Abstract
A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, has been proposed by the private capital in 1999. But the optimal width of the main span has not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, one-way or two-way of vessels over 10,000G/T, in the main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768.9 billion won.
인천항의 송도 신도시와 영종도 인천국제공항을 이어주는 제2연륙교 건설사업이 1999년 민간제안사업으로 정부에 제안되어 3차례에 걸친 통항 안전성 연구에도 불구하고 적정 교각폭이 결정되지 못하고 있다. 따라서 본 연구에서는 인천항의 제2연륙교 설치시 왕복통항이가능한 교각폭으로 설계한 경우를 대비하여 10,000G/T이상 선박이 일방통항으로 항로폭을 설계할 경우의 항만운용효율 변화 및 경제성을 분석 하고자 한다. 연구결과, 제2연륙교 항로의 왕복통항대비 10,000G/T 이상 일방통항시 제2연륙교 주경간 항로에서의 총대기시간은 2011년도에 20,362시간, 2020년에는 24,544시간으로 평가되었다. 따라서 10,000G/T이상 선박의 일방통항에 따른 체선$\cdot$체화비용으로 2011년에 약 197억원, 2020년에는 약 233억원이 될 것으로 추정되므로 제2연륙교가 완공될 2008년부터 2040년까지의 33년간의 총 체선$\cdot$체화비용은 약 7,689억원으로 평가되었다.