• Title/Summary/Keyword: 건설시뮬레이션

Search Result 590, Processing Time 0.025 seconds

A Study on Travelling Characteristics and Choice of Proper Location of Dam Discharge Alarm Broadcasting (댐 방류 경보방송의 전달 특성 및 적정 위치 선정에 관한 연구)

  • Kim, Dae-Goon;Kim, Jae-Soo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.31 no.8
    • /
    • pp.635-640
    • /
    • 2009
  • After 1960s, in accordance with getting bigger in changing range of annual rain precipitation, those dams were built in order to prevent any drought and flood through the regulation of flux. In case of such dam, when it reaches to some definite pondage, for its regulation of water volume, numerous volume of water in the reservoir should be discharged by opening the floodgate, at this time a severe damage can be occurred to those lives and properties of the residents and tourists at the river or riverside. Accordingly, despite the sounding alarm broadcasting for prevention and notice such damage could be clearly travelled to those people without influence by the discharging noise or other neighboring environmental factor, since it was only empirically installed without any peculiar research until now, the alarm broadcasting could not effectively travel, and the travelling distance also could not known correctly. On such point of view, this Study has ever grasped the characteristics by frequencies and its sound pressure level about the discharge noise and the alarm broadcasting of Daechung Dam, one of multipurpose dams through the measurement and analysis by distances, and based on this, also has ever presupposed the proper location of additional alarm broadcasting spot using a simulation program named Cadna-A.

Analysis on the behavior of shield TBM cable tunnel: The effect of the distance of backfill grout injection from the end of skin plate (뒷채움 주입 거리에 따른 전력구 쉴드 TBM 터널의 거동 특성 분석)

  • Cho, Won-Sub;Song, Ki-Il;Ryu, Hee-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.213-224
    • /
    • 2014
  • Recently, tunnelling with TBM is getting popular for the construction of cable tunnel in urban area. Mechanized tunnelling method using shield TBM has various advantages such as minimization of ground settlement and prevention of vibration induced by blasting that should be accompanied by conventional tunnelling. In Korea, earth pressure balance (EPB) type shield TBM has been mainly used. Despite the popularity of EPB shield TBM for cable tunnel construction, study on the mechanical behavior of cable tunnel driven by shield TBM is insufficient. Especially, the effect of backfill grout injection on the behavior of cable tunnel driven by shield TBM is investigated in this study. Tunnelling with shield TBM is simulated using 3D FEM. The distance of backfill grout injection from the end of shield skin varies. Sectional forces such as axial force, shear force and bending moment are monitored. Vertical displacement at the ground surface is measured. Futhermore, the relation between volume loss and the distance of backfill grout injection from the end of skin plate is derived. Based on the stability analysis with the results obtained from the numerical analysis, the most appropriate injection distance can be obtained.

Estimation of Appropriate Infiltration Rate and the Effects of the Flowerbed Type Infiltration System (화단형 침투시설의 단위설계침투량 산정 및 효과분석)

  • Han, Young-Hae;Lee, Tae-Goo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.5
    • /
    • pp.140-147
    • /
    • 2012
  • This study developed a flowerbed type infiltration system that could control the amount of runoff discharge under a certain level estimated its proper design infiltration rate, and analyzed the effects of its implementation. Analyzing the performance of infiltration system is the one of the essential processes that should be under review to predict its effects after implementation when a rainwater infiltration system is included in a district-based plan. To estimate the unit design infiltration rate of this system, the runoff decrease effect was analyzed by varying the unit infiltration rate of the system applied to the parking lot adjacent to the Korea Institute of Construction Technology laboratory building by using a water balance analysis program. After varying the unit design infiltration to $0.1{\sim}3m^3/m^2.day$ to analyze the variation in the rate of runoff, 80% of the runoff was infiltrated at $1.0m^3/m^2.day$, and the unit infiltration design rate at the time was 0.0416(m3/m2.hr). It was also found that the unit design infiltration rate obtained from a field infiltration test of the developed system was about $0.045m^3/hr$. Based on this study, it was possible that infiltration rate is estimated to consider the economic scale and environmental effect. It is significant to apply the spatial plan of rainwater infiltration system as green infrastructure.

A Study on the Microcomputer Aided Port Design Simulation and its Application to the Third State Busan Port Development Project. (컴퓨터시뮬레이션을 이용한 항만설계 및 부산항 3단계 개발 계획에 관한 응용에 관한 연구)

  • 김환수
    • Journal of the Korean Institute of Navigation
    • /
    • v.15 no.1
    • /
    • pp.12-47
    • /
    • 1991
  • This work aims to introduce the concept of microcomputer aided port design simulation methodology including the analysis of the mathematical models to be implemented and apply it to the Third Stage Busan Port Development Project. In the Busan case study, the size of the proposed turning basin of the new terminal, together with the operational strategies of berthing and unberthing, was examined, In addition, the safety on ship's entry and exit through the projected new breakwaters was ascertained. From the application of simulation to the Busan project, it was found that the proposed dredging area was not sufficiently wide enough for the modelled container ship to perform A time unberthing (in which the ship turns to port as she manoeuvres away from N.1. Berth with the assistance of tugs), especially in a strong easterly wind. It is therefore, recommended that Busan pilots should be advised to sue B type unberthing strategy, in which the ship goes astern from no.1 berth tot he turning area in front of No.2 berth(where the ship turns 180 degrees clockwise), especially when the wind is very strong, It is also recommended that a sea buoy be placed outside the new breakwaters, as this was found to improve the safety of ship manoeuvres through the breakwaters significantly . Another recommendation is that the Korean hydrodynamic Office carry out a detailed survey of the currents in the water area near the new breakwaters once they have been constructed. In addition, it is to be recommended that a current meter be placed at the recommended sea buoy to improve the safety of ship manoeuvres which could otherwise be jeopardised by eeroneos current information.

  • PDF

The Road Reservation Scheme in Emergency Situation for Intelligent Transportation Systems (지능형 교통 시스템을 위한 긴급 상황에서의 도로 예약 방식)

  • Yoo, Jae-Bong;Park, Chan-Young
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.11B
    • /
    • pp.1346-1356
    • /
    • 2011
  • Transportation has been playing important role in our society by providing for people, freight, and information. However, it cuts its own throat by causing car accidents, traffic congestion, and air pollution. The main cause of these problems is a noticeable growth in the number of vehicles. The easiest way to mitigate these problems is to build new road infrastructures unless resources such as time, money, and space are limited. Therefore, there is a need to manage the existing road infrastructures effectively and safely. In this paper, we propose a road reservation scheme that provides fast and safe response for emergency vehicles using ubiquitous sensor network. Our idea is to allow emergency vehicle to reserve a road on a freeway for arriving to the scene of the accident quickly and safely. We evaluate the performance by three reservation method (No, Hop, and Full) to show that emergency vehicles such as ambulances, fire trucks, or police cars can rapidly and safely reach their destination. Simulation results show that the average speed of road reservation is about 1.09 ~ 1.20 times faster than that of non-reservation at various flow rates. However, road reservation should consider the speed of the emergency vehicle and the road density of the emergency vehicle processing direction, as a result of Hop Reservation and Full Reservation performance comparison analysis. We confirm that road reservation can guarantee safe driving of emergency vehicles without reducing their speed and help to mitigate traffic congestion.

Optimizing Total Transport Cost Incurred under Specific Port System: With a Case of Managing POSCO-owned Berths (특수항만구조하에서의 물류비용 최적화에 관한 연구 - 포항제철의 원료부두 사례를 중심으로 -)

  • Kim, Weon-Jae
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.3
    • /
    • pp.42-55
    • /
    • 2010
  • This paper primarily deals with a decision-making for determining the number of voyages in each ship size under a specific port structure in order to minimize the total transport cost consisting of transport cost at sea, queuing cost in port, and inventory cost in yard. As a result of computer simulation using queuing model characterized by inter-arrival time distribution, we were able to find out some combination of voyage numbers of 3 ship-size(50,000-ton, 100,000-ton, and 200,000-ton), where the total transport cost can be minimized under a specific port structure. The simulation model also allows us to figure out any trade-off relationship among sea transport cost, queuing cost in port, and inventory cost in yard. Put it differently, an attempt to reduce the sea transport cost by increasing the number of voyages of the largest ship size, the transport cost incurred in both port and yard is hypothesized to be increased and vice versa. Consequently, Port managers are required to adjust the number of annual number of voyages allocated in each ship size, put into the sea lines for importing raw materials, in order to optimize the transport costs incurred under the specific port system. We may consider a net present value(NPV) model for performing an economic feasibility analysis on port investment project. If a total discounted net benefit, including cost savings, exceeds the initial investment for an additional berth construction, then we accept the port investment project. Otherwise, we reject the proposed port investment plan.

