Form Follows Function - The Composite Construction and Mixed Structures in Modern Tall Buildings

  • Peng, Liu
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.191-198
    • /
    • 2014
  • The tall building and super tall building has been a common building type in China, with multiple functions and complex geometry. Composite construction is broadly used in tall building structures and constitutes the mixed structure together with concrete and steel constructions. The mixture of the constructions is purposely designed for specific area based on the analysis results to achieve the best cost-effectiveness. New types of composite construction are conceived of by engineers for columns and walls. Material distribution is more flexible and innovative in the structural level and member level. However the reliability of computer model analysis should be verified carefully. Further researches in the design and build of composite construction are necessary to ensure the success of its application. Composite or Mixture Index is suggested to be used as a performance benchmark.

Formwork System Selection Model for Tall Building Construction Using the Adaboost Algorithm

  • Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.523-529
    • /
    • 2011
  • In a tall building construction with reinforced concrete structures, the selection of an appropriate formwork system is a crucial factor for the success of the project. Thus, selecting an appropriate formwork system affects the entire construction duration and cost, as well as subsequent construction activities. However, in practice, the selection of an appropriate formwork system has depended mainly on the intuitive and subjective opinion of working level employees with restricted experience. Therefore, in this study, a formwork system selection model using the Adaboost algorithm is proposed to support the selection of a formwork system that is suitable for the construction site conditions. To validate the applicability of the proposed model, the selection models Adaboost and ANN were both applied to actual case data of tall building construction in Korea. The Adaboost model showed slightly better accuracy than that of the ANN model. The Adaboost model can assist engineers to determine the appropriate formwork system at the inception of future projects.

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

Comparative Analysis of Lifting Loads of Tower Cranes by Core Structure Construction Methods

  • Choi, Yong Seok;Kim, Taehoon;Kim, Sangdae
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.3
    • /
    • pp.301-306
    • /
    • 2020
  • In tall building construction, the appropriate control of lifting loads on tower cranes is critical in terms of the construction duration of structural works. The adoption of efficient construction methods can be the most effective way of minimizing the inputs of tower cranes and making a lifting plan and management easier. Based on actual data from a tall building project, this study comparatively analyzes lifting loads of tower cranes by the core structure preceding construction method (CSPCM) and the core structure succeeding construction method (CSSCM). The results revealed that the CSSCM could reduce up to about 56.3% of lifting loads for core works and significantly enhance lifting efficiency compared with the CSPCM. Consequently, this enabled a substantial reduction in the construction duration of structural works. This study provides a practical reference to assist engineers and managers in applying efficient construction methods and lifting equipment operation in tall building projects.

A Study on the Typological Classification of Super-tall Building and Present State of Masterplan Planning Factor in the Site (초고층건축물의 유형화와 부지 내 배치계획요소 계획현황에 관한 연구)

  • Yang, Ki In;Bang, Ki Jin;Je, Hae Seong
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.71-76
    • /
    • 2010
  • Recently, the construction and plan of super-tall building is attention link of new town development or urban core regeneration. Super-tall Buildings have many advantages and a lot of affects in urban contexts. Also, construction of super-tall building is will be able to social problem like urban core's decline, loss of openspace, incompatible urban scape, traffic congestion of urban core. But, compares to super-tall buildings affects in urban contexts, there was not extra ordinary study about super-tall building by the urban scale approaches. Therefore, need about study materplan planning of the site which is made to meet super-tall building and urban contexts. There are two main processes in this study. First, to analyze the factors affect to masterplan planning of the super-tall building's site. Through the analyzed factors, classify type of super-tall buildings and identify the type's state. Second, to classify and set the elements of masterplan planning factor in the site. Identify the masterplan planning factor's state by deployment materplan planning factor set the current applied to the constructed super-tall buildings. Through this process, identified the recent trend and providied the basic elements of materplan planning of super-tall building's site.

Optimization Model of Table Form dismantlement Sequence for Reducing Formwork Duration in Tall Building Construction (초고층 거푸집 공사 공기 단축을 위한 테이블폼 해체 순서 최적화 모델)

  • Nam, Chulu;Kwon, Jaebeom;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.196-197
    • /
    • 2015
  • In tall building construction, time for transporting form affects formwork duration as plan size has become larger and quantity of inputted form has been increased. Thus, necessity of systematic dismantlement sequence of form has been increased to reduce the duration of formwork. Tabu search has been efficiently applied to solve problem of combinatorial optimization by using tabu list which can improve combination values. Therefore, this study proposes optimization model of dismantlement sequence of table form which has been preferred in tall building construction, to reduce the formwork duration by minimizing time for transporting form.

  • PDF

Effect of the building envelope on heating and cooling load in super tall building considering the meteorological changes with height (높이별 기상변화를 고려한 초고층 건축물의 외피종류별 냉난방 부하특성 분석)

  • Choi, Jong-Kyu;Kim, Yang-Soo;Song, Doo-Sam
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.337-344
    • /
    • 2012
  • Today, the number of super tall buildings are under construction or being planed in Middle East and Asian Countries. For example the burj Khalifa, the tallest building in the world, is completed in 2008 and the height of that is about 800m. Also, Lotte World Tower is under construction in Korea. External environmental conditions such as wind speed, air temperature, humidity and solar radiation around the super tall building differs according to the building height due to the vertical micro climate change. However, the meteorological information used for AC design of building is obtained typically from standard surface meterological station data(~2m above the ground). In this paper the effect of the building envelope on heating and cooling load in super tall building considering the meteorological changes with height was analyzed with simulation method. As results of this research, the guideline to select the building envelop alternatives for super tall building will be suggested in this paper.

  • PDF

A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building (초고층 골조공사 생산성 향상을 위한 작업 프로세스 개선)

  • Jang Ji-Sun;Shin Yoon-Seok;Kang Kyoung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.161-164
    • /
    • 2005
  • According to the trend of tail building, it is essential to improve productivity in tall building construction. However, the study on that is insufficient until now. Therefore, the purpose of this study is to propose a new work process of efficient concrete structural fame work to improve productivity in tall building construction. The results of being applied proposed work process are that the 5day cycle time of concrete structural frame work is cut by 0.5day and the quantity of rebar to be demanded in concrete structural frame work is reduced.

  • PDF

Comparison of Domestic and International Green Building Certification Criteria for Application of Environmental Characteristics in Tall Buildings (초고층 건축물의 환경적 특성 반영을 위한 국내.외 친환경 건축물 인증제도 비교.분석)

  • Cha, Min-Soo;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.247-251
    • /
    • 2010
  • Recently due to the crisis of environment and resources, construction industry that effect a lot on nature than any other industries is essentially required to consider environmental element through the life cycle. Lots of advanced countries and Korea have already been running green building certification systems. However, GBCC(Green Building Certification Criteria) in Korea is lack of assessment criteria that apply environmental characteristics of tall building in compared with that in advanced countries. To improve the problem, we compared GBCC with LEED(Leadership in Energy and Environmental Design) through the case study. This study provides preliminary data for reflecting environmental characteristics of tall building in GBCC.

  • PDF

The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction (초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구)

  • Lee, Dongyoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF