An Analysis of Best Practices for Efficient Utility Relocation and an Inquiry into the Applicability of SUE (효율적인 지하지장물 이설을 위한 모범사례분석 및 SUE 적용에 관한 연구)

  • Lee, Seung-Hyun;Baek, Seung-Ho;Tae, Yong-Ho;Ahn, Bang-Ryul;Park, Hyeon-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.971-976
    • /
    • 2007
  • In the U.S., utility damages or utility delay caused by conflicts during the underground utility relocation is one of the weighty problem in the construction industry. Also, in domestic case, delay and additional cost caused by underground utility(i.e, electricity, communication, gas, water supply and sewerage) relocation has been happened so that there is an increase of claims for responsibility between owners and contractors. However, there is insufficient survey for the recent circumstance of additional cost for delay and design changes caused by utility relocation and shortage of enough research for solving and analyzing of causes and their ripple effect. This research presents a result of the study about the best practices of FHWA(Federal Highway Administration), SHAs(State Highway Agencies) and the utility companies managing utility relocation. Also, it presents the basic concept of SUE(Subsurface Utility Engineering), the most reliable tool of FHWA presented, and investigates the developing status about SUE in Korea. At the end of this paper, this research proposes a practical and more applicable study about the efficient utility relocation focusing on local industry.

  • PDF

Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP - (시공단계 BIM 활용을 위한 모델 요구조건 체크리스트 개발 - MEP를 중심으로 -)

  • Kim, Woojin;Park, Jinho;Cha, Yongwoon;Hyun, Changtaek;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.22-31
    • /
    • 2019
  • The application of BIM that can manage and integrate information generated during the entire life cycle of buildings in domestic and overseas construction projects is becoming active. When BIM is utilized in the construction phase, it can shorten the construction period, reduce the occurrence of reworks and improve collaboration capability. However, there are limitations in applying BIM to the construction phase due to the insufficient definition level of domestic BIM guidelines and inadequate design standards. In this regard, this study developed BIM model requirements checklist for the application of BIM in the construction phase. To develop the checklists, 21 domestic and overseas BIM guidelines, three public construction projects and four private construction projects to which construction BIM was applied, were analyzed. Based on the guidelines and cases, a total of 62 construction BIM model requirements (31 model objects and 31 attribute rules) and proposed construction BIM model requirement checklists by dividing the 61 requirements according to the requirement and purpose for utilization were identified. It is expected that the practical applications of the checklists proposed in this study will improve the level of BIM model in construction phase. In addition, this study has its significance as a basic research that can be used in the development of standardized guidelines for BIM model in construction phase from academic aspects.

Development of Concrete Quality Inspection and Document Management System Using Mobile and Web Technologies (모바일 기술 및 웹을 활용한 콘크리트 품질시험 및 문서관리 시스템 개발)

  • Kim, Young-Suk;Lee, Jae-Kwon;Jung, Un-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.193-205
    • /
    • 2008
  • Quality is an important keyword representing the corporate competitiveness and image in today' s construction industry. Especially in concrete construction, any problems or defects in fresh concrete can significantly degrade the entire quality and performance of the facility built. Thus, adequate quality inspection and testing must be exercised over the fresh concrete, if concrete with the required strength, durability and appearance is to be obtained. The testing of concrete delivered to the construction job site involves testing of fresh concrete and performing strength tests on hardened concrete. The principal tests conducted on fresh concrete include the slump test and tests for air and salt content. The temperature of fresh concrete should be checked out hot or cold weather concreting. The 7-day and 28-day strength of hardened concrete are also determined by compression tests on usually cylinder samples. However, it is very complex and time-consuming process requiring a lot of efforts to document those on-site concrete testing results and to accumulate their historical data. The primary objective of this study is to suggest a unique PDA and web-based system which enables an on-site quality manager to effectively conduct the concrete inspection and testing, automatically document and accumulate the collected historical data, and promptly obtain the approval from supervisors. Finally, it is anticipated that the effective use of the proposed PDA and web-based system would be able to improve reliability of the concrete quality inspection and testing data as well as significantly reduce the approval process.

Modular Building Construction Process Development by Benchmarking International Best Practices (선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안)

  • Shin, HyunKyu;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.3-12
    • /
    • 2016
  • The purpose of this study is to provide a domestic applicable modular building construction process by benchmarking international best practices. In this study, we derive the risk factors that may occur in performing a modular construction projects and the modular construction management factors through case analysis. In order to effectively respond to risks in performing a modular building projects, we propose the modular building construction process which is separated by a transportation, lifting, assembly steps based on the unit module construction sequence. It is the key to providing management information and guidelines for the design, production, construction participants by reflecting the information for each step in the process. This study would prevent a potential hazard which may occur in the construction process. Consequently, It could result in saving the entire cost of modular construction project as shortening the project schedule and could improve workability of modular construction.

