• Title/Summary/Keyword: 건설사업관리(CM)

Search Result 225, Processing Time 0.028 seconds

The Selection Criteria of Delivery Method based on Project Characteristics;focused on the Multi-Housing Projects (프로젝트 특성에 따른 발주방식 선정기준;공동주택 건설 사업을 중심으로)

  • Moon, Hyun-Seok;Cho, Kyu-Man;Hyun, Chang-Teak;Koo, Gyo-Jin;Hong, Tae-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.390-395
    • /
    • 2006
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods (i..e, CM, DB, etc.). However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough project characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the model for selecting criteria of delivery method based on project characteristics in the Multi-housing projects.

  • PDF

A Case Study on Electronic Recognition Sensor for Underground Facility Management System (지중 매설물 이력 관리 시스템 개발을 위한 전자인식기의 현장 적용성 검증 연구)

  • Jung, YooSeok;Kim, Soullam;Kim, Byungkon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.777-785
    • /
    • 2021
  • Many utility lines are buried underground to provide various functions of the city. Because historical records are not managed systematically, damage has occurred during excavation. In addition, the demand for an underground facility management system is increasing as the aerial underground project is progressing. By attaching an electronic recognition sensor to an underground facility, such as pipelines, the management history and site conditions can be carefully managed. Therefore, in this study, electronic recognition sensors, such as BLE Beacon, UHF RFID, geomagnetic sensor, and commercial marker, were tested to analyze the strengths, weaknesses, and field applicability through a pilot project. According to the limited research results collected through two pilot projects, the installation depth is most important to demonstrate the performance of the electronic reader. In addition, because it should be used in urban areas, the influence of environmental interference should be minimized, and there should be no performance degradation over time. In the case of the geomagnetic recognizer, the effect of environmental interference was large, and performance degradation occurred over time using the BLE Beacon. In the field situation, where the installation depth can be controlled to less than 40cm, the utility of the battery-free UHF RFID was the best.

Factors Affecting the BIM Acceptance of Construction Managers (건설사업관리자의 BIM 수용에 영향을 미치는 요인 연구)

  • Chung, Yongche;Chin, Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.11-23
    • /
    • 2015
  • Construction Management(CM) and Building Information Management(BIM) have a lot in common that they need to establish a cooperation system among different disciplines and promote smooth communication among project stakeholders throughout the project life-cycle. BIM can be an effective information management tool for CM's business and improve their service value. However, BIM uses by Construction Managers(CMr) are very limited. The objective of this study is to analyze the intention of CMrs to adopt BIM and establish effective BIM use strategy in the CMr's point of view. This study utilizes Technology Acceptance Model(TAM) as a research method, and the results show that 1) CMrs think it is more important whether BIM is required to be adopted in their business process at the social or industry level than that BIM can improve their personal competence, recognition, and impressions through their voluntary BIM adoption; 2) that CMrs think it is important to figure out business processes where BIM can be smoothly incorporated; and 3) that CMrs hesitate the use and trial of BIM in their realworld business although they agree that BIM needs to be eventually adopted in their business in the future. Based on these results, directions for establish a strategy for BIM adoption were proposed at the CMr's point of view

Establishment of New Business Field in construction Management Business (건설관리사업(Construction Management)의 새로운 업역 구축에 관한 연구)

  • Jin, Hyun-Soo;Lee, Byeong-Hun;Kim, Kyung-Hoon;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.139-142
    • /
    • 2010
  • Owing to the deregulation, low interest, sufficient liquidity and etc., the real estate market has been recovered in some areas and some investment products to the degree being concerned about the overheating. In order that the construction and real estate industries, which play the considerable role in our economy, may be soundly grown toward contribution of the stable growth of our economy, it is being requested to acquire the transparency, predictability and trade stability of the international level conforming to the deregulation during the sale in lots of the building. For this reason, keeping pace with the trend of the construction industry and the current of the society, which are more and more large-scaled and globalized, it will be necessary to solve the social matters and to construct the more efficient and continuous construction management by widening and activating the field of CM through scheme of more specialized, sustainable and general CM method and establishment of new business bounded system in the construction management.

  • PDF

Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures (CM 전문회사 단장 활용실태 및 개선방안)

  • Son, Chang-Baek;Huh, Young-Ki;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.87-95
    • /
    • 2013
  • The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.

