• 제목/요약/키워드: 'Performance evaluation

검색결과 17,848건 처리시간 0.039초

Energy Performance Evaluation of a New Commercial Building using Calibrated As-built Simulation with Monitoring Data (건물에너지 모니터링 및 시뮬레이션을 활용한 신축건물의 에너지성능평가)

  • Song, Su-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • 제20권3호
    • /
    • pp.155-166
    • /
    • 2008
  • The performance evaluation of a new building is becoming more important because efficient design alone is often not sufficient to deliver an efficient building. However, there is a lack of standard evaluation methods to measure the energy performance of a new construction that has Energy Conservation Design Measures(ECDMs). This study presents an enhanced method based on calibrated whole-building simulation for evaluating the energy performance of new commercial buildings and demonstrates its use using a case-study building, including: an Energy Use Index(EUI) comparison with sub-metered data and an evaluation of the performance of specific ECDMs. The use of this method has determined that the case-study building was shown to use approximately 47% less energy than the base-case building that has the same shape and function as the case-study building(i.e., calibrated as-built simulation mode]), but doesn't include the simulated ECDMs.

A Performance Evaluation Mode1 for Information Systems using the Balanced Scorecard and the Value Chain : A Case Study (BSC와 가치사슬을 이용한 정보시스템의 성과 측정 방법 : 제조업체 사례분석)

  • 최경현;김태균
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • 제27권2호
    • /
    • pp.63-79
    • /
    • 2002
  • During the last decade many enterprises spent a huge amount of money for investment on Information Technology (IT) & Information System (IS) to attain competitive advantage and to maximize their business performance by satisfying the various requirements of customers. Under such circumstances, methodologies for evaluating IT impact on business performance are very important issues for strategic decision making on investment. In this study, we propose a performance evaluation model that adopts the concept of the Balanced Scorecard (BSC) and the Value Chain to analyze the financial impact and non-financial impact of IT & IS at each critical work area. This model combines the 4 evaluation areas from BSC and 6 critical work areas from Value Chain and measures the Key Performance Indicator (HPI) and the effect of KPI. Also, we present a case study of which the evaluation model has been conducted on a major manufacturing company. finally. we address some important notes to improve the IT & IS performances in the real-world.

Development and Implementation of an Integrated Evaluation System for Continuous Maturity of IS Performance (정보화 수준 제고를 위한 통합평가 시스템 개발 및 적용)

  • Kim, Injoo;Leem, Choon Seong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • 제29권1호
    • /
    • pp.100-113
    • /
    • 2003
  • In order to improve business competency by the IS(Information Systems), every enterprise needs to evaluate the current level of IS performance and their utilization. The evaluation that measures the performance of enterprise information systems and diagnoses their effectiveness of business goals and efficiency of resources should represent the useful informations based on sustainable goal-oriented viewpoints to managers. This work develops an integrated evaluation system for continuous maturity of information systems performance, enabling enterprises to achieve their goals of information systems and related business strategies. The integrated evaluation system has been applied to performance measurement of information systems with a huge set of real data from domestic industries for three years, and proven reliable and practical.

A study on the mass production performance evaluation of servomotors for manufacturing robots (제조 로봇용 서보모터의 양산성능 평가 연구)

  • Ryu, K.H.;Lee, T.H.;Park, J.W.;Kwon, H.S.;Kang, B.S.
    • Journal of Drive and Control
    • /
    • 제19권4호
    • /
    • pp.91-96
    • /
    • 2022
  • The performance and reliability of foreign servomotors and domestic servomotors for manufacturing robots were compared and verified. The mass productivity was confirmed by satisfying the requirements of the demanding companies. The servomotor was designed in consideration of mass productivity while satisfying the requirements of the demanding company. It was mounted on a real robot to check its performance and reliability. To secure mass-production performance, we designed and manufactured easy-to-manufacture parts and jigs to manufacture servomotors and achieved the goal of the mass-production evaluation of servomotors through individual performance evaluation, robot mounting test evaluation, and supplementation.

COMPARISON OF THREE PCM PERFORMANCE EVALUATION SYSTEMS IN TAIWAN

  • Wen-der Yu ;Yen-ping Hsu
    • International conference on construction engineering and project management
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.719-724
    • /
    • 2005
  • It has been debating on the performance evaluation of professional construction management (PCM) services since its introduction to Taiwan's construction industry more than a decade ago. Several evaluation systems were proposed by previous researchers. However, there has no comparison study been conducted for the feasibility, effectiveness, and appropriateness of these systems to the performance management (PM) of practical PCM services. This paper is intended for this end to compare the existing PCM performance evaluation systems in Taiwan. A real world design/build (D/B) building project was selected for case study. The result of case study concludes and compares the pro's and con's of the three systems. At the end, it recommends strategies for selecting the most appropriate PCM performance evaluation for PCM services.

