (시스템 통합(SI) 구축 사업 품질 향상을 위한 연구)

  • Kim, Seok-Kwan;Ryu, Gab-Sang
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.3
    • /
    • pp.215-220
    • /
    • 2018
  • This paper limited the participation of large corporations in the mass information market by revising the Software Industry Promotion Act in order to increase business opportunity, equality of opportunity, and capacity building for small and medium sized IT companies. However, it is a fact that the medium and small SW companies have insufficient business capacity and expose various problems such as quality degradation of public information business, inadequate risk management, and deterioration of schedule management. In order to solve this problem, this paper derived the factors of quality deterioration in the system integration project and proposed to carry out the project by using some activities of VISUALIZATION, rigorous test management and Agile Methodology as a solution. Applying these measures to healthcare IT projects developed by midsize / small-sized IT companies has improved communications, improved quantitative progress management and improved project visibility. In addition, it contributed to minimizing defect resolution time, improving the requirement coverage ratio, and shortening unnecessary meeting time.

A Study on the Change Management During the Introduction of Information System: A Case of Supreme Court of Korea (정보시스템 도입에 따른 변화관리 사례 연구: 대법원 변화관리 프로젝트를 중심으로)

  • Hong, Young-Sik;Kim, Sang-Deok;Oh, Chang-Gyu
    • Information Systems Review
    • /
    • v.8 no.3
    • /
    • pp.1-20
    • /
    • 2006
  • In recent years change in the business environment has become a way of life. Especially, the revolution of enterprises that utilizes information system is mainly considered as a representative change effort. However, the studies on the IT change management are not sufficient not only in the perspective of practitioners but also those of the scholars. In this study we deduce characteristics, scope, strategies and methods of IT change management from literature studies. And we analyze the change management efforts during the introduction of new information system in Supreme Court of Korea and find some implications. One of the findings is that finding out the right stakeholders of the change and their needs is crucial to the success of the project.

A Study on Estimation Model of Construction Duration for Public Construction (공공건설공사 공사기간 산정모델에 관한 연구)

  • Kim, Byeong-Soo;Chun, Jin-Ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.142-151
    • /
    • 2005
  • On public constructions, that the first planed projects delay than the scheduled completion day occurrence frequently because gap between the scheduled construction durations and the actual construction durations. These facts connect with not only problems of the construction during as the construction delay but also brought about the distribution costs increase as the failure of facility use plan and the people discomfort weight, failure of the production and the supply using facility then tremendous loss of each part etc. For reduce these loss, it must improve accuracy of the scheduled construction duration estimating when it order. This study try contribute to a successful manage of public project and reduce the construction duration extension frequent of the construction during, and then ensure the suitable construction duration by present the estimation model of the scheduled construction duration that include the construction duration correct element using as an index on the scheduled construction duration estimation.

Technology Commercialization Model of Public R&D Based on Living Labs (리빙랩을 활용한 공공연구개발의 사업화 모델 도출)

  • Song, Wichin;Jeong, Seohwa;Han, Kyu-young;Seong, Jieun;Kim, Jongseon
    • Journal of Korea Technology Innovation Society
    • /
    • v.20 no.2
    • /
    • pp.458-486
    • /
    • 2017
  • This article suggests Living Lab approach as a technology commercialization model of public research and development (R&D) projects. Living Lab is a model for end-users, private companies, research institutes, and public organizations to develop technology in a living space which works as a laboratory. Unlike the dominant technology commercialization model which focuses on private enterprises, a new living lab model discusses end-user centered commercialization. Based on general living lab model, three types of technology commercialization model are suggested. The 'Demand exploring type living lab' and the 'Problem solving type living lab' are project-based living lab. The other type of living lab is 'Living lab platform'. The projectbased living lab can be utilized as modules when promoting R&D projects. On the other hand, the living lab platform is infrastructure to provide living labs services to companies, public institutes and municipalities.