• Title/Summary/Keyword: 건설참여주체

Search Result 124, Processing Time 0.025 seconds

Analysis of Construction Dispute Cases Considering Reward Ratio Focused on Arbitration Cases of Korean Commercial Arbitration Board (보상비율을 고려한 건설사업 분쟁사례 분석 - 대한상사중재원 중재판정사례를 중심으로 -)

  • Ahn, SangHyun;Choi, Heeju;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.48-56
    • /
    • 2017
  • Construction Projects have many participants by characteristic, scale and contract. Those also have complicated communication structure. So, claim and dispute occur continuously for conflicting communication. In many claim and dispute cases, it usually occurs between builder and owner. Unfair practices by owners position cause main claim and dispute. This study analyses judgment type, cause and compensation ratio in korean commercial arbitration case and provides the dispute information for builder that has weak position by contract. It draws analysis information for managing and controlling dispute that order type, judgement type, cause and failure case. Using these analysis information, it hopes to help inducement of dispute agreement and save time and economic damage for builder during construction. It also hopes to rise construction completeness by providing dispute management information.

IFC test between commercial 3D CAD application using IFC (IFC를 중심으로 한 상용 3D CAD의 호환성테스트)

  • Lim, Jae-In;Kim, Jae-Woo;Kwon, Hyuk-Do;Yoon, Su-Won;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.85-94
    • /
    • 2008
  • The process of construction industry basically consists of many complicated phase, such as planning, design, construction, MO&R(Maintenance, Operation, and Repair), and deconstruction. And various participants communicate each other during every phase of process. Since construction components have become more complex and diverse recently, many researches on how to exchange and standardization of building. However, in Korea research on IFC(Industry Foundation Classes) which is a standard for international data exchange have been conducted with only study limited Issues, such as studies on the development of 2D extension model for IFC, researches on 3D or 4D based IFC extension, and etc. This stuff covers tests of the compatibility among commercial 3D CAD programs using IFC file format. Several problems of the current IFC model are retrieved as a result.

A Study on Schedule Management in Construction Project Using the Dependency Structure Matrix(DSM) (DSM을 이용한 건설사업 공정관리에 관한 연구)

  • Jang, Se-Hoon;Park, Moon-Seo;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.682-686
    • /
    • 2007
  • Construction project has been more complex and bigger as various demands of the times. But current schedule management method in construction project uses only PERT or CPM made in 1950s without innovation. Also current schedule management focuses on not information flow between activities and variability of information exchanged but result. This paper suggest using the DSM(Dependency Structure Matrix) in schedule management of construction project to overcome limitations of current scheduling tools. DSM has been introduced as a new theory in construction industry in 1990s at the United States, but its application is still insufficient in domestic field due to the absence of systematic study.

  • PDF

Governance for the negotiation and Management of Water Resources related Conflicts (수자원과 관련된 분쟁 및 갈등의 조정을 위한 거버넌스)

