1 |
Ahn, B.J. (2004). "An analysis of planning practice for reinforced concrete core-wall construction in high-rise building construction." Kor. J. Constr. Eng. Manage., 5(2), 194-201.
|
2 |
Cho, H.W., Yoon, J.E., Kim, G.H., and Kang, K.I. (2004). "Optimization of time and cost for concrete structural frame work in high-rise buildings: by changing number of slab form sets and concrete strength", J. Archit. Inst. Kor., 20(7), 143-150.
|
3 |
Choi, Y.S., Lim, I., Kim, T., Cho, H., and Kang, K.I. (2016). "Case study of the core structure succeeding method for tall building construction", J. Constr. Eng. Manage., 142(12), 05016017.
DOI
|
4 |
Kim, G.D. and Lee, J.H. (2016). "Key technologies for super tall building construction: Lotte world tower", Int. J. High-rise Build., 5(3), 205-211.
DOI
|
5 |
Zhang, K., Wang H., Wang, K., Cui, J., Chen, B., and Li, D. (2018). "Significant progress in construction equipment of super high-rise building", Int. J. High-rise Build., 7(3), 243-253.
DOI
|