A Sensitivity Analysis for Risk Management of Private Investment Projects - Focused on BTL Projects - (민자유치사업의 리스크 관리를 위한 민감요인 분석 - BTL 사업을 중심으로 -)

  • Kim, Sun-Kuk;Park, Tong-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.168-175
    • /
    • 2006
  • Since the partly changed 'Private Investment Act for Social Infrastructure Projects' set forth in January 2005, the number of BTL(Build-Transfer-Lease) projects offered to the market has rapidly increased. The scope of BTL projects offered covers not only legally defined facilities but several facilities for the private schools. A BTL project, by definition, is a way of project management that includes the entire process of development such as planning, design, construction and operation over the period of 20-30 years. As a result, various types of risk may happen at each stage of the project and it is extremely important to efficiently control the sensitive factors that affect the risk profiles of the project. The examples of the sensitive factors are construction cost, interest rate, discount rate, lease amount, rental fee, O&M cost and so on. This study examines the characteristics of these sensitivity factors, analyzes their impact on the project feasibility and suggests the alternatives to manage them efficiently.

Operation Model of On-site Environmental Management Council to Enhance Eco-friendliness in Public Construction Sites (공공 건설현장의 친환경성 제고를 위한 현장환경관리협의회 운영 모델)

  • Sohn, Jeong-Rak;Park, Seong-Sik;Jun, Myoung-Hoon;Song, Sang-Hoon
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.423-431
    • /
    • 2012
  • The trends of Green growth and environmentally-friendliness came to be the key development indicator for sustaining global environment for the future. Korean government reflected these trends in the main flows of the national development index. Korean construction industry is concentrating investment on fields related to these trends such as technologies for carbon dioxide deduction, materials or products for environmentally-friendly building and alternative energy development, as well. However, efforts to follow these trends during the construction process as a step for production phrase are not being considered enough. In this study, we analysed current status and points to be improved of on-site environment management by surveying major project owners and representatives of the environmental affairs in the leading companies of those fields. Also, we suggested organizational structure and operation model as a solution for enhancing environmentally-friendliness for systematic approach to manage on-site environment in public construction sites. In addition to these solutions, further approaches such as shifting paradigm of project owners and contractors, securing workforce and practical budget for efficient management activities, developing environmental management manuals, setting standards for evaluation of activities are needed for the stable settlement of on-site environmental management.

A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects (시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구)

  • Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.159-166
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Verification Method for Quantity Takeoff Results of Concrete Works using Design Drawing Information (도면정보 기반 건축공사 콘크리트 물량산출 성과물 검증방안 개발)

  • Lim, Haejin;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.20-28
    • /
    • 2020
  • In construction project, an error in quantity information immediately leads to an error in the quotation, highly reliable quantity calculation is required for successful performance of a project. But there is a difficulty in the current situation for the person in charge to review all calculation sheets for quantity review as the quotation work has to be performed in a short period of time. Accordingly, it is thought that a review plan is required to secure reliability on calculated results and the review plan should be able to be carried out within insufficient quotation periods. In the present paper, it is intended to present a plan that enables quantity to be reviewed with the minimum number of persons within the shortest period of time through an algorithm of calculating a verification quantity. The suggested algorithm allows the result of quantity calculation work carried out earlier based on 2-dimensional drawing to be compared, not with an accurate quantity, but within an error range.

Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models (BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구)

  • Choi, Hyunjun;Yun, Seokheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.89-97
    • /
    • 2019
  • Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.

A Study on Competency Evaluation Checklist of Design Phase VE Team (설계VE팀의 역량평가 체크리스트에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.154-162
    • /
    • 2008
  • Ministry of construction and transportation has been enforcing extensionally design phase VE(Value Engineering) to the construction costing more than 10 billion won, an importance of design phase VE accordingly is raising to get rid of a waste of cost and noneffective factors previously in construction projects. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, present competency factors of design phase VE to highly raise the output through organizing an effective team at the beginning stage of design phase VE. Find out 29 competency factors through characteristics of design VE team for the check list, classify by team knowledge, team work skill, and team attitude. Get an efficiency regarding importance and find out Competency Evaluation items of design VE team, present a Competency Evaluation plan for indicating an objective standard to Competency Evaluation by measuring relative importance as to each Competency Evaluation item.