• Title/Summary/Keyword: 개략공사비

Search Result 49, Processing Time 0.024 seconds

A Study on the Story Increase for Securing the Feasibility of Aged-Housing Remodeling (노후공동주택 리모델링의 사업성 확보를 위한 수직증축 제안)

  • Han, Ju-Yeon;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.152-159
    • /
    • 2012
  • Remodeling the existing building structure by recycling has great advantages compared with reconstruction in terms of environmentally contributions and reduced use of national resources. And no matter the existing floor area ratio, extension up to 30% of the exclusive using area and short project period have made remodeling a good alternative to reconstruction. However, the residents of aged housings that were being remodeled are either abandoning the remodeling project and turning to reconstruction. The main reason is remodeling project cannot increase the number of householders. In principal, it is prohibited to increase the number of floors during remodeling due to matters of safety. That is, all remodeling construction costs are borne by the residents, which leads to great financial pressure. Therefore, in order to improve these conditions, the residents' burden of remodeling charges should be reduced, and one of the ways to do so is to increase the number of householders. In this study, there will be suggestions of alternatives, including the story increase during remodeling, and compare the burden of remodeling charges on each of the residents, between proposed alternatives and the current remodeling plans by calculating the construction costs in order to prepare a foundation for a system that will promote remodeling.

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.

Efficient Evaluation Method of Operation Cost for Wastewater Treatment Plant by BTL Contract Type (하수처리시설 BTL사업의 합리적인 운영비 산정방안)

  • Kang, Leen Seok;Yoon, Sun MI;Kwon, Joong Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.627-634
    • /
    • 2009
  • The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.

State of the Art of Segment Lining in Shield Tunnel and Statistical Analysis of Its Key Design Parameters (쉴드터널 세그먼트 라이닝의 최신 기술동향과 핵심 설계항목의 통계 분석)

  • Chang, Soo-Ho;Lee, Gyu-Phil;Choi, Soon-Wook;Bae, Gyu-Jin
    • Tunnel and Underground Space
    • /
    • v.21 no.6
    • /
    • pp.427-438
    • /
    • 2011
  • Segment lining is a key permanent lining structure to maintain the shield tunnel stability in shield tunnel operation. Moreover, segment lining generally accounts for the largest proportion in the shield tunnel construction costs. As a result, technical improvements to increase its economic feasibility have been actively carried out. This study aims to propose the development directions of high-performance segments from their recent cutting technologies. In addition, based on over 2,100 world-widely collected segment design data, a series of statistical analyses of segment key design parameters such as thickness, width and the number of divisions as well as segment materials were carried out to approximately estimate them in a design stage.

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

Cost Allocation of River Water Quality Management Considering Development in Upper Basin and Total Pollution Load Management System (상류지역 개발과 오염총량관리제를 고려한 하천수질관리 비용분담 방안)

  • Yeo, Kyu-Dong;Kim, Gil-Ho;Jung, Young-Hun;Lee, Sang-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.822-822
    • /
    • 2012
  • 본 연구는 상류의 개발행위와 더불어 현재 수질관리의 기준이 되는 오염총량관리제를 대상으로 '규모의 경제'의 논리를 따른다는 가정 하에, 지자체간에 협조를 통해 비용을 절감하여 서로 혜택을 볼 수 있도록 상 하류 지자체와 중앙정부 등 관련 당사자들 간의 비용배분 방안을 도출하는 것을 목적으로 하였다. 이를 위해서 광주광역시에 위치한 평동산업단지와 영본B, 영본C를 대상으로 광주, 전남, 중앙정부를 이해당사자로 하여 협조적 상황 하에서 대상 비용배분 문제를 정의하였고, 협조적 게임이론에 근거한 SCRB법 및 샤플리법을 적용하여 비용배분 결과를 제시하였다. 우선 광주와 전남이 각각 삭감해야 할 오염량을 산정하고, 해당 삭감량 만큼 처리하기 위한 하수처리시설의 규모를 설정하였다. 또한 하수처리시설의 건설비와 하수관거 공사비, 유지관리비를 산정하였으며, 하수처리시설의 내용연수인 20년간의 총비용을 2010년 현재가치 기준으로 산정하였다. 상 하류 지자체가 공동으로 대처할 경우 20년간 총비용은 416,311.8 백만원, 개별로 대처할 경우 464,439.6 백만원이며, 공동 대처가 42,359.3 백만원이 절감되므로 양 지자체 모두 협조적 게임에 응할 기본배경은 성립되었다. SCRB법에 의한 지자체별 비용배분율을 산정 결과, 광주 74.24%, 전남 25.76%로 산정되었으며, 2001~2010년 하수도 세입현황을 기준으로 중앙정부의 지원 비율은 10년간 최소 23.98%, 평균 29.22%, 최대 34.17%로, 각각의 비율별로 중앙정부, 광주, 전남의 비용분담액을 도출하였다. 본 논문에서는 개략적으로 비용을 산정하였으나 오염총량관리 사업은 막대한 예산을 필요로 하기 때문에 실제로 두 지자체가 협조하여 비용배분을 하게 된다면 하수처리시설의 수질개선효과, 하수처리시설 위치선정, 사업비용 등을 세밀하게 분석해야 할 것이다. 본 논문은 오염총량관리제에서 제시하는 목표수질을 대상으로 하였으나, 지자체의 정책에 따라 친수활동 증대와 생태 자연환경 개선 등과 같은 수질개선에 따른 간접적인 효과를 고려하여 오염 총량관리제의 목표수질보다 더 나은 수질을 원할 수도 있을 것이다. 협조적 게임의 상황을 복잡하게 하여 해결 가능성이 낮아질 수 있으나, 수질개선에 의한 다양한 효과를 편익으로 산정할 수 있다면 이를 협조적 게임에 적용하여 전반적인 수질개선에 대한 지자체의 적극적 활동을 유도할 수도 있을 것이다.

  • PDF

Development of a Feasibility Evaluation Model for Apartment Remodeling with the Number of Households Increasing at the Preliminary Stage (노후공동주택 세대수증가형 리모델링 사업의 기획단계 사업성평가 모델 개발)

  • Koh, Won-kyung;Yoon, Jong-sik;Yu, Il-han;Shin, Dong-woo;Jung, Dae-woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.22-33
    • /
    • 2019
  • The government has steadily revised and developed laws and systems for activating remodeling of apartments in response to the problems of aged apartments. However, despite such efforts, remodeling has yet to be activated. For many reasons, this study noted that there were no tools for reasonable profitability judgements and decision making in the preliminary stages of the remodeling project. Thus, the feasibility evaluation model was developed. Generally, the profitability judgements are made after the conceptual design. However, decisions to drive remodeling projects are made at the preliminary stage. So a feasibility evaluation model is required at the preliminary stage. Accordingly, In this study, a feasibility evaluation model was developed for determining preliminary stage profitability. Construction costs, business expenses, financial expenses, and generally sales revenue were calculated using the initial available information and remodeling variables derived through the existing cases. Through this process, we developed an algorithm that can give an overview of the return on investment. In addition, the preliminary stage feasibility evaluation model developed was applied to three cases to verify the applicability of the model. Although applied in three cases, the difference between the model's forecast and actual case values is less than 5%, which is considered highly applicable. If cases are expanded in the future, it will be a useful tool that can be used in actual work. The feasibility evaluation model developed in this study will support decision making by union members, and if the model is applied in different regions, it will be expected to help local governments to understand the size of possible remodeling projects.