• Title/Summary/Keyword: 건축물 유지관리

Search Result 506, Processing Time 0.03 seconds

The Study on the Comparison of Building Use Classification between Building Act and Installation.Maintenance & Safety Management of Fire-Fighting System Act (건축법과 소방시설 설치유지 및 안전관리에 관한 법령간 건축물 용도분류체계 비교 연구)

  • Hwang, Eun-Kyoung
    • Fire Science and Engineering
    • /
    • v.23 no.4
    • /
    • pp.112-119
    • /
    • 2009
  • Building use classification is classified the building types according to the similar structure, the goal of the use, and its shape. The important reason of building use classification is that building restrictions are applied according to building use classifications. But there are a lot of confusion because the building use classification is regulated not only by the Building Act but also by the several individual Act. Particularly in the large-scaled, high-raised and complex building construction, it is very important to remain the consistency of the building use classification between the Building Act and the Fire-Fighting System Act for safety of occupants. So the purpose of this study is to suggests the improve direction of the building use classifications through the comparative analysis of the Building Act and the Fire-Fighting System Act.

Development of Optimal Facility Management (FM) Process Using Spatial-data-based Mean Time Between Failure (MTBF) Analysis (공간정보 기반 MTBF 분석을 활용한 최적의 FM 프로세스 개발)

  • Yoon, Jonghan;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.43-51
    • /
    • 2018
  • Facility Management (FM) phase in building lifecycle management is the most crucial phase concerning building value and life cycle cost management. Nevertheless, systematic and rational FM process is not yet constructed, leading to failure of facility value and cost management from accurate and proactive FM. This is because there has been minimal approach regarding construction of optimal FM process based on rational FM data analysis. The purpose of this study is to provide optimal FM process with quantitative FM data analysis method using spatial data. This study investigated existing FM data structure and derive the limitation of it from both expert interview and practical FM material analysis. As a solution for this limitation, this study provided optimal FM process with MTBF (Mean Time Between Failure), which is quantitative FM data analysis method. The effect of the provided process was validated with a case study. It is expected that this process allows rational and objective FM data analysis, resulting in accurate and proactive FM. And it is expected that it can be used as a useful basic data for developing an effective system for the FM process.

A study on the Improvement of the Korea Green Building Certification Criteria by Assessing the Maintenance Categories (국내 친환경 건축물 인증 제도의 유지관리 부문 개선 방안)

  • Kim, Chang-Sung;Kim, Kyung-Ah
    • KIEAE Journal
    • /
    • v.11 no.5
    • /
    • pp.129-135
    • /
    • 2011
  • Many countries have carried out various policies about sustainable building to protect the earth against the global warming and environmental pollution. Korea government has also executed the Green Building Certification System. In order to keep the performances of certificated buildings sustainable, the effective building maintenance is quite necessary. Meanwhile, the foreign green building certification systems have considered the building maintenance as one of the most important items to keep the building performance effective. However, Green Building Certification Criteria(GBCC) of Korea has not had the sufficient criteria for the maintenance of green building. Therefore, The purpose of this study is to find direction for the improvement of management categories of Korea Green Building Certification Criteria. For this aim, GBCC was compared with the foreign certification systems such as LEED, BREEAM and CASBEE.

A Study on the Improvement of Public Facility Management System Using Life-cycle Management (Life-cycle Management를 활용한 공공시설 유지관리 시스템 개선방안)

  • Jeon Ick-Sung;Shon Jeong-Rak;Kim Kyung-Suk;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.55-63
    • /
    • 2004
  • A building structures was used the facility management phase through $planing\cdotdesign\cdotconstruction$. phase. building's length of life was shorter than its physical length of life, because of the lack of law and institution, the lack of related agencies' preparation and owner's preparation. Also, considering the construction life-cycle, the facility phase accounted for $70\%$ of whole official lift, therefore, it needed to be opposed to systemic facility management. Current facility management system practically managed the defect of facility and almost never communicated between the other phase. In the side of policy, domestic law, institution, and policy related to building structure focused built-up market. and then the management of existing facilities was not consolidated efficiently. The purpose of this study was to suggest the direction of facility management construction for managing, utilizing, and operating public facilities, moreover, to study the direction of current facility management system improvement corresponding to total computer integrated construction system under government agencies.

