• Title/Summary/Keyword: tunnel construction cost

Search Result 171, Processing Time 0.043 seconds

MORDERN METHODS FOR TUNNEL (지하철 터널 굴착공법)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.14 no.3
    • /
    • pp.9-21
    • /
    • 1981
  • The rationalization for Tunnel Drifting is based on the high productivity which is achievable due to Continuous work with a Jumbo Drill, resulting in a much higher efficiency them the Conventional method of blasting, mucking and supporting services. Large projects of over 4,000m Tunnel Drifting are condidated to justify the use of a Jumbo Drill with a combination of superior explosives, machinery and techniques. During a Tunnel Drifting test, Gulita, Nabit and slurry made by Nitro Nobel were employed with following results. 1, Conditions: a. Granite Rock with Two free face b. Burden (W), 2m c. Diameter of hole, 42mm d. Depth of hole 3.5m e. Hole pitch 0.6m f. Charged Explosive per hole Gelatin Dynamite 4 pieces (112.5${\times}$4ea)+Guuita 5 pieces(110g${\times}$5ea) g. Simal-taneous Detonation h. After the blasting resultant rock size was Less 40% of the 0.3m Lumps. 2. Calculation results W=q/Wn=100cm‥‥‥Burden in simultaneous blasting 0.865kg(7.7ea)/hole ‥‥‥Amount of charge but hole pitch is 1.5W-2W The estimated cost of using a Jumbo Drill for the Construction of a 3,000,000 bbL sub-surface oil storage would be as follows: This calculation is based on the Jumbo Drill advancing 3.6m per blasting cycle. Unit cost/bbL Excavation $3.13 The attached sheet shows ideal Drilling pattern with Burn Cut & Smooth blasting method. In conclusion, it is my opinion that this method will assure safety and save cost and improve our technical know-how.

  • PDF

An Application of Safety Management for Tunnel Construction Using RTLS Technology (RTLS기술을 이용한 터널공사현장의 실시간 안전관리 적용방안)

  • Kim, Dae-Won;Moon, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.12-20
    • /
    • 2011
  • Recently, construction site scale has been growing larger along with the growth of national economy. As construction market requires time reduction, cost saving, and improving quality, a cutting-edge technology applied research has been gradually studied for more efficient project management. In particular, the Real Time Location System (RTLS) technology, a real-time location tracking system of construction resources, can be effectively used in safety management. This technology has been studied and applied in various industries including architectural, marine, urban, and other industries. However, although tunnel construction in civil engineering has a narrow space and many safety risks, there are not researched about this content. Therefore, this study proposes an advanced safety management model for tunnel construction using the RTLS technology and a measurement method of the feasibility of this model in the construction site.

Mapping Submarine Bathymetry and Geological Structure Using the Lineament Analysis Method

  • Kwon, O-Il;Baek, Yong;Kim, Jinhwan
    • The Journal of Engineering Geology
    • /
    • v.24 no.4
    • /
    • pp.455-461
    • /
    • 2014
  • The Honam-Jeju, Korea-Japan, and Korea-China subsea tunnel construction projects have drawn significant attention since the early 2000s. These subsea tunnels are much deeper than most existing natural shallow sea tunnels linking coastal areas. Thus, the need for developing new technologies for the site selection and construction of deep subsea tunnels has recently emerged, with the launch of a research project titled "Development of Key Subsea Tunnelling Technology" in 2013. A component of this research, an analysis of deep subsea geological structure, is currently underway. A ground investigation, such as a borehole or geophysical investigation, is generally carried out for tunnel design. However, when investigating a potential site for a deep subsea tunnel, borehole drilling requires equipment at the scale of offshore oil drilling. The huge cost of such an undertaking has raised the urgent need for methods to indirectly assess the local geological structure as much as possible to limit the need for repeated borehole investigations. This study introduces an indirect approach for assessing the geological structure of the seafloor through a submarine bathymetry analysis. The ultimate goal here is to develop an automated approach to the analysis of submarine geological structures, which may prove useful in the selection of future deep subsea tunnel sites.

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro Power Plants

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Korean Journal of Hydrosciences
    • /
    • v.3
    • /
    • pp.81-96
    • /
    • 1992
  • This study represents the methodology for feasibility analysis of small hydro power SHP plant. Cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP candidate site. The perfomance prediction model and construction cost estimation model for tunnel-type SHP plant were developed. Eight tunnel -type SHP candidate sites existing on Han-river were selected and surveyed for actual site reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrate with the lowest unit generation cost for tunel-type SHP candidate site were the flowrate concerming with between 20% and 30% of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual averageload factor, annual electricity production were estimated and discussed for eight surveyed SHP candidate sites.