  • Lee, Joo-Heon;Kim, Hyung-Soo;Hong, Il-Pyou;Kang, Bu-Sik;Kim, Kwang-Hun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1530-1535
    • /
    • 2008
  • 수자원과 관련된 많은 분쟁 및 갈등들은 국내뿐만 아니라 전 세계적으로 발생하고 있다. 따라서 분쟁 및 갈등해결을 위한 많은 연구들이 진행되고 있지만 수자원과 관련된 분쟁들은 대부분 원활한 해결을 이루지 못하고 있으며, 특히 국내의 경우에는 더욱 심각하다 할 수 있다. 따라서 제한된 자원인 수자원을 둘러싸고 수자원분쟁이 일어나는 것은 당연한 일이라 할 수 있으며, 분쟁의 양상도 다양하다. 댐 건설로 인한 상류지역과 하류지역의 갈등, 수로의 건설로 인해 수자원을 빼앗기는 지역과 수자원을 얻게 되는 지역 간의 갈등, 새로운 공단이나 개발로 인하여 하류지역에서 수질악화를 우려하여 반대하는 경우 등 여러 종류의 수자원으로 인한 분쟁이 있다. 수자원을 둘러싼 갈등이 쉽게 해결이 되지 않고, 또한 갈등 및 분쟁이 쉽게 발생되는 이유도 주체자들간 입장 차이에서 오는 성격이라 할 수 있겠다. 수자원과 관련된 분쟁에서 오는 여러 가지 갈등들은 사회적으로 많은 문제들을 발생시켜 수자원의 원활한 공급이 저해될 수 있다. 이로 인해 사회적으로 수자원과 관련된 분쟁 해결에 들어가는 많은 시간과 노력, 비용을 생각해 볼 때, 효과적인 갈등 및 분쟁의 해결은 국가적 발전에 있어서 영향을 줄 수 있다. 그러므로 갈등 및 분쟁의 원활한 해결이 국가적 발전에 많은 비중을 차지 한다고 할 수 있다는 것은 이런 이유들 때문이라 할 수 있다. 본 연구에서는 국내 수자원과 관련된 분쟁사례들을 하천의 기능에 따른 분류, 발생 원인에 따른 분류, 분쟁주체에 따른 분류 등을 유형별로 구분하여 수자원분쟁의 여러 가지 사례들을 조사하였다. 또한 분쟁 및 갈등을 해결하기 위한 방안으로 거버넌스 시스템을 적용하였고 분쟁의 원활한 합의 조정방안 및 문제점을 제시하기 위한 외국의 시민참여 모델을 특징 및 특성을 분석하였다. 또한, 공영시각모형, 게임이론, 제도설계이론의 공학적 모형을 바탕으로 물분쟁의 해결을 위한 대안을 모색할 수 있는 과학적 접근 방안을 제시하여 향후 여러 가지형태의 국책사업 시행 시 발생 할 수 있는 분쟁의 해결 및 조정을 위한 방안으로 활용할 수 있는 토대를 마련하고자 한다.

  • PDF

The Development of a Web-based Decision Support System for Construction Claim Management (건설 클레임 관리를 위한 웹기반의 의사결정 지원 시스템 개발)

  • Sung, Nak Won;Kim, Young Suk;Lee, Mi Young;Lee, Jung Sun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.115-123
    • /
    • 2006
  • Recently, construction claims have been increased for protecting the rights of construction participants and effectively adjusting the changes under the contract. Thus, the importance of claim management has been emphasized in the construction industry. In domestic construction industry, some claim issues involved in construction activities are often being developed into disputes and even litigations because of the absence of methods or systems for the dispute resolution, and the lack of judicial precedents which can be provided as the references for resolving a particular dispute. In general, the judicial precedents related to the disputes and litigations occurred among construction participants would be extremely valuable in evaluating and analyzing current claims issues. However, such useful information has not been effectively accumulated and utilized in resolving the similar or sometimes identical types of disputes, thus requiring a large amount of additional costs, time and efforts. The primary objective of this study is to propose a web-based decision support system for construction claim management, which enables contractual participants to easily access and use the information of the judicial precedents related to the current construction claims. The decision support system is composed of 'prevention' and 'settlement' modules for avoiding and systematically resolving the construction claims.

Development of Gateway Review System for Supporting Collaborative Decision-Making through Project Life Cycle (사업 단계별 의사결정 지원 게이트웨이 리뷰 체계 구축)

  • Shin, Seung-Woo;Yi, June-Seong;Lee, Jee-Hee;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.43-54
    • /
    • 2010
  • As Urban Regeneration is being carried out, stakeholders are most likely to have disagreements on their interests. Besides, dispersion of numerous communication routes and obscure decision processes aggravate the situation. Eventually, fragmented decision-making processes and complex structure lead to inefficient outcome and delay of projects. This paper is a study on decision-making support not only helps the program manager have more efficient and optimum decision, but also provides alternatives for Urban Regeneration. This study is conducted as follows. Firstly, the project process and the decision-making structure among stakeholders in Urban Regeneration are analyzed, and then the current status of decision-making in Urban Regeneration project is classified. Secondly, with literature study on "Gateway Review", the decision-making gateway review process in Urban Regeneration is defined, and then the "Gateway Review Elements" are listed. Thirdly, to establish gateway review process, this paper presents a check points, namely gate which supports a program manager to monitor and to control the program management in Urban Regeneration. Each gate has several supporting tools such as diagram of critical decision points relation, scheme of stakeholder, checklist. Fourthly, the proposed concept is verified by experts who have been carefully selected to provide their respective reviews. Finally, decision-making support gateway review system is modified based on their critiques and suggestions.

