The Study of Quality Control in Engineering on the Turnkey Project(Focus on Change Orders at the Construction Phase) (턴키공사 설계품질관리에 관한 연구(시공단계의 설계변경을 중심으로))

  • Lee Yong-Jin;Lee Teck-Wn;Kim Jin-Young;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.58-66
    • /
    • 2001
  • Turnkey project, also called Design-Build project, has been expanding and diversifying its business into the Korean market. However, it has been experiencing numerous difficulties due to a large number of change orders on the public turnkey project. Change order during the construction phase impact on time deliveries, budget and quality on a turnkey project. In preparation for this, the government has to improve the awarding procedure and general conditions for turnkey projects. Contractors should also cooperate with their co-working partners and establish a standardized procedure, which provides change order control for efficient implementation on the construction site.

  • PDF

Correlation Analysis between Organization Conflict and Job Stress of Construction Manager in Construction Site (건설현장 건설사업관리기술자의 조직갈등과 직무스트레스 상관관계 분석)

  • An, Sung-Hoon;Bitamba, Bauma Frigeant
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.367-373
    • /
    • 2020
  • As the supervision in site is integrated into construction management, the organization's work is expanded, and the perspective and goals of the work have changed, so there is a high possibility that the conflict situation within the organization will increase. Organization conflict increase a job stress of workers, so it acts as a negative factor in deriving organizational performance. Therefore, the purpose of this study is to analyze the correlation between organization conflict and job stress of construction manager in construction site. As a result of the study, the organization conflict of the construction manager was generally low, and the job stress was also less than that of other area's workers. In addition, correlation analysis revealed that organization conflict and job stress were related. The results of this study may help to improve the organization structure in the construction management site organization.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Strategy Improvement of Construction Management in the Owner's View Point (발주처의 관점에서 바라본 토목사업 CM 제도 활성화 방안)

  • Lee, Sang-Ok;Park, Jin-Hong;Jang, Won-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.463-472
    • /
    • 2012
  • Exemplary contracts of construction management (CM) including highway projects have been carried out in the civil engineering area over the past ten years. However, practical and administrative challenges as transitional circumstances have been revealed in the different participants of supervision, inspection and construction management. Thus, it is important to internally overcome problems and negative perception encountered in civil engineering, and to promote the efficiencies in construction cost and quality. In addition, external efforts should be put to market opening, globalization, and technology development for competitiveness and high value industry. While it is critical to establish the concrete CM system by collaborating with various participants, proven architecture and system have not been provided because of incorrect measurement of CM accomplishment, overlap of responsibility between CM and supervision, and slow deployment in construction field. This paper analyzed the current CM practices and business environments, and presented the possible solutions for strategy improvement of CM in the owner's view point.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

A Study on the Post-Evaluation of Landscape Design Competition based on Ground Theory - Case of Gwanggyo Lake Park in Korea - (근거이론을 활용한 조경현상설계의 사후평가 - 광교호수공원을 사례로 -)

  • Hong, Youn-Soon;Park, Jae-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.92-102
    • /
    • 2016
  • While there have many completions of large parks recently under development, there has been a dearth of quality assessments. Studies focused on post-evaluation have been made to resolve this, but most of these are biased toward user satisfaction after completion and therefore behaviour analysis has limitations on solving problemsduring the actual design implementation processes. Therefore, this study examined the internal phenomenon and structure of the implementation process of design competition through the ground theory and microscopic independent perspective. As a result, maintaining the identity and differentiation of parks derived from the preserved design competition scheme contributed greatly to completeness and satisfaction. Outcomes were mainly caused by the trust of public officials as the ordering organization, the will of policy decision-makers, and the competence of operational enterprises, etc. Negative factors such as undermining the whole concept of the park and landscape occurred as external pressure and related subjects intruded on change design factors due to variations in social conditions. Additionally, illogical construction processes occurred, such as a reinvestigation of the budget for restoration after damaging on original landscape. There have been needs for the improvement of the work processing system. On balance, an interventional role is very important in the park construction process, especially the PA and operation committee in terms of maintaining the basic direction, landscape design supervision for detailed designs, and expert construction management on LA in terms of rational work management in the field. The study, using the microscopic perspective of the designer and ground theory, deliver significant meaning as an early study by suggesting alternative methods for the after-evaluation of large parks and structurally looking into main influence factors driven during the construction process.

Strategy for Various CM Applications based on Comparative Case Analysis (사례 비교분석을 통한 CM 적용 다양화 방안 - 발주자 특성 및 사업특성을 중심으로 -)

  • Kim, Namjoon;Jung, Youngsoo;Kang, Seunghee;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.10-17
    • /
    • 2016
  • Domestic CM market has continued to grow since the enactment of CM policies in 1996. In addition, future CM market is forecasted to have potential high growth. Therefore, it is necessary to apply various CM business models reflecting the owner's requirements and characteristics in order to improve in the CM industry and to strengthen the competitiveness in the overseas construction market. In this context, the purpose of this study is to suggest strategies of various CM applications based on comparison of 4 cases analyzed by 'business weight' and 'business depth' in terms of business function as well as by the types of 'CM market' and 'CM practice'. Result of this comparative analysis shows that each case presents differences in terms of type, business weight, and business depth of CM practice. However, domestic public CM services are currently being challenged to strengthen capability throughout the project life-cycle against the limitation of government's CM policies focused on the construction supervision. In order to address this problem, this study proposes the strategies of various CM applciations from several different perspectives

Improvement of CM Fee Estimation Criteria for Efficient CM Service (건설사업관리업무 효율화를 위한 대가 산출기준 개선방향)

  • Cho, Youngjun;Sung, Youngmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.105-112
    • /
    • 2019
  • As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.

Problems Analysis and Revitalization Plan of Urban Development Projects by the Land Readjustment Method (환지방식에 의한 도시개발사업의 문제분석 및 활성화대책)

  • Kim, Hyoung-Soo;Lee, Young-Dai;Lee, Jun-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.37-46
    • /
    • 2009
  • This research will focus on the public agencies, designers, supervisors, building cooperation, and contractor who involved in urban development plan. By understanding the complexity and the priorities in urban development process, all problems of the urban development projects can be solved or improved. These priorities are specified using AHP (Analytic Hierarchy Process). A questionnaire survey is employed to identify the problems of urban development process and the methods of revitalizing urban in this research. Through the survey, 35 issues are drawn out. Factor analysis technique is applied to extract the underlying interrelationships possibly existing. Using latent root criterion and varimax rotation method, 9 factors are extracted(by using 34 issues after deleting 1 issue less than 0.4 of factor loading) These 9 factors named as PIF (Problem Improvement Factor) consist of integration estimation (PIF1), cooperation operation capability (PIF2), contractor corporation capability (PIF3), capital for infrastructure investment (PIF4), misunderstanding of effective land use (PIF5), financial capability (PIF6), obscure goal of project (PIF7), shortage of cooperation expertise (PIFS), administrative procedures (PIF9). PIF 6 is the most important factor and PIF 1 is the most widely effective factor to succeed urban land development projects. It is recognized that administrative office is most responsible for PIF1 cooperation is most responsible for PIF2, 7, 8 and 9; contractors is most responsible for PIF3 and PIF6; administrative agencies is most responsible for PIF4; cooperation and consultants are responsible for PIF5. From findings in this study, some suggestions are proposed for the revitalization methods of urban development projects through the land readjustment method.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.