  • PDF

A Study on Integrated Quality Evaluation Model of Information System (정보시스템 종합품질평가 모형 연구)

  • Seo, Jang-Hoon;Lee, Gi-Jun;Park, Myeong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • 제8권4호
    • /
    • pp.151-166
    • /
    • 2006
  • One of The standard issue in riding on the wave of the information system(IS) is records of performance, grow unprecedently fast, and has highly uncertain future. Within the framework of IS Evaluation, The main purpose of this study is to suggest performance quality evaluation system as follows, The Integrated Quality Evaluation Model Design(IQEMD) of Information System helps corporations to improve productivity, customer service and corporate competitive power. To respond flexibly this trend, we have to realize that the information system has to keep the most effective optimal information network at the proper time. The existing evaluation method has been concentrated on the evaluation of a degree of the information system maturity focused on static viewpoints. The evaluation of potential factors to affect the future-oriented performance, that can analyze both unit business being able to apply an information system base was used efficiently well and what performance evaluation item was obtained actually, was insufficient relatively. In this paper, An integrated quality evaluation method will analyze a degree of information system maturity in dynamic evaluation viewpoints rather than in static evaluation viewpoints. finally we estimated the relative degree of importance of each determinant using the AHP methodology The validity of the proposed model was also partially proved using two different methods, holistic and historical approach.

A Study on the Awareness and Interest Level of the Performance Evaluation Book List in Middle and High School Students (교과별 수행평가 도서목록에 대한 중고교생들의 인식 및 관심 수준에 관한 연구)

  • Park, Si-Yun;Noh, Dong-Jo
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • 제29권3호
    • /
    • pp.229-244
    • /
    • 2018
  • The purpose of this study is investigate the level of awareness and interest of middle and high school students on performance evaluation book list, and regarding the correlation analysis of general satisfaction and academic achievement. For this purpose, each of the two middle schools and high schools in Seoul were selected, a total of 200 people were surveyed for each 50 students in each gender and grade. Research results, First, the analysis of gender and school level showed that there were differences in level of interest in performance evaluation books. Second, the analysis of differences in the level of interest in the list of performance evaluation books showed that students interested in the list of performance evaluation books spend more time evaluating performance. Third, the analysis of differences in level of awareness in the list of performance evaluation books showed that the relationship between knowledge acquisition and academic achievement was high depending on whether they were ware. There was also a significant relationship between selection criteria and general satisfaction.

Performance Evaluation of Compressor to Develop 500W Class Ultra-Micro Gas Turbine (500W급 초소형 가스터빈 개발을 위한 압축기 성능 평가)

  • Seo, JeongMin;Park, Jun Young;Choi, Bum Seok;Park, Moo Ryong
    • The KSFM Journal of Fluid Machinery
    • /
    • 제15권6호
    • /
    • pp.51-57
    • /
    • 2012
  • Performance evaluation of a compressor is conducted to develop 500W class ultra-micro gas turbine (UMGT) for power generation. The performance evaluation is essential to check the performance of the components of UMGT, a radial turbine, a centrifugal compressor, an angular combustor and a shaft, which have been already designed in previous researches. The purpose of this study is to introduce the development process of the performance testing equipments of the UMGT and to present the results of compressor performance test. For the performance evaluation of the compressor, two test equipments are developed and the initial test equipment uses commercial static air bearings with long shaft. In the improved test equipment, static air bearing is improved to increase rotating speed and compressed nitrogen gas is used for utility gas of the static air bearing to supply compressed air in a stable and steady way. To increase rotating speed to 320,000 rpm, 80% speed of design speed, compressed air is provided to the turbine. The performance map of the compressor with the 50%, 60%, 70%, 80% speed of design point is presented. The results of the performance test of compressor show a good agreement with the results of 3D CFD.

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • 제25권6_2호
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

Development of Evaluation Items and Measurement Indices for Knowledge Management Performance of Government-funded Research Institutes (정부출연연구소의 지식관리 성과 평가항목 및 측정지표 개발)

  • Jung, Taik-Yeong;Kim, Sang-Hoon;Park, Il-Kyu;Kim, Chang-Kyu
    • Journal of Information Technology Services
    • /
    • 제10권4호
    • /
    • pp.171-189
    • /
    • 2011
  • KAs information and knowledge are increasingly becoming more important in the knowledge-driven society, knowledge management, as a very important management paradigm, is securing firm position in private and public sectors. Complying with this paradigm, government-funded research institutes in science-technology sector are actively utilizing knowledge management by employing knowledge management system and evaluating its applications' performance. The purpose of this study is to develop evaluation items and measurement indices to rationally measure knowledge management performance of the government-funded research institutes and to verify the feasibility of applying these evaluation items and indices. To achieve this research goal, the evaluation model of knowledge management performance was constructed by reviewing and integrating the existing studies, and subsequently, evaluation areas, evaluation items, measurement indices were derived from this evaluation model. Also, the feasibility analysis on the evaluation items and measurement indices was performed by means of FGI(Focus Group Interview) with the knowledge management experts belonging to Korean government-funded institutions in science-technology sector. The implications of this study are as follows : in theoretical perspective, this study has proposed a criterion frame to evaluate knowledge management performance, and has rationally drawn evaluation items and measurement indices from the criterion frame. And in practical perspective, this study has improved the validity and practicality of the measurement indices, which can lead to more reasonable and easier evaluation of knowledge management performance of the government-funded research institutes.