Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

Feasibility Analysis for the Introduction of Safety Certification System for Assembled Temporary Equipment and Materials (조립된 가설기자재 안전인증제도 도입의 타당성 분석)

  • Jeong, Seong Choon;Kwon, Jun Hyuk;Won, Jeong Hun;Kwon, Yong Jun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.32-42
    • /
    • 2020
  • In this study, in order to secure the necessity of introducing the safety certification system for the assembled temporary equipment and materials, the feasibility of the introduction was analyzed through literature review, structural analysis, and actual experiments and surveys related to the assembled temporary equipment and materials. In the previous studies, it was found that the research on the assembled temporary equipment and materials was insufficient, and it was possible to grasp the necessity of introducing the safety certification system for the assembled temporary equipment and materials. In addition, in the results of the serious accident analysis, it was found that the soundness of the temporary equipment and materials is determined by the structural characteristics after it was assembled. As a result of the feasibility analysis of the introduction of the safety certification of the assembled temporary equipment and materials through structural analysis, it is possible to effectively and rationally reflect the main geometrical influence factors, and to introduce the safety certification system that can test the procedures and procedures of the assembled temporary equipment and materials and based on it. It was found that there is a need. As a result of feasibility analysis on the necessity of introducing the safety certification system for assembled temporary equipment and materials through actual experiments, the existing single member performance evaluation has limitations in evaluating the structural performance of the assembled temporary equipment and materials. It was found that there is a need to introduce a safety certification system. As a result of gathering opinions on the feasibility of introducing the safety certification system for assembled temporary equipment and materials of manufacturers and users through the survey, it was found that the overall positive response result was high and the effectiveness was high.

The Application of KOESWall System as a Temporary Structure (임시구조물로서 분리형 보강토 옹벽의 적용사레)

  • 김영윤
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.09a
    • /
    • pp.53-58
    • /
    • 2000
  • The KOESWall system that minimizes the horizontal deformation of reinforced wall effectively was developed bt E&S Eng. Co., Ltd. in 1999. Due to its systematical feature i.e. isolated construction method. KOESWall system is able to use as temporary structures more economically without the facing block. In this report, it is shown that the case history of KOESWall as a temporary soil retaining structure and the field measuremnets.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

A Study on the Prevention and Extinguishment of Fire in Vinyl Temporary Buildings for Agriculture and Fishery (농·어업용 Vinyl 가설건축물의 화재 예방 및 진압에 관한 연구)

  • Bong-Woo Lee;Kyong-Jin Park
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.4_2
    • /
    • pp.599-603
    • /
    • 2023
  • Analyzed in the NFDS, The average number of fires in vinyl temporary buildings is more than 1,000 in annually. And the number of deaths and injuries was around 30 people in every year. According to the National Fire Agency, There are 142,386 vinyl temporary buildings for Agriculture and Fishery, of which 4,720 are residential vinyl temporary buildings in illegally. Model house is subject to regulation in fire-related law. But, even though it's the same temporary building, Vinyl temporary building is not subject to regulation. For this reason, Vinyl temporary buildings are left in the blind spot of fire safety. Therefore, In this study, We propose that amend of Act on installation and management of firefighting systems, make of temporary fire safety controller, develop and apply of alarm system that is connected to a single-alarm smoke dretector, organize and operate volunteer fire brigade of the crop group to prevent and extinguish the fire.

The Performance Analysis to Identify the Reuse and Assembly Impact of Temporary Equipment

  • Bae, Sung-Jae;Park, Jun-Beom;Kim, Jung-Yeol;Kim, Young-Suk;Kim, Jun-Sang;Jo, Jae-Hun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1252-1252
    • /
    • 2022
  • Temporary work that utilizes temporary equipment (e.g., system scaffold and system pipe support) in construction work is one of the most vulnerable work from a safety perspective in South Korea. Typically, temporary equipment is reused at construction sites. The Korea Occupational Safety and Health Agency announced guidelines regarding the performance standards for reusable temporary equipment to prevent the accidental collapse of temporary facilities. Nevertheless, temporary facilities' collapse still occurs, which could be attributed to a degradation in the performance due to the reuse of temporary equipment. Therefore, this study investigated the performance of simple temporary structures assembled with new and reused equipment. To this end, an experimental module was designed based on previous research cases, and two experimental models were constructed, in which one was assembled using new equipment (Model A), and the other was built using reused equipment (Model B). To determine the performance of each model, a load test was conducted to measure the maximum load that each model could withstand. The experimental results revealed that the maximum load of Model B was 15% lower than that of Model A. This indicates that there is a meaningful performance difference between those two models. Based on this result, the authors decided to perform additional tests with more realistic models than previous ones. The new experimental module was designed to ensure compliance with the Korean design guidelines. In this presentation, the authors show details of the first tests and their results and plan for the additional test.

  • PDF

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

Buckling Design of Temporary Bridges Subjected to Both Bending and Compression (압축과 휨을 동시에 받는 가교량 주요부재의 좌굴설계)

  • So Byoung-Hoon;Kyung Yong-Soo;Bang Jin-Hwan;Kim Moon-Young
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.977-984
    • /
    • 2006
  • Generally main girders and steel piers of temporary bridges form the steel rahmen structure. In this study, the rational stability design procedure for main members of temporary bridges is presented using 3D system buckling analysis and second-order elastic analysis. 2 types of temporary bridges, which are possible to be designed and fabricated in reality, are chosen and the buckling design for them is performed considering load combinations of dead and live loads, thermal load, and wind load. Effective buckling length of steel piers, effects of live loads on effective length of main members, transition of ~id buckling modes, and effects of second-order analysis are investigated through case study of 2 temporary bridges.

  • PDF

The Classification Plan on Safety Certification System of Temporary Equipment (건설 가설재의 안전인증 분류방안)

  • Park, Sang-Wook;Park, Jun-Mo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.794-799
    • /
    • 2008
  • At the point of changing from the capacity qualification of temporary equipments for building to safety certification system, the meaning of qualification and the present state of main products are evaluated for Capacity qualification system and compare with related system in developed country. These suggest classification of temporary equipments for building construction in safety certification. Now, present state of the capacity qualification system is estimated; according to the reforming system from restating law in 2003, there are a lot of changing of application in every 3 years because of that. The ability of Making business is improved by checking again but, there are limitation to constantly keep the safety as the system to approve form about sent imitation products. Changing from the capacity qualification system to safely certification system make to include the structure of the qualification system and make a plan standard. It make least panic in the building market and set up some standards for capacity by changing building circumstance. The classification of temporary equipment for building construction in safety certification from the module of quotation form classify each duty quotation item, self-regulation safely verification item and option quotation item, these will more improve the system form and quality of temporary equipment for building than before.

  • PDF

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.