• Title/Summary/Keyword: supply risk

Search Result 593, Processing Time 0.027 seconds

The Impact of BCMS Risk Assessment on Business Performance (BCMS의 위험평가가 경영성과에 미치는 영향)

  • Jang, Geun-Young;Kim, Deok-ho;Cheung, Chong-Soo
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.81-96
    • /
    • 2021
  • Purpose: Based on the preceding studies in supply chain management, factors were analyzed to verify the effect of risk assessment and risk management factors of the business continuity management system (BCMS) on management performance. The purpose of this study is to establish a systematic risk management plan by deriving the risk factors of BCMS and evaluating unpredictable risks, and at the same time, contributing to a company's competitive advantage without interruption of work. Method: The structural relationship between risk assessment, risk management and management performance of BCMS was derived. To this end, a questionnaire survey was conducted of 124 managers and managers in Korean companies. Frequency analysis, validity analysis, reliability analysis, correlation analysis, and simple regression analysis were performed. Result: First, risk assessment had a positive (+) effect on risk management. Second, risk management had a positive (+) effect on management performance. Finally, risk assessment had a positive (+) effect on management performance. Conclusion: BCMS's risk assessment and risk management capabilities should be managed through financial performance, and risk management activities should be managed through non-financial performance.

Production and Remanufacturing Planning under Uncertain Supply of Recovery Cores and a Disassemble-to-order Environment (재생품 공급량이 불확실한 주문시분해 환경에서의 생산 및 재제조 계획)

  • Kang, Changmuk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.38 no.2
    • /
    • pp.43-63
    • /
    • 2013
  • Remanufacturing is a process of recovering end-of-life products into serviceable parts for producing new products. Due to the limited supply of recovery cores to remanufacture, a remanufacturing firm also needs to produce or procure new parts for fulfilling the demand. This paper is targeted for solving the problem of determining the optimal amount of newly produced and remanufacturing parts, which is called production and remanufacturing planning (PRP) problem, under uncertain supply of recovery cores. The new production mitigates the risk of insufficient core supply while it takes more costs than the remanufacturing. The PRP model in this paper also considers disassemble-to-order (DTO) environment, in which multiple kinds of parts are remanufactured from multiple products on order of the parts. Whereas existing studies presents only heuristic solutions for DTO remanufacturing, this paper provides an exact solution for this problem and analytical sensitivity of the involved cost parameters, adopting multi-dimensional newsvendor modeling and stochastic linear programming techniques. The result shows that production and remanufacturing plans for multiple products are mutually dependent, and a change of cost parameters involved in only one part is propagated to all other parts.

Risk analysis of red water and turbid water based on seasonal water usage (계절별 수도사용량에 따른 적수 및 탁수발생 위험도 분석)

  • Han, Jin Woo;Lee, Sang Mok;Kwon, Hyuk Jae
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.7
    • /
    • pp.451-460
    • /
    • 2023
  • In this study, the risk of red water and turbid water occurrence was analyzed by classifying it into detachment risk and deposition risk. First, risk factors for red water and turbid water were determined, and hydraulic analysis was conducted considering seasonal water consumption. The applied area was Cheongju City, and the risk analysis was conducted across 13 areas, and the areas with high deposition risk and high detachment risk were selected. The high risk of both detachment and deposition can be judged as an area with a very high probability of causing water quality problems. The areas with the highest deposition risk and detachment risk are the old towns of Nae deok1-dong and Yul1yang-dong, which are the oldest areas in Cheongju City with an age of more than 30 service years of pipe installation. By analyzing the risk of deposition and detachment, it will be possible to strengthen the maintenance function of the water supply network to provide the safe water to citizens and increase their confidence for tap water.

CGE 모형을 이용한 다목적댐 운영의 경제파급효과분석: 용수공급기능을 중심으로

  • Jeong, Gi-Ho;Kim, Jae-Hyeon
    • Environmental and Resource Economics Review
    • /
    • v.21 no.1
    • /
    • pp.129-156
    • /
    • 2012
  • This study analyzes the contribution to the national economy of the stable water supply through managing multi-purpose dam. For the analysis, we consider 17 major multi-purpose dams and build a CGE model with summer water and winter water being the production factors as the base year of 2007. We analyze the economic impact of meeting water demand due to the dam management and estimate the risk premium of reducing the uncertainty of water supply. The analysis results show a significant production decrease in the industries of agriculture, forestry and fisheries and tap water as well as the food and beverage industry using the former industries' output as intermediates in the production and show an production increase largely in steel industry and electronic and electrical industries. Being compared to the benchmark solution, GNP is analyzed as being reduced by 0.22~0.68%. Meanwhile, the risk premium is estimated to be about 4 billion to 24 billion won for the value 01 the measure of relative risk aversion in the range 01 0.5 to 3.0.

  • PDF

Analysis of the Applicability of Flood Risk Indices According to Flood Damage Types (홍수피해유형별 홍수 위험 지수 적용성 분석)

  • Kim, Myojeong;Kim, Gwangseob
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.1
    • /
    • pp.29-39
    • /
    • 2018
  • In this study, the applicabilities of flood risk indices using FVI from IPCC, PSR method from OECD, and DPSIR method from EEA, were analyzed. Normalized values of daily maximum rainfall, hourly maximum rainfall, ten minute maximum rainfall, annual precipitation, total days of heavy rainfall (more than 80mm/day), density of population, density of asset, DEM, road statistics, river maintenance ratio, reservoir capacity, supply ratio of water supply and sewerage, and pumping capacity were constructed from 2000 to 2015 for nationwide 113 watersheds, to estimate flood risk indices. The estimated indices were compared to 4 different types of flood damage such as the number of casualties, damage area, the amount of flood damage, and flood frequency. The relationships between flood indices and different flood damage types demonstrated that the flood index using the PSR method shows better results for the amount of flood damage, the number of casualties and damage area, and the flood index using the DPSIR method shows better results for flood frequency.

A Study on Safety Analysis of Stationary LPG - Mobile Hydrogen Complex Refueling Station