A Study on The Management of A Building by Applying RFID/USN (RFID/USN의 적용을 통한 건축물 관리 방안)

  • Ju, Hyun-Tae;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.331-336
    • /
    • 2007
  • The importance of a building management is embossed at construction industry and the concernment about a lengthening longevity and a efficient management of construction project is concentrated. At present, a study about maintenance management of existing building is progressed and normal papers concentrate in partial construction project for showing management method. This paper proposes Management method that make use of RFID/USN at the whole course of construction project that is composed plan, design, supply, construction, operation, maintenance management and so on. First of all, this paper analyzes process and applicable scope of RFID/USN at construction project. At each step, use scope, location, method and so on are decided at plan, design step and equipment, human power, materials and so on are established at supply step. real time progress, human power, safety, material, equipment management and so on put in operation at construction step and building is managemented real time by established sensor tag and wireless sensor network. This paper want to helps efficient project progress and management and presents convenience of maintenance management.

  • PDF

An Analysis on the Correlation between Crack Condition and Safety Grades in Masonry Buildings (조적조 건축물의 균열양태 및 등급판정과의 상관성에 관한 연구)

  • Kwon, Ki-Hyuk
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.3
    • /
    • pp.101-110
    • /
    • 2005
  • In Seoul, structural deterioration is severe in the private masonry buildings which have been built since 1906s. But most of these structures remain without any repair works. As a result, the rate of deterioration is getting faster and these dangerous structures may cause hazardous circumstances to the adjacent structures and neighborhood. The purpose of this study is to investigate the actual conditions of wall cracks among the defect types which occur in private masonry buildings and to analyze the correlation between safety grades and wall cracks for offering the fundamental data. Using these date we can establish basic criteria for safety grades of structures and improve the quality of masonry buildings. The result of this study indicate that there are high correlations between safety grades and the width of crack but much less so with the length. Furthermore, with regard to crack patterns, vertical cracks much more negatively effected the safety grades.

The Analysis for Development Evaluation System of G-SEED Building Maintenance and Management (녹색건축인증 건축물 유지관리 평가제도 발전을 위한 연구)

  • Kim, Yu-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.261-262
    • /
    • 2016
  • In Korea, Green building certification system had been operated for more than 10 years and Expired certification buildings are ever-increasing. However, post management of building and qualification standard for re-certification(G-SEED) aren't exist, certificated green building don't have smoothly maintenance and management. Therefore, analysing the status and situation of similar system such as building maintenance and management, to suggest the direction of evaluation for green standard for energy and environmental design.

  • PDF

A Case Study of maintenance cost estimation for military official residence building in BTL project (BTL사업 군관사 건축물의 유지관리비용 산정에 관한 연구)

  • Kwon, Bum-Joon;Kim, Hyun-Kyu;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.851-854
    • /
    • 2008
  • The purpose of this study is to predict the maintenance cost for military official residence building projects which were ordered for five military official residence building. In conducting this study, the adapted research method was to classify initial investment for each construction of the military official residence building and to estimate maintenance cost. This study was analyzed by studying the estimation of maintenance cost in the apartments and present value analysis method. The results of this research are as follows. 1) The initial investments was analyzed that the total construction cost would be 1,683,286 thousand won ; construction(79%), civil(3%), landscaping(2%), MEP(5%), heating and hot water supply system(5%), and water supply and sanitary system(6%) per square meter. 2) Based on the result analyzed above, the maintenance cost of the apartments was analyzed and then estimated the proper maintenance cost by using maintenance cost estimation method and present a value analysis method.

  • PDF