LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won (College of Architecture & Civil Engineering, Kyung Hee University) ;
  • Choong-hee Han (College of Architecture & Civil Engineering, Kyung Hee University) ;
  • Junbok Lee (College of Architecture & Civil Engineering, Kyung Hee University)
  • Published : 2009.05.27

Abstract

The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

Keywords

Acknowledgement

The authors express their sincere gratitude for Samsung Construction Company and its staff for the provision of expert advice and useful data for successful completion of this study.