An Analysis of Construction Execution Tasks for Successful Residential Mechanical Projects (프로젝트 성공을 위한 효과적인 시공업무 및 영향 분석 - 아파트 설비공사를 중심으로 -)

  • Kang, Sang-Hun;Kim, Dae Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.60-67
    • /
    • 2019
  • The main purpose of this study is to identify the tasks performed at the construction stage of apartment houses and analyze the major construction tasks that may affect the performance indicators and analyze the impact on project performance. Based on expert opinions through preliminary research, pilot data, construction database, and other research trends, domestic and foreign research trends are divided into five major tasks, and each is divided into process management (P'1 ~ P'6), construction management (C'1 ~ C'5), environmental management (E'1 ~ E'4), quality control (Q'1 ~ Q'5), safety management (S'1 ~ S'5). Subsequently, each major task was subdivided into 24 detailed tasks. An independent t-test was conducted to analyze the impact on cost. We compared the importance of achieving the project goal and identified the construction work of concrete important construction which affects not only the cost but also the schedule performance index for the degree of significance of less than 0.05.

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects (공동주택 설비공사 계획업무의 성과지표에 미치는 영향분석)

  • Kim, Dae Young;Lim, Hyoungchul;Kim, Daeyoung;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.31-38
    • /
    • 2019
  • The main purpose of this study is to analyze the impact of the cost estimates on the construction work in residential apartment housing facilities. The planning work of facility construction is roughly divided into five main tasks which are further broken down into the following: process plan (P1-P6), construction plan (C1-C5), environmental management plan (E1-E4), quality management plan (Q1-Q5) and the safety management plan (S1-S5). In this study these tasks were classified into 25 detailed planning duties and a statistical analysis was performed on each one to determine its impact on cost. Finally this study derives from major planning tasks for effective cost management through correlation between planning tasks, cost indicators and t-test.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

A Genetic Algorithm Based Task Scheduling for Cloud Computing with Fuzzy logic

  • Singh, Avtar;Dutta, Kamlesh
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.2 no.6
    • /
    • pp.367-372
    • /
    • 2013
  • Cloud computing technology has been developing at an increasing expansion rate. Today most of firms are using this technology, making improving the quality of service one of the most important issues. To achieve this, the system must operate efficiently with less idle time and without deteriorating the customer satisfaction. This paper focuses on enhancing the efficiency of a conventional Genetic Algorithm (GA) for task scheduling in cloud computing using Fuzzy Logic (FL). This study collected a group of task schedules and assessed the quality of each task schedule with the user expectation. The work iterates the best scheduling order genetic operations to make the optimal task schedule. General GA takes considerable time to find the correct scheduling order when all the fitness function parameters are the same. GA is an intuitive approach for solving problems because it covers all possible aspects of the problem. When this approach is combined with fuzzy logic (FL), it behaves like a human brain as a problem solver from an existing database (Memory). The present scheme compares GA with and without FL. Using FL, the proposed system at a 100, 400 and 1000 sample size*5 gave 70%, 57% and 47% better improvement in the task time compared to GA.

  • PDF

A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Characteristics of VOCs Emission According Interior Finish Materials and Working Phases of New Apartments (신축 아파트의 실내 마감재 변경 및 시공단계별 휘발성유기화합물 발생 특성)

  • Pang, Seung-Ki;Cho, Woo-Jin;Sohn, Jang-Yeul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.6
    • /
    • pp.486-492
    • /
    • 2006
  • In this research, IAQ is measured to evaluate the emission performance of VOCs in three new apartment houses finished by totally EFMs (Environmental Friendly Material), partially installed EFMs and general materials. Among various VOCs, Target pollutants for the IAQ measurement are benzene, ethylbenzene, toluene, xylene, 1,4-Dichlorobenzene and formaldehyde. The measurement is conducted one day after each interior finishing material is worked over by construction schedule. The result of this research concluded that (1) Except toluene, the concentration levels of each pollutant did not exceed the national IAQ standards in all test residences, (2) As the interior finishing work schedule, A toluene level peaked when the furniture installing was ended. (3) The toluene concentration level of the house installed general interior materials as the non-EFMs furniture was one and half higher than other houses. Consequently, installing. the furniture made by EFMs is one of effective methods to improve the IAQ for new apartment houses.

Effect of Ingested Caffeine on the Sleep Quality among Shift Workers (교대근무자의 카페인 섭취가 수면의 질에 미치는 영향)

  • Kim, Hyesung;Lee, Jong-Eun
    • Korean Journal of Occupational Health Nursing
    • /
    • v.29 no.4
    • /
    • pp.306-315
    • /
    • 2020
  • Purpose: This study was conducted to identify the effects of caffeine intake by shift workers on sleep, considering various variable related to the sleep health of shift workers. Methods: A descriptive survey study was conducted with 128 employees who worked shifts. Respondents were surveyed on their of caffeine intake behavior, schedule type, quality of sleep, health promotion behavior, and occupational stress. Differences in their quality of sleep were assessed using the t-test and analysis of variance, while factors influencing the effect of caffeine intake on the quality of sleep were analyzed using hierarchical logistic regression. Results: The average Pittsburgh Sleep Index, Korean Version score of those surveyed was 7.3±3.25, indicating that their quality of sleep was low. On the other hand, their aveage daily intake of caffeine was 1.6±0.99 cups (1 cup =150 mL) and 116.4±77.58 mg/dL of caffeine. When the various variables that could have affected the quality of sleep were corrected, an increase in the amount of caffeine consumed was found to lead to a decrease in the quality of sleep (p=.015). Conclusion: Caffeine intake by shift workers has a significant bearing on their quality of sleep; therefore, such intake should be adjusted to improve their sleep health.

A Study on Preventive Maintenance of Container Cranes (컨테이너 크레인의 예방정비 일정에 관한 연구)

  • Yun, Won-Young;Son, Bum-Shin;Choi, Yong-Seok
    • Journal of Navigation and Port Research
    • /
    • v.33 no.6
    • /
    • pp.429-436
    • /
    • 2009
  • Container cranes are main equipments to load and unload containers to container ships at container terminals. If a crane breakdowns, it can reduce the productivity of container terminals. This paper deals with Preventive Maintenance (PM) schedules for the container cranes. The cranes consist of many parts and we analyze the structure of a container crane using the tree models. Next, we apply a Genetic Algorithm (GA) for determining optimal PM schedule and evaluate the performance of the proposed method through simulation system Finally, we explain how to adjust the PM schedule found in industry based on work schedules.