• Title/Summary/Keyword: 계약 프로세스

Search Result 95, Processing Time 0.027 seconds

Analysis of Munitions Contract Work Using Process Mining (프로세스 마이닝을 이용한 군수품 계약업무 분석 : 공군 군수사 계약업무를 중심으로)

  • Joo, Yong Seon;Kim, Su Hwan
    • Journal of Intelligence and Information Systems
    • /
    • v.28 no.4
    • /
    • pp.41-59
    • /
    • 2022
  • The timely procurement of military supplies is essential to maintain the military's operational capabilities, and contract work is the first step toward timely procurement. In addition, rapid signing of a contract enables consumers to set a leisurely delivery date and increases the possibility of budget execution, so it is essential to improve the contract process to prevent early execution of the budget and transfer or disuse. Recently, research using big data has been actively conducted in various fields, and process analysis using big data and process mining, an improvement technique, are also widely used in the private sector. However, the analysis of contract work in the military is limited to the level of individual analysis such as identifying the cause of each problem case of budget transfer and disuse contracts using the experience and fragmentary information of the person in charge. In order to improve the contract process, this study analyzed using the process mining technique with data on a total of 560 contract tasks directly contracted by the Department of Finance of the Air Force Logistics Command for about one year from November 2019. Process maps were derived by synthesizing distributed data, and process flow, execution time analysis, bottleneck analysis, and additional detailed analysis were conducted. As a result of the analysis, it was found that review/modification occurred repeatedly after request in a number of contracts. Repeated reviews/modifications have a significant impact on the delay in the number of days to complete the cost calculation, which has also been clearly revealed through bottleneck visualization. Review/modification occurs in more than 60% of the top 5 departments with many contract requests, and it usually occurs in the first half of the year when requests are concentrated, which means that a thorough review is required before requesting contracts from the required departments. In addition, the contract work of the Department of Finance was carried out in accordance with the procedures according to laws and regulations, but it was found that it was necessary to adjust the order of some tasks. This study is the first case of using process mining for the analysis of contract work in the military. Based on this, if further research is conducted to apply process mining to various tasks in the military, it is expected that the efficiency of various tasks can be derived.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

프로젝트 조달 관리

  • 박순규
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.335
    • /
    • pp.53-64
    • /
    • 2004
  • 프로젝트 조달관리에는 프로젝트의 범위를 달성하기 위하여 수행 조직의 외부로부터 상품 및 서비스 용역을 획득하기 위해 필요한 조달 기획, 의뢰 기획, 의뢰, 공급자 선택, 계약행정 관리 및 계약종결의 프로세스가 포함된다.

  • PDF

The Rationalization of Contract Sum Adjustment through Case Study of Price Fluctuation Adjustment based on Index Adjustment Method (물가변동조정 사례분석을 통한 지수조정방법기반 계약금액조정 합리화방안)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.70-78
    • /
    • 2011
  • In case of long time progressive construction work, we need contract sum adjustment due to escalation for a period of works and the process of applying, consistent and obvious criterion is required. In this study, it were attempted to figure out problem and study this rational improvement by giving examples based on core activities of escalation adjustment. Based on literature study and legal system analysis, we classified processes of contract sum adjustment for escalation and defined 20 core activities for each process. From this measured variable, we carried out case study by giving 37 examples of escalation. As a result of case study, problems of each process was found and we suggested rational improvement. As this study, providers will be able to waste budget and the other will be given smooth escalation adjustment.

Research on International Technical Cooperation Relationship Process Model (국제기술협력 관계 프로세스 모형 개발에 관한 연구)

  • Kim, Jin-Suk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.11
    • /
    • pp.4796-4800
    • /
    • 2011
  • In this paper has been developed a process model for the international technical cooperation. Model consists of five steps: Beginning phase, Partner search phase, contract phase, execution phase and exit phaseInthe beginning phase. The industries need to know about their own require and in the partners search phase they have difficulty navigating partner and to find the fit partner. In agreement phase the industries have problme with international law and in the execution phase they have cultural difficulties. Therefore, the government may need to seek support programs for each step.

NFT-based untact contract service (NFT 기반 비대면 계약 서비스)

  • Kwon, Yong-Jun;Kim, Nam-Seok;Lee, Jong-Hoon;Im, Soo-Min;Ko, Seok-Ju
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2021.11a
    • /
    • pp.330-333
    • /
    • 2021
  • 2020년 전자서명법 개정으로 공인인증서가 폐지됨에 따라 자체 인증 기술의 도입이 필요한 실정이다. 특히나 COVID-19로 인한 비대면 상황이 지속됨에 따라 기존 아날로그 방식을 통해 대면으로 계약서를 작성하고 수립하는데 많은 비효율적 문제가 대두되었다. 디지털 전환 가속화와 비대면 거래확대로 인한 전자 신원확인 중요성이 점차 커지고 있음에 따라 전자 서명 및 전자 봉투 방식으로 계약할 수 있는 안전한 시스템 개발을 진행하고자 한다. 이를 위해 계약 시스템의 보안 요구 사항을 도출하였으며 최종적으로 NFT 연동을 통해 안전한 계약을 진행할 수 있도록 프로세스를 설계하였다. 시스템의 동작 방식을 표현하기 위하여 DFD 등을 포함한 Diagram 형태로 나타내었으며 실제 프로토타입을 제작 후 블록체인 네트워크에 연결한 뒤 테스트를 진행하여 시스템 검증을 수행하였다. 추후 이 시스템을 통해 B2B, B2C 모델 등의 모델 기반 다양한 거래와 계약이 가능하도록 구성할 예정이며 추가적인 연구를 진행하여 사용자 측면에서 더 간편하고 안전한 환경이 될 수 있도록 고도화 시키는 것을 목표로 한다.

Case study on improving the business process of the curved block assembly shop in shipbuilding (조선 곡블록 공장의 운영프로세스 개선 사례 연구)

  • Min Sang-Gyu;Lee Sang-Hyeop;Kim Ji-On;Choi Tae-Hun;Ha Seung-Jin;Baek Tae-Hyeon;Han Yeong-Sam;Park Jae-U;Kim Yong-Su
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1586-1591
    • /
    • 2006
  • 조선사는 선주와의 계약에 의한 수주 생산방식으로 계약시 명시된 작업시작일, 도크작업시작일 진수일, 인도일을 지키기 위한 공정별 목표 생산완료일을 결정하게 되고, 각 공장별로 목표 생산완료일을 지키기 위한 일정계획을 수립하게 된다. 생산되는 선박은 선종, 선형에 따라 구성되는 블록의 수가 다르고 그 형태도 매우 다양하다. 그러므로 선박을 건조하기위해 제작되는 블록의 정확한 작업공기와 공수를 예측하기가 매우 어렵다. 본 논문에서는 불확실한 작업공기와 공수를 이용하여 작업장의 공간제약을 고려한 일정계획을 수립하는 문제에 대하여 기존의 공간제약 문제에 대한 연구에서 나아가 실행 단계에서의 운영프로세스를 개선하여 적용하는 연구를 수행하였다. 이번 연구의 결과로 목표 생산계획과 부서계획, 실행 실적을 과거 데이터와 비교분석 하여 개선된 운영프로세스의 효과를 검증하였다.

  • PDF

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.