  • PDF

The Evaluation of Structural Stability of Corrugated Steel Plate Method applied in High-Speed Railway Vertical Tunnel Structures (고속철도 수직구 터널구조물에 적용된 파형강판공법의 구조적 안정성 검토)

  • Chung, Jee-Seung;Shin, Hwa-Cheol;Kim, Jin-Gu
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.64-69
    • /
    • 2016
  • In this paper, structural analysis of High-Speed railway vertical tunnel structures was performed to verify the structural stability. The corrugated steel plate method was applied to the vertical tunnel structures for its simple construction method and low cost. The structural stability of Wall, Connection and Storage section was performed with LRFD and ASD design method at joint part, buckling, stress and plastic hinge. From the results, all of vertical tunnel structures shown the structural stability regardless of design method and structure types. So, the application of corrugated steel plate in vertical tunnel structures instead of cast-in-placed concrete was quite enough.

A Characteristic Behavior of the Roadbeds of Slab Track with the Cyclic Loading (반복하중재하시의 슬래브궤도 노반의 거동특성)

  • 이성혁;이진욱;최찬용;황선근
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.381-386
    • /
    • 2001
  • In many countries the slab track of railroads is mostly applied on the railroad bridges and tunnels, however it hasn't been constructed in the tunnel in Korea. Presently the Korea high speed railway construction authority is planning to construct slab track in the tunnels to minimize the cost of maintenance and repair. In this study, dynamic characteristics of the railroad roadbed which was constructed using crushed stones obtained from tunnel construction was investigated through the field investigation, real scale model test and numerical analysis. As a conclusion, the roadbeds built with the crushed stones produced at the tunneling site satisfy the requirement of roadbed in terms of displacement and earth pressure for the slab track in tile tunnel.

  • PDF

An experimental study on the effect of deterioration of drainage system on tunnel structures (배수시스템 수리기능저하가 터널구조물에 미치는 영향에 대한 실험적 연구)

  • Kwon, Oh-Yeob;Shin, Jong-Ho;Yang, Yu-Hong;Joo, Eun-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.970-979
    • /
    • 2006
  • Construction of underground structure requires higher standard of planning and design specifications than in surface construction. However, high construction cost and difficult working environment limit design level and construction quality. One of the most sensitive factors to be considered are infiltration and external pore-water pressures. Development of pore-water pressure may accelerate leakage and cause deterioration of the lining. In this paper, the development of pore-water pressure and its potential effect on the linings are investigated using physical model tests. A simple physical equipment model with well-defined hydraulic boundary conditions was devised. The deterioration procedure was simulated by controlling both the permeability of filters and flowrate. Development of pore-water pressure was monitored on the lining using pore pressure measurement cells. Test results identified the mechanim of pore-water pressure development on the tunnel lining which is the effect of deterioration of drainage system. The laboratory tests were simulated using coupled numerical method, and shown that the deterioration mechanism can be reproduced using coupled numerical modelling method.

  • PDF

Electronic Blasting for Excavating Single Line Railway Tunnel Close to Residential Area (보안물건이 근접한 소단면 철도 단선터널 굴착시 전자발파 시공사례)

  • Lee, Min Su;Kim, Hee Do
    • Explosives and Blasting
    • /
    • v.34 no.3
    • /
    • pp.17-20
    • /
    • 2016
  • This paper introduce a multistage parallel non-vibration electronic tunnel blasting cases which adapts Electronic Blasting System(EBS) and the center-cut blasting method to excavating a single line railway tunnel close to residential area. As a result, it was revealed that the vibration and noise showed a reduction of 23.5% and 75% of compared with the allowable standard. We successfully completed the tunnel excavation with decreasing construction time and construction cost and without civil compliant.

A study on the improvement in decision making analysis for the selection of tunnel construction method (터널건설공법 선정을 위한 의사결정기법의 개선방안 연구)

  • Park, Jun-Kyung;Jun, Sung-Kwon;Kim, Young-Keun;Heo, Eun-Nyeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.4
    • /
    • pp.261-276
    • /
    • 2002
  • Recently, for the purpose of choosing reasonable and economical construction, the decision making analyses, such as VE (Value Engineering) and LCC (Life Cycle Cost), are generally performed. But, these methods have some limitations for the application to subway tunnel construction method. So, the AHP (Analytical Hierarchy Process) analysis is applied to determine relative importance for obtaining objectivity in quantitative analysis. And, the LCSC (Life Cycle Social Cost) method is developed to account for the social loss and risk by tunnel construction. From the case of the subway ${\bigcirc}{\bigcirc}$ lot, those methods are very useful to decision making analysis. And, in that case, both quantitative and quantitative analysis appraisement, the drilling and blasting method is evaluated useful alternative proposal in comparing with the cut and cover method.

  • PDF