A Study on The Design of China DSRC System SoC (중국형 DSRC 시스템 SoC 설계에 대한 연구)

  • Shin, Dae-Kyo;Choi, Jong-Chan;Lim, Ki-Taeg;Lee, Je-Hyun
    • 전자공학회논문지 IE
    • /
    • v.46 no.4
    • /
    • pp.1-7
    • /
    • 2009
  • The final goal of ITS and ETC will be to improve the traffic efficiency and mobile safety without new road construction. DSRC system is emerging nowadays as a solution of them. China DSRC standard which was released in May 2007 has low bit rate, short message and simple MAC control. The DSRC system users want a long lifetime over 1 year with just one battery. In this paper, we propose the SoC of very low power consumption architecture. Several digital logic concept and analog power control logics were used for very low power consumption. The SoC operation mode and clock speed, operation voltage range, wakeup signal detector, analog comparator and Internal Voltage Regulator & External Power Switch were designed. We confirmed that the SoC power consumption is under 8.5mA@20Mhz, 0.9mA@1Mhz in active mode, and under 5uA in power down mode, by computer simulation. The design of SoC was finished on Aug. 2008, and fabricated on Nov. 2008 with $0.18{\mu}m$ CMOS process.

A Study on the Optimal Width of the Main Span In the 2nd Bridge of lncheon (2) Economic Analysis on Port Operation according to Traffic Schemes in the Main Span (인천항 제2연륙교 적정 주경간 폭 결정에 관한 연구 (2) 주경간의 통항방식에 따른 항만운영의 경제성 분석)

  • Koo Ja-Yun;Kim Seok- Jae;Jang Eun- Kyu
    • Journal of Navigation and Port Research
    • /
    • v.29 no.1 s.97
    • /
    • pp.65-69
    • /
    • 2005
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, has been proposed by the private capital in 1999. But the optimal width of the main span has not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, one-way or two-way of vessels over 10,000G/T, in the main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768.9 billion won.

Assessment of actual condition based on GIS for UHF band Propagation Interference caused by Apartment (GIS를 활용한 아파트 지역의 전파 장애 실태 평가)

