• Title/Summary/Keyword: 건설사업

Search Result 3,384, Processing Time 0.033 seconds

A Case Study on Construction Management in Nuritkum Square Project (누리꿈스퀘어 프로젝트의 건설사업관리 사례)

  • Lim, Hyun-Yong;Yoo, Seung-Kon;Seo, Joon-Oh
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.25-31
    • /
    • 2007
  • Nuritkum Square Project is a IT Complex which is being constructed in Digital Media City. The project consists of several buildings and is a Design-build, so that the systematic construction management from design to construction stage is more important for a successful project. This study introduces the practical tasks of construction management during the project and analyze some of main tasks to increase understanding construction management in the design-build project. Based on experience of construction management in this project, we examine managerial problems which frequently occur in this kind of project, and suggest how to improve construction management in Korea.

  • PDF

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Construction Management) Considering Safety (안전을 고려한 건설사업관리용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Kim, Baek-Joong;Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.557-566
    • /
    • 2019
  • The construction industry has the most safety accidents of any of the domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening their regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on the client's responsibility for safety management is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

해외 건설 사업 진출의 체크리스트

  • Chae, Gyeong-Ok
    • 주택과사람들
    • /
    • s.208
    • /
    • pp.38-41
    • /
    • 2007
  • 국내 건설 업계의 해외 진출이 봇물을 이루고 있다. 대우, GS 등 대형 건설 업체들이 해외 건설 사업에 박차를 가하고 있다. 2007년 국내 건설 업체들의 해외 진출에 대한 기대는 더욱 커지고 있다. 하니만 아직까지 해외 건설은 현지 규제와 자금 사정 등 여러 암초에 부딪히기도 한다. 해외 건설 수주와 사업을 위한 활로 방안을 모색해보자.

  • PDF

Development of Project Success Index for Construction Projects (건설사업 성공지수 개발에 관한 연구)

  • Gang, Ji-Sun;Kim, Ki-Kook;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.427-430
    • /
    • 2006
  • Recently, it is necessary that construction industry should be into high value-added business lines using the measurement system because construction projects are increasing their complexity, variety and scale. But Performance measurement Systems that are most used around the world are subject to limitations for application on internal construction industry. This study addresses limitations of measurement system that is existing and proposes methodology for development of efficient Success Index system based on Critical Success Factors.

  • PDF

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

Public Infrastructure Practitioner's Recognition on Project Performance (공공토목공사 실무자의 성과요인 인식차이 분석)

  • Park, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.93-100
    • /
    • 2007
  • Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.

Wiki-based Interactive Electronic Technical Manuals (IETM) for Construction Project Management : Through a Case Study of Urban Regeneration Projects (Wiki기반 건설 사업관리 전자매뉴얼 : 도시환경정비사업 사례연구를 통해)

  • Park, Moon-Seo;Kang, Sung-Hoon;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.3-12
    • /
    • 2010
  • Recently, workers on construction sites can hardly understand their tasks and the process of the tasks because the construction projects are becoming large and complex. Due to the complexity, workers need a tool that can help them understand their works and some paper-based manuals exist to support them. However, the existing paperbased manuals are not actively used by workers due to the low credibility of information on the manual. In particular, paper-based manual can not be updated frequently because those manuals have to be manually updated by experts. Thus, the credibility of information is decreased and the decrease let the users distrust information of the paper-based manual. Therefore, this research analyzed the feature of wiki-based system and suggested an wiki-based IETM(Interactive Electronic Technical Manual) system model that can be modified by users, and then conducted a survey through a prototype based on urban regeneration project. The result of the survey indicated that wikibased IETM can improve the stakeholder communication by reinforcing the process of creating knowledge as well as knowledge itself.

Characteristics of the Duty of care of a Good Manager according to the Construction Manager's Task (건설사업관리자의 수행업무에 따른 선관주의의무 특성)

  • Chung, Young-Ho;Lee, Sang-Beom;Park, Hyun-Jung;Cho, Hyeong-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.36-43
    • /
    • 2012
  • When the construction management method was introduced, there were arguments regarding the contractual responsibility of the construction manager. Accordingly, the provisions on damage compensation in the Construction Technology Management Act were revised in 2002, and the obligatory duty of care of a good manager is now required by the Framework Act on the Construction Industry. Even though the construction manager has a responsibility of a consultant in the CM-for-fee contract, however, the Korean construction environment does not clearly specify the consultant's scope of responsibility. In this study, the theory about the duty of care, which is a consultant's responsibility among the expert's responsibilities, was arranged. Based on the responsibilities of experts such as lawyers, the duties of care of a good manager of the construction manager were presented to provide the foundation for establishing the construction manager's responsibilities. To verify the resulting items, interviews with experts were performed to assess their importance levels.

공공건설사업 CALS 구현 계획

  • 김승균;권오룡;김규수;유인채;신용재
    • Proceedings of the CALSEC Conference
    • /
    • 1997.11a
    • /
    • pp.207-235
    • /
    • 1997
  • $\bigcirc$ 국가적 정보화 추진정책으로, - 정보선진국 진입을 선언하고, 전자정부 선언에 따라 전자상거래법 제정을 준비중이며, - 정보화 10대 과제를 선정하여 추진중임. $\bigcirc$ 국내건설환경의 경쟁력 제고가 필요 - 성수대교, 삼풍사고 등으로 건설산업의 신뢰도가 저하되어, 기술경쟁력과 자본력에서 국제 경쟁력의 제고가 필요함. $\bigcirc$ 건설시장의 국제화 대비가 필요 - 국제 건설시장의 개방에 따른 경쟁력 강화가 시급하고, - 미국, 일본 등의 CALS체계 구축으로 건설사업의 정보화와, - 품질향상, 안정성 확보 및 비용절감을 통한 국내외 신뢰회복으로 건설수주의 확대가 절실함. $\bigcirc$ 21세기 고도 정보화 시대에 맞는 건설산업의 정보화 필요 - 건설산업의 선진화와 국제 경쟁력 강화를 위한 환경 조성 - 건설사업의 기획에서 유지보수 까지 전 과정 정보화 추진 - 발주처, 건설업체, 유관기관 등이 공유하는 건설정보지원 - 건설사업의 정보화와 건설업체, 발주처 등이 정보를 공유하는 건설CALS 체계 구축을 통한, - 건설산업 선진화와 국제경쟁력 강화 환경조성이 필요함.(중략)

  • PDF