• Title/Summary/Keyword: 건설관리프로세스

Search Result 573, Processing Time 0.023 seconds

A Study on the Maintenance System Module Design for the BTL Project Facilities : Focused on Educational Facilities (임대형 민자사업(BTL) 발주 시설물의 합리적 유지관리시스템 모듈 설계에 관한 연구 -교육시설물을 중심으로-)

  • Kim, Sang-Seok;Son, Jae-Ho;Lee, Seung-Hyun;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.702-707
    • /
    • 2008
  • BTL projects for educational facilities were conceived in 2005 to supply public facilities in a timely and efficient manner After the projects were completed in March 2007, proper facility maintenance has become an increasingly important issue. However, BTL projects are still in an early developmental stage, and the data on the maintenance and operation of such facilities are not yet available because the operation of the facilities has just begun. Accordingly, this study is conducted to derive maintenance processes and to specify maintenance items for the efficient maintenance of BTL educational facilities. Then, database on the maintenance processes will be created, and a maintenance system module will be designed.

  • PDF

A Study of the evaluating and improving methods on PMIS for performing strategy of construction company. (전략수행을 위한 PMIS 진단 및 개선방안)

  • Lim, Hyoung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.83-89
    • /
    • 2007
  • This study started with many experiences about maturity evaluation and efficiency improvement of Project Management information system, and need for IT systems for performing of strategy. The objective of this study is 1)to evaluate processes and IT systems based on CSF in strategy perform phase, 2)to propose method of sustainable evaluation and improvement, and 3)with KPI and CSF, to evaluate and improve PMIS. Moreover, we suggested IT architecture framework for basement of improving process and resources.

  • PDF

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

Modular Building Construction Process Development by Benchmarking International Best Practices (선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안)

  • Shin, HyunKyu;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.3-12
    • /
    • 2016
  • The purpose of this study is to provide a domestic applicable modular building construction process by benchmarking international best practices. In this study, we derive the risk factors that may occur in performing a modular construction projects and the modular construction management factors through case analysis. In order to effectively respond to risks in performing a modular building projects, we propose the modular building construction process which is separated by a transportation, lifting, assembly steps based on the unit module construction sequence. It is the key to providing management information and guidelines for the design, production, construction participants by reflecting the information for each step in the process. This study would prevent a potential hazard which may occur in the construction process. Consequently, It could result in saving the entire cost of modular construction project as shortening the project schedule and could improve workability of modular construction.

Analysis of the Procurement Management Process for the Gas & Oil Plant projects (Gas & Oil 플랜트 조달관리 프로세스 분석)

  • Won, Seo-Kyung;Kang, Min-Woo;Lee, Jun-Bok;Kim, Sun-Kuk;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.491-494
    • /
    • 2007
  • Recently Gas & Oil plant construction projects are increasing in the world. The EPC (Engineering, Procurement and Construction) company, which participate in the plant projects, should possess the pertinent engineering license and procurement skill to create high added-value. It is because the procurement is very substantial to cover 70% of the total project cost. Nonetheless, there exist various risks involved in the procurement process due to the characteristics of the construction projects with long duration and complicated process as well as the procured goods or services subjected to various logistics. The objective of this paper is to analyze proper process in the procurement and to identify various information and document. Also to analyze procurement process, the principal data are derived from the interview with experts and specialty contractors of plant project. The result of this study would widely be used as a guide to the procurement personnel in forecasting the risks in advance.

  • PDF

Design of Integration Process for JIT System in Construction Schedule Management (건설 공정관리에서의 적시생산을 위한 통합 프로세스 설계)

  • Jin You-Na;Lee Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.517-520
    • /
    • 2003
  • Recently there is a used a word-outsourcing-in the corporation circumstance. Continuous recession impelling with IMF permitted restructuring measures downsizing unnecessary organization and offered opportunity to breakup structure of 'High cost and Low efficiency' -inefficient and uneconomic production method- in our corporation. Due to the effect of such circumstance change, the construction industry have already introduced and implemented outsourcing in many parts. For successful outsourcing in the construction industry, a mutually close relations and the cooperation are preceded and JIT system is needed to improve these relations. The study recognizes the importance and proportion that outsourcing is occupyed in the construction industry, and suggests the method to improve the productivity by evaluating the factors and usefulness for JIT system to apply to the construction industry.

  • PDF

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

A Study of Introduction of CMMI on Design Process for Improving Collaboration (설계협업 프로세스의 개선을 위한 CMMI 도입 방안에 대한 연구)

  • Jun, Joon-Ki;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.436-440
    • /
    • 2008
  • Evaluating the work process of the organization is necessary to improve efficiency and make high quality of results. As size of construction projects are bigger, it is also applied to design firm. By applying efficient process, design team can reduce rework and waste. To make systematic process and keep a continuous progress, process evaluation is required. On this study, CMMI(Capability Maturity Model Integration) concept is benchmarked. Originally CMMI is suggested to evaluating capability of work process of Soft Ware developing organization by SEI(Software Engineering Institute). From CMMI system, direction of making evaluating method of design project performing team is drove. After worked out the evaluation method of capability maturity of process in design team, it could contribute making progress in the design process and satisfying client.

  • PDF

Waste Elimination in Construction Process using Value Stream Analysis - Focused on Waste Elimination of Re-bar Works (가치흐름 분석을 통한 건설프로세스의 낭비제거 방안)

  • Mun Jeong-Mun;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.416-421
    • /
    • 2001
  • The domestic reinforcement concrete works have mainly worked the process of re-bar fabrication/assembly on site and re-bar works affected by structural safety, durability, and schedule with form work. Accordingly, This study analyzes the process of re-bar fabrication/assembly on site to apply lean production principles to construction Value Stream Analysis(VSA) is analyzed into value-adding activity and non-value-adding activity on construction process through value analysis and Value Stream Mapping(VSM). In the results, non-value-adding activity generates waste such as the activity steps, labors, equipments, materials, time, and so on. Additionally, push-driven production is investigated making low productivity from the overproduction and so on. To resolve the problems in the process, The purpose of this paper eliminates waste factor through maximizing the value-adding activity generating value added and minimizing non-value adding activity. Particularly, it makes flow production and pull-driven production through minimizing work-in-process(WIP ).

  • PDF

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.