Process Model for 6 Sigma(${\sigma}$) in Construction Management(CM) (건설사업관리(CM)에서의 6시그마(${\sigma}$) 적용 조건 분석을 통한 추진 모델 구축)

  • Kim, Chan-Gyo;Lee, Jea-Sauk;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.478-482
    • /
    • 2006
  • The domestic enterprises in order to secure the freshness location of market from the international competition which is keen are propelling a price and a quality high position strategy steadily. It is put in competitive situation with the overseas enterprises and even from construction industry it follows in construction market opening and there is not another idea to the research the management strategies, directions and focus competitive elements of the enterprise against, what it sees consequently and to rise to the priority where the competitive power reinforcement of the enterprise is important, it becomes. Competitive power of like this enterprise for a reinforcement the technique which induces a big interest 6 Sigma is technique from the many companies. 6 sigma preceding researches of manufacturing and service industry the fact that it is accomplished with the object which will carry most. The research which relates with construction industry is staying to an introduction of 6 sigma the investigation phase, the actual introduction introduces and "S" construction there is not only a possibility against the application result of having a limit because it is applying. It is like that but like referring to a minute description for the international competitive power security which it follows in the change which market environment is sudden 6 sigma the introduction will judge, indispensability development of the logical propriety against hereupon and it will reach and it verifies the question investigation for to lead, 6 sigma of the construction companies it confirms the application possibility and presents the propulsion model as 6 sigma the fact that overcoming the limit characteristic of that introduction application as objective of sample research means it will do.

  • PDF

The Effect of PMIS Quality on Project Management Success (PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석)

  • Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2010
  • As one of the key IT applications, the project management information system (PMIS) has played a significant role in construction management processes. This is because PMIS is an information system that gathers, integrates, and disseminates the output of project management processes among project participants, and is used to support all aspects of a project, from initiation through closing. This paper aims to identify the CSFs(Critical Success Factor) of Project Management and quality associated with Project Management Information System (PMIS) in construction projects, to analyze the Effect of PMIS quality on Project Management Success. The CSFs of Project Management and the quality components for PMIS are identified through a review of the literature, and consolidated through interviews with professionals in the construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor), and 253 completed questionnaires were retrieved. To increase the applicability of the results, the respondents consisted of workers spread across various parts of the construction site. Using SPSS 12.0, the data was used to analyze the relationship between PMIS Quality and Project Management Success through multiple regression analysis. These findings help to clarify what the highly prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

A Suggestion of Blasting Patterns of a Mine closed to Railway Line for Securing Safety of High Speed Train (고속철도 안전확보를 위한 노선 인접 광산의 발파패턴 제안)

  • Kim, Hyun-Ki;Lee, Sung-Hyeok;Lee, Jin-Wook;Choi, Chan-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.5
    • /
    • pp.1-9
    • /
    • 2015
  • Recently Honam high-speed railroad line is constructed in southern part of Korea. This line is for next generation HST named HEMU-430X. But there is a limestone mine near this line and this mine will make a process to dig a passageway under the railway line. In this case, safety of railroad system and stability of mine are crucial problems on both sides. By measuring mine blasting vibration and calculating regression equation, effect of mine blasting to train running is investigated quantitatively. 0.5 kine (cm/sec) is applied as a management specification of vibration based on field measurement. In this study, changes of blasting patterns are suggested to control vibration of mine blasting. And the effect of train vibration to mine is also invesitigated by numerical analysis.

Entry strategy for global water market (해외시장 진출 활성화를 위한 제언)

  • Lee, Byoung Chul;Kim, Shang Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.115-115
    • /
    • 2015
  • 국내 물관련 건설 및 설비 업체를 대상으로 하는 설문조사 및 인터뷰 결과 국내 물 관련 기업들의 해외진출 시 가장 큰 애로사항은 해외경험 직원의 부족으로 나타났다. 해외사업 확대를 위해서는 고부가가치 업무를 수행할 수 있는 고급기술자와 관리 인력의 양성이 시급하며, 특히 건설사업관리(CM, PM)나 설계/엔지니어링을 담당할 고급 기술 인력의 양성이 필요한 것으로 조사되었다. 경쟁력있는 글로벌 기술 관리 인력의 양성은 정부의 주도하에 기존의 물 관련 기관의 교육프로그램 통합 운영 및 내실있는 전문 수자원 대학원 운영 등 장기적인 정책적인 지원이 필수적이다. 또한 현재 해외 물시장 정보 수집의 활성화를 위하여 국토교통부, K-water, 해외건설협회 등이 연계한 물 산업 전담 정보시스템 구축과 중점 수출대상국 선정 후 대상국에 해외지부 운영 등이 필요할 것이다. 금융지원과 관련하여 해외건설 금융지원 강화를 위한 글로벌 인프라펀드 조성, 해외건설 보증한도 확대 등이 필요하며, 'EDCF 등 공적금융의 물산업 지원 확대 등 재정지원을 위한 정부의 적극적인 역할 역시 중요하다. 해외 물시장 진출을 위해서는 국내 물기업들의 역량을 결집하는 것이 필요하며, 이를 위해서는 효율적인 공공 민간 협의체의 설립 및 운영이 이루어져야 한다. 전 세계적으로 물 산업은 높은 공공성과 함께토탈 솔루션 역량이 중시되고 있으며, 이런 시장환경에 부응하여 네덜란드, 독일 등 물산업 수출 강국은 자국의 물관련 분야를 결집하는 워터 파트너십을 설립하여 국제사회에서 위상과 세계시장 점유율을 동시에 높여가고 있는 실정이다. 이들 국가 워터파트너십의 공통적인 설립 목적은 궁극적으로 자국 물 관련 산업, 국가 브랜드 및 이니셔티브와 관련되는 국제협력, 정책 분야 등의 결집이다. 다시 말해서 정부가 주축이 되어 관 산 학 연 기관간의 정보제공, 협력 등을 도모하고 있으며 이 네트워크의 구심점 역할 및 촉진은 자국의 워터파트너십이 맡고 있는 것이다. 해외 물 시장 확대를 도모하고 있는 우리나라도 국가차원의 장기적이고 지속적인 해외 물산업 네트워크 구축을 위해서는 정부-공기업-민간기업 등의 협력을 토대로 한 Korea Water Partnership을 조속히 설립하는 것이 필요하다. 이를 위해서는 국토부, 환경부 등 물 관련 부처는 물론 글로벌 네트워크를 구축하고 있는 외교부, 무역협회 등 유관기관의 정보 연계 및 협조 체계 역시 필요하다. 정부부처 차원의 조직은 국제 정치 아젠다(agenda)에 중대한 영향을 줄 수 있으며, 경쟁적 우위와 유사기관 간의 정보와 네트워킹의 공유를 보다 원활하게 할 수 있기 때문이다. Korea Water Partnership에서는 한국이 보유하고 있는 선진 수자원기술 및 경험을 해외에 소개하고, 정부 및 민간 기업들의 물 산업 수출역량을 적극적으로 피력할 수 있는 기회를 마련하며, 국제사회에서 물 강국으로서 한국의 위상을 높일 수 있는 홍보 마케팅 창구로서의 역할을 기대할 수 있을 것이다.

  • PDF

Research Trends in Off-Site Construction Management : Review of Literature at the Operation Level (국외 오프사이트 건설 관리 연구 동향 : 작업 단계 수준에서의 문헌 연구)

  • Jang, JunYoung;Chen, Hao;Lee, Chansik;Kim, TaeWan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.114-125
    • /
    • 2019
  • Off-Site Construction (OSC) is a new construction method based on factory production. OSC (Off-Site Construction) is a new construction method based on factory production. Researches such as OSC-related design and production standardization, transport methods are actively conducted in the U.S., UK and other parts of the world as this new method has an edge over existing methods in terms of productivity, economy and quality. As the emergence of this new area requires reasonable management, an analysis of the scope of construction project management is required accordingly. Therefore, this research analyzed the study trends and relationships at the CM/PM range's "Operation level" to identify areas of study, relationship between studies and deficiencies in current research. This study carried out a comprehensive literature review of the OSC (CM/PM) research by analyzing 94 papers in Operation level as of September 3, 2018, and the analysis results are as follows. (1) Working stage level researches have been increasing rapidly since 2006. (2) Non-volumetric type is contributing most significantly at work stage level. In the building sector, it has been identified that problems such as residential: living, quality issues, non-residential: economic difficulties, factory: productivity problems have been addressed. (4) The Non-volumetric pre-assembly type dealt with the economic feasibility of residential and non-residential buildings, whereas the modular type was studied in regards to assembly quality. (5) From 2006, project management areas (e.g., quality, human resources, risks) have been expanded. It is expected that this research will help find new areas of research for OSC. If the analysis is carried out to the level of the industrial, corporate and project phases in the future, it is deemed that the overall research flow and area of the OSC industry can be identified.