1 |
Ahn, S.C. (2014). Forward-Looking Probability and Statistics, 1st ed. HANBIT Academy Press, Seoul, pp. 223-303.
|
2 |
Choi, C.H., Han, C.H., and Lee, J. (2013). "An Effective Logistics Process Modeling for Plant Projects." Journal of Architectural Institue of Korea, AIK, 29(5), pp. 87-95.
|
3 |
Jeong, K.S., and Lim. N.G. (2013). "A basic study on the reduction of loss rate of the reinforcing steel and quantity using of object-oriented cad-based program." Journal of the Regional Association of Architectural Institute of Korea, AIK, 15(5), pp. 251-258.
|
4 |
Kang, K.I. (1998). Architectural Quantity Surveying, 1st ed. Gold Press, Seoul, pp. 13-208.
|
5 |
Kang, Y. (2008). "Understanding and Application Example of Delphi Technique." Korea Employment Agency for the Disabled, Frequent Task Report, 2008-20.
|
6 |
Kim, C.S. (2011). "A Study on the Modeling Method for Material Take-Off of BIM based Framework." MS thesis, Gyeongsang National Univ., Jinju.
|
7 |
Kim, H.S., Choi, J.S., and Kim, I.H. (2013). "A Methodology of Open BIM-Based Quantity Take-Off for Schematic Estimation of Frame Work in Super-Tall Buildings." Journal of the Architectural Institute of Korea Planning&Design, AIK, 29(5), pp. 31-38.
DOI
|
8 |
Land and Housing Institute of Korea (LH). (2017). Korea Land & Housing Corporation, Technical Report, 2017-00.
|
9 |
Lee, D.Y., Choi, C.H., Won, S.K., Cho, M.Y., Han, C.H., and Lee, J. (2016). "The Development of a Standardized Work Process for Planning for Planning of Plant Project - Focus on Excavating and Investing Participation Plan-." Korean Journal of Construction Engineering and Management, KICEM, 17(4), pp. 3-11.
DOI
|
10 |
Lee, H.S. (2014). "An improvement of the quantity take-off process for reducing errors during detailed design development of building projects." MS thesis, Chung-Ang Univ., Seoul.
|
11 |
Lee, M.K. (2011). "A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior." MS thesis, Sungkyunkwan Univ., Seoul.
|
12 |
Park, Y., and Lee, K.H. (2013). "Calculation of the Attached Piping Material Rate for Simplification of Estimation Work in Apartment with Individual Heating System." Journal of the Regional Association of Architectural Institute of Korea, AIK, 15(1), pp. 107-114.
|
13 |
Public Procurement Service (2018). Analysis of Construction Expenses Classified by Public Facilities, 1st ed. Kyung Sung Press, Daejeon, pp. 10-67.
|
14 |
Song, A.R., Kang, K.S., and Yun, S.H. (2015). "Improvement of Quantity Take-Off and BOQ Information through the PBS based QDB System." Journal of the Regional Association of Architectural Institute of Korea, AIK, 31(2), pp. 73-80.
|
15 |
Zen, Z.S. (2017). "Public Issues on Unfair Bidding - Focused on Period for Estimate and Estimated price." Journal of the European constitutional Law Association, EUC, 24, pp. 457-488.
|