A Case Study on the Demolition of Power Plant with Blasting Method for the First Time in Korea (국내 최초 발파공법 적용 발전소 해체 사례)

  • Oh, Ki-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.87-88
    • /
    • 2023
  • 서해안 최고의 동백정해수욕장과 마량리 동백나무숲은 1970년대 오일쇼크 이후 에너지 자립을 위해 발전소를 건설하면서 사라졌다. 그 당시 준공된 화력발전소는 전력공급 이라는 소임을 완수하고 2021년 부터 동백정의 아름다운 옛 모습 그대로 지역주민에게 돌려 주기위한 친환경 사업으로 발전소 철거공사를 시작, 동백정 복원공사를 추진 하기로 했다. 고층 및 중량물의 건축물 및 구조물을 안전하게 해체하기 위해서는 국내 최초 발전소 철골구조물에 대한 발파·전도공법을 채택 하였다. 철거작업은 고위험 공종으로 참여 주체인 발주자, 설계자, 감리자, 시공자 및 근로자 전 계층의 참여로 사전 위험성평가를 통해 근원의 위험요인 발굴 및 안전대책 수립, 수립된 안전대책 100% 이행을 통해 무재해 준공 달성 하기를 기대한다.

  • PDF

A Study on the Analysis of Issue Items on Negotiation Stage of Build Transfer Lease Project (건축분야 임대형 민자사업 협상단계 쟁점 분석에 관한 연구)

  • Park, Yeong-Cheol;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.57-66
    • /
    • 2009
  • This study aimed to find major issues on negotiations of the BTL project, to analysis the degree, and to investigate the underlying cause and propose solutions. Data were collected from authorities in charge and the companies which have participated in BTL projects. Also, the weights of major issues were analyzed using Analytic Hierarchy Process method(AHP), which uses pair-wise comparison between variables, and the degree of them were listed in the quantitative way. As a result, 4 part had each 2 reasons and others had one reason among 6 negotiation parts of first step. In addition, the solutions were indicated.

Cyclical Analysis of Construction Business Using Filtering Model (국내 건설경기의 순환변동 분석)

  • Suh, Myong-kyo;Kim, Hyung-Joo
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.9
    • /
    • pp.300-309
    • /
    • 2017
  • This paper examines the cyclical fluctuation of 'construction orders' and 'construction investment' using HP filter, Bandpass filter and Beveridge-Nelson decomposition methods. The main results are as follows. As a result of the analysis of the cyclical fluctuation of construction orders, it was analyzed that there were about 7 cyclical fluctuations from 1976 to the first quarter of 2017. Construction orders for cyclical fluctuations peaked in the second quarter of 2015 and turned to a downward trend. On the other hand, construction investment has experienced about 6 cycles of fluctuations during the same period, and it has been rising continuously since the bottom of 3Q12. This is consistent with the general theory that construction orders precede construction investments. In addition, the comparison of the construction orders, construction investment, and GDP amplitude shows that the GDP amplitude is the smallest and stable, and the construction orders have the greatest variation in amplitude. Therefore, construction orders should be adjusted by government policy depending on economic fluctuations.

The Development of Business Information System based on BPS for Urban Regeneration Projects (BPS기반의 도시재생사업 업무정보 시스템 구축)

  • Kim, Il-Woo;Seo, Jae-Pil;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.3-13
    • /
    • 2012
  • Urban area has caused decline of commercial function and infrastructure because of unorganized urban development, and urban regeneration projects have appeared since 2000s in order to solve urban problems. Because urban regeneration projects have a complexation of various use, the complicated business process and unsystematic conduction work, project stakeholders are suffering from problem in conducting project. Therefore, this study suggested the necessity of business system for urban regeneration projects with analyzing situations and stakeholders. Also, this study classified business information through development of BPS in order to make information system of business process in the urban regeneration project and evaluated it after realization for information system based on BPS of urban regeneration projects. Project stakeholders will be systematically provided information about urban regeneration projects through this system and it is expected to accomplish urban regeneration projects effectively.