Application Study of Requirement Traceability Matrix (RTM) to ITER AC/DC Converter Plant Interlock System (PIS) (요건추적매트릭스의 국제핵융합실험로 AC/DC 컨버터 Plant Interlock System(PIS) 적용연구)
-
- Proceedings of the KIPE Conference
- /
- 2015.11a
- /
- pp.119-120
- /
- 2015