  • 김진택;엄정섭
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.389-397
    • /
    • 2004
  • 본 연구는 GIS를 이용하여 아파트 단지의 UHF대역의 전파장애에 대한 예측모델을 제시한다. 전파예측모델은 기지국 및 중계기 위치설계와 전파음영지역 결정 등 무선네트워크 서비스에 결정적으로 활용된다 기존의 전파예측모델은 한국지형요소나 3차원 공간기술이 반영되지 않고 외국지형기반의 2차원적인 접근으로 개발되어 있다. 특히 많은 사람이 거주하는 아파트단지에 대해서는 고려가 되어 있지 않은 실정이며, 마치 아파트 단지가 일반 건물로 취급되어 전파환경 요소로 분류되지 않은 상태이다. 그리고 전파관리자가 기존 전파 예측모델을 이용한 무선네트워크 설계 및 운용등에 있어 정확한 의사결정지원에 어려움이 많다. 본 연구는 이러한 한계와 문제점을 해결하기 위해서 아파트 단지의 전파에 대한 영향을 3차원 공간밀집, 건물높이, 전파의 전송방향에 대한 건물배치등 3가지 요소로 분류하고 GIS 도구로 그 요소들을 분석하였다. 그 결과로 상관과 회귀분석등 정량적인 방법으로 평가하여 아파트 전파예측모델(GARP)을 개발하여 다음의 결과를 얻었다. 첫째, 아파트 단지가 UHF 대역의 전파에 대한 영향은 전파진행방향성이 57%, 공간밀집이 30%, 건물높이가 13%의 순으로 나타났다. 둘째, 본 연구에서 개발된 아파트 모델은 기존 모델에 비해 평균 6.3dBm, 최소 2.15 ~ 최대 12.48dBm의 개선 효과가 있다. 셋째, 급속히 확산되는 도시 개발에 3차원 공간상에서 전파예측모델을 시뮬레이션하여 전파의 영향을 예측할 수 있으며, 대단지 아파트 건설과 전파환경영향평가의 기초정보 수집에 활용될 수 있다. 본 연구는 GARP모델과 GIS 가시권 분석기능을 이용하여 실제 지형공간상에서 전파경로 손실치를 도시화함으로써 전파관리자가 무선서비스지역 설계, 전파음영지역 판단, 최적 중계기와 기지국 위치 선정에 기여할 것으로 판단된다.하지 않은 지역과 서로 다른 분광특성을 나타내므로 별도의 Segment를 형성하게 된다. 따라서 임상도의 경계선으로부터 획득된 Super-Object의 분광반사 값과 그 안에서 형성된 Sub-Object의 분광반사값의 차이를 이용하여 임상도의 갱신을 위한 변화지역을 탐지하였다.라서 획득한 시추코아에 대해서도 각 연구기관이 전 구간에 대해 동일하게 25%의 소유권을 가지고 있다. ?스굴 시추사업은 2008년까지 수행될 계획이며, 시추작업은 2005년까지 완료될 계획이다. 연구 진행과 관련하여, 공동연구의 명분을 높이고 분석의 효율성을 높이기 위해서 시료채취 및 기초자료 획득은 4개국의 연구원이 모여 공동으로 수행한 후의 결과물을 서로 공유하고, 자세한 전문분야 연구는 각 국의 대표기관이 독립적으로 수행하는 방식을 택하였다 ?스굴에 대한 제1차 시추작업은 2004년 3월 말에 실시하였다. 시추작업 결과, 약 80m의 시추 코아가 성공적으로 회수되어 현재 러시아 이르쿠츠크 지구화학연구소에 보관중이다. 이 시추코아는 2004년 8월 중순경에 4개국 연구팀원들에 의해 공동으로 기재된 후에 분할될 계획이다. 분할된 시료는 국내로 운반되어 다양한 전문분야별 연구에 이용될 것이다. 한편, 제2차 시추작업은 2004년 12월에서 2005년 2월 사이에 실시될 계획이다. 수백만년에 이르는 장기간에 걸쳐 지구환경변화 기록이 보존되어 있는 ?스굴호에 대한 시추사업은 후기 신생대 동안 유라시아 대륙 중부에서 일어난 지구환경 및 기후변화를 이해함과 동시에 이러한 변화가 육상생태계 및 지표지질환경에 미친 영향을 이해하는데 크게 기여할 것이다.lieve in safety with Radioactivity wastes control for harmony with Environment.d by the experiments under vari

  • PDF

A Study of Expressway Tollbooth Metering Effect (고속도로 영업소 미터링 효과에 관한 연구)

  • Im, Jin-Won;Yoon, Jae-Yong;Lee, Eui-Eun;Kim, Kwan-Min
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.10 no.4
    • /
    • pp.1-10
    • /
    • 2011
  • According to the worldwide efforts to reduce greenhouse gases consequent upon climatic change, the field of road traffic is also making diverse efforts to reduce the emissions of greenhouse gases. Among these, the exhaust gases from vehicles, the so-called main culprit of the greenhouse gases will take place the more as delay and tie-up of vehicles ever take place. Accordingly, as a scheme for reducing the delay & tie-up of vehicles, it's possible to bring up the idea of supply of new facilities and management of the existing facilities; recently, a lot more focus is being put on the management of the existing facilities due to enormous amounts of construction cost. In the midst of growing concern for traffic demand management policy, it's about the time we should do research on the tollbooth metering on the expressway whose research is almost non-existent home and abroad. As a traffic demand management policy coming to happen in case of the management of pay expressway like Japan and Korea, this research analyzed the contents of tollbooth metering, its effect and its subsequent convenience. Especially as a tool for effect analysis, this research made an analysis using VISSIM-a micro-simulation tool. As the tollbooth metering promoted, as a part of green traffic promotion strategy, is expected to contribute to improvement in traffic flow and reduction in carbon emissions, etc. It seems that there needs to be continuous research work on the management plan & revitalization plan for maximization of its effect later as well.