Browse > Article
http://dx.doi.org/10.6106/KJCEM.2016.17.1.010

Strategy for Various CM Applications based on Comparative Case Analysis  

Kim, Namjoon (Construction Cost Management Research Institute)
Jung, Youngsoo (College of Architecture, Myongji University)
Kang, Seunghee (College of Architecture, Myongji University)
Shin, Dongwoo (Department of Architecture, Ajou University)
Publication Information
Korean Journal of Construction Engineering and Management / v.17, no.1, 2016 , pp. 10-17 More about this Journal
Abstract
Domestic CM market has continued to grow since the enactment of CM policies in 1996. In addition, future CM market is forecasted to have potential high growth. Therefore, it is necessary to apply various CM business models reflecting the owner's requirements and characteristics in order to improve in the CM industry and to strengthen the competitiveness in the overseas construction market. In this context, the purpose of this study is to suggest strategies of various CM applications based on comparison of 4 cases analyzed by 'business weight' and 'business depth' in terms of business function as well as by the types of 'CM market' and 'CM practice'. Result of this comparative analysis shows that each case presents differences in terms of type, business weight, and business depth of CM practice. However, domestic public CM services are currently being challenged to strengthen capability throughout the project life-cycle against the limitation of government's CM policies focused on the construction supervision. In order to address this problem, this study proposes the strategies of various CM applciations from several different perspectives
Keywords
Various CM Applications; Case Comparative Analysis; CM Business Function; CM Market Types; CM Business Types;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 Cho, H., and Kang, K. (2001). "Analysis on Architect's CM Capability for Development of Expended Service CM. - Focused on Design Expended CM Model in Private Sector -" Journal of the Architectural Institute of Korea, 17(10), pp. 153-160.
2 Ha, J., and Jung, Y. (2014). "Evaluation of CM Capability based on Business Functions for International Plant Construction." Korean Journal of Construction Engineering and Management, KICEM, 15(6), pp. 3-15.   DOI
3 Jung, Y. and Gibson, G. E. (1999). "Planning for Computer Integrated Construction." Journal of Computing in Civil Engineering, ASCE, 13(4), pp. 217-225.   DOI
4 Jung, Y., Woo, S., Kang, S., and Lee, B. (2002). "Effect s of CM Contracts on the Management Technology in the Korean Construction Industry." Journal of The Korean Society of Civil Engineers, 22(3), pp. 483-495.
5 Jung, Y., Woo, S., Park, J., Kang, S., Lee, Y., and Lee, B. (2004). "Evaluation of the Owners' CM Functions." Korean Journal of Construction Engineering and Management, KICEM, 5(3), pp. 128-136.
6 Jung, Y., Joo, M. and Kim, H. (2011). "Project Management Information Systems for Construction Managers: Current constituents and future extensions", Proceedings of the 28th International Symposium on Automation and Robotics in Construction (ISARC 2011), Seoul, Korea, pp. 597-602.
7 Jung, Y., Shin, D., Kang, S., and Kim, N. (2014). "Growth Model for Korean CM Firms based on 2012 Statistics." Korean Journal of Construction Engineering and Management, KICEM, 15(6), pp. 92-104.
8 Kang, S., Jung, Y., Kim, N., and Shin, D. (2014). "Policies and Tasks for Improving Korean CM Industry." Korean Journal of Construction Engineering and Management, KICEM, 15(5), pp. 71-81.
9 Kim, S., Kim, J., Lee, Y., and Kim, J. (2007). "A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level." Proceedings of KICEM Annual Conference 2007, pp. 289-294.
10 Lee, B., Kim, D., Woo, S., and Jung, Y. (2001). "Determination of CM Cost in Korean Domestic Public Construction Project." Journal of The Korean Society of Civil Engineers, 21(5), pp. 725-735.
11 Park, H., Shin, K., Park, H., and Jung, Y. (2008). "A Study of the Future Strategy and Mission for the Stakeholders in Industry, Academy, and Government for the Revitalization of CM." Korean Journal of Construction Engineering and Management, KICEM, 9(6), pp. 244-256.