• Title/Summary/Keyword: 건설사업관리 역량

Search Result 93, Processing Time 0.028 seconds

Developing Competency Model and Analyzing Competency Needs for Construction Manager in D Co., Ltd. (건설사업관리자 역량 모형 개발 및 역량 요구 분석: D사(社) 사례를 중심으로)

  • Kim, Dae-Young
    • Journal of vocational education research
    • /
    • v.33 no.3
    • /
    • pp.37-56
    • /
    • 2014
  • The purpose of this study was to develop a competency model and analyze the competency needs for construction manager in D Co., Ltd.. The delphi method of 25 excellent construction managers working in D Co., Ltd. was used to develop a competency model. The results showed that there would be a construction manager competency model which consisted of 3 competency clusters, 11 competencies, and 60 key actions. Then the survey of 114 construction managers working in D Co., Ltd. was conducted to examine concurrent construct validity of the competency model for construction manager and to analyze construction managers' competency needs by using the Borich's formula and the Locus for Focus Model(LfFM). The results showed that construction managers perceived 'communication', 'risk management', 'goal orientation', 'customer orientation', and 'project management' as top five priorities of competencies for construction managers. Based upon the above results, some implications were suggested for developing construction managers' competencies and improving their performance.

Analysis of Factors Affecting Job Competency of Quality Management for a Construction Manager (건설사업관리자의 품질관리 직무 역량에 영향을 미치는 요인 분석)

  • Jung, Seoyoung;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.65-73
    • /
    • 2017
  • Today, the United States, Europe and other advanced organizations are utilizing the concept of competency-based HR management. Recently, many organizations in Korea are also managing workforces by introducing the concept of job competencies in personnel management. However, in spite of the current trend, domestic human resources management methods for construction managers continues to operate by asking about work experience, licensing, education level, etc. This is a seniority system and it functions separately from an assessment of practical job competencies for the business. Moreover, construction management work has been very fragmented in terms of expertise and capacity depending on the type of management work and project progress. Therefore, it is necessary to develop a competencies management system for each business segment to effectively manage job competencies that reflect the the characteristics of a construction manager' s work. As such, the aim of this study is to analyze human resources management methods pertaining to domestic construction managers and present challenges and limitations in current practices. In particular, factors affecting the job competencies of construction managers are analyzed statistically. The results of this study will be used as the basis for future research into development of a construction manager competency management system.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.

An Analysis of Capability of CM at Risk in Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 역량분석)

  • Yoo, Seung-Kyu;Choi, Seok-In;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.85-94
    • /
    • 2009
  • For the purpose of analysing the capability (knowledge, experience, and ability) of CM at Risk in the major construction company in korea, this study performed questionnaire survey with experts in the companies. Based on the analysis of the survey, the study was found as follows. 1) It is needed to increase the capability of preconstruction services, such as project management plan/manual, contract documents, value engineering, alternative analysis, time management, and claim. 2) Despite of gap of the capability between the present and the future CM services, the study concluded that the capability is sufficient to perform CM at Risk project in the major construction company.

Evaluation of CM Capability based on Business Functions for International Plant Construction (해외 플랜트 건설사업관리 업무기능별 역량분석)

  • Ha, Jiwon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.3-15
    • /
    • 2014
  • Ever expanding overseas construction is one of the most important issues for Korean construction companies. Among these issues, strategies for overseas plant construction have widely been discussed, because the plant construction has features of low competitiveness and high ripple effects when compared with other construction sectors. In this sense, the purpose of this research is to evaluate the CM capability of Korean construction industry for overseas plant construction. Fourteen construction business functions and four techniques were defined first. Based on these functions and techniques, CM capability was quantified for As-Is (2013), To-Be (2018) and Gap analyses. Findings of this research reveal that 1) capability for construction is quite competent, 2) capabilities for planning, design management, contracting, and risk management are found to be relatively low, where higher value can be added. In addition, it is found that R&D needs to be extended to develop systemized management techniques. It is also required to secure specialists and original technologies at national industrial level.

A Study on the Factors for Strengthening Competitiveness of CM Projects based on Balanced Score Card (BSC기반 건설사업관리프로젝트 수주역량요인 연구)

  • Beak, Nak Kyu;Lee, Dong Heon;Lim, Hyoung Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.74-80
    • /
    • 2019
  • In domestic construction industry, CM companies perform overall project management tasks such as planning, designing, construction management, evaluation, maintenance for construction projects. However, even with these tasks, as competition becomes more fierce and probability dependence is high, lots of CM companies are experiencing difficulties of securing and preparing indicators for order competence reinforcement. This study examines domestic business condition and task analysis. Also Competence factors are derived through institutional and legal investigation, and review of existing literature. The derived competence factors are focused on practical factors by interviewing with experts. competence factors for each type were classified into BSC's four perspectives(Finance / Customers / Internal processes / Learning and Growth) and surveyed. Based on the results of the survey, the priorities of competence factors that companies should focus on were derived. The purpose of this study is to contribute on making an indicator that can be utilized on business activities through priority analysis of competence factors for order competitiveness reinforcement of CM companies.

An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer (초급 건설사업관리기술자(CMr)의 요구역량 추출 및 ANP 중요도 분석)

  • Yang, Jinkook;Kim, Sebeom;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.58-64
    • /
    • 2017
  • Construction Management (CM) is being utilized as an efficient project management system. Construction management system provide scientific management techniques as well as the expert's service with the expertise. Accordingly, CM services demand is continuously increasing in construction project. Construction Management engineer grade is distinguished by the Index of Construction Engineer's Competency (ICEC). Construction management engineer requires a higher score than the other fields. However, junior grade CM engineer can get grade according to the education and qualification. This study was conducted junior grade CM engineer depth interview after analyzing the problem of the current CM engineer grade system. As a result, this study was to extracted the 23 kind competence factors. And, competence factors were five area grouped using affinity diagram method. Next, we analyzed the importance utilizing the Analytic Network Process (ANP) technique. As a result, high priority areas were analyzed to be quality and cost areas associated with project management.

Quantification of a Global Construction Core Competencies for Korean Construction/Engineering Firms (국내 건설업체의 해외 진출역량 계량화 연구)

  • Kim, Sang-Bum;Kim, Yong-Bi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2541-2549
    • /
    • 2013
  • The Construction industry has been dealing with much trouble due to global economic recession and domestic political trends emphasizing on welfare than development. Consequently, domestic construction market has been dramatically shrunk during the last a few years, and international market has become the only potential solution for the industry. However, there has been lack of efforts in developing a quantified measure of global competencies for Korean engineering and construction organizations. This study attempted to develop quantified indices for Korean engineering and construction contractors with which the level of global construction competencies can be objectively monitored. In doing so, a survey questionnaire was developed to identify relative importances of core competency elements which were derived from extensive literature reviews and experts interviews. AHP (Analytic Hierarchy Process) was employed as a main analysis method in developing quantification measures. The analysis results reveal little differences in competency requirements between engineering and construction firms and it implies that the global market becomes more integrated and requires a total solution for a construction project. The developed core competency measures can be used to quantify the level of preparedness of Korean engineering and construction firms at the time of evaluation and also be used as a basis for performance benchmarking indicators if they are compared with business showings.

Analysis of Competency Assessment Using BSA for ODA Loan Construction Projects (BSA기법을 활용한 ODA건설사업 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.45-53
    • /
    • 2012
  • Recently, with achieved US$ 500 Billion international cumulative construction order, the Korean government presented overseas construction industry visions for international orders of US$ 100 Billion and entering the top five countries in global construction market. Also, Korean companies are developing strategies for expansion of international markets. However, ODA loan projects are low risk for the Korea Construction companies trying to advance their overseas business. This study provides data-based advice on securing competence for Korean construction companies entering the global market through the ODA loan projects. To analysis construction firm's competitiveness for ODA loan project, FGD was utilized and BSA model was applied to the valuable analysis. Competencies highly assessed were construction quality control, relationship building through high-level diplomatic activities, and project management. Competencies requiring urgent improvement were handling risks of local countries, financing projects, and developing know-how within participating companies.

Analyzing the ODA Construction Project Competence based on IPA (IPA 기반의 공적개발원조 건설사업 역량 분석)

  • Kim, Hwarang;Jung, Mincheol;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.66-72
    • /
    • 2021
  • Participation in official development assistance (ODA) construction projects can be proposed as a way to revitalize Korean small and medium-sized construction companies' entry into the overseas construction market. To this end, the necessary competency items were derived for the execution of the project, and a survey was conducted and an analysis of importance-current competency was performed. 24 out of a total of 32 competency items were analyzed as having a low level of competency compared to their importance, indicating that it is urgent to strengthen corporate-level capabilities for the smooth execution of related projects in the future. In detail, it is judged that it is necessary to seek to establish a preferential capacity-strengthening plan for contract management-related items such as the 'Construction-related fundamental laws, Contract management method, and International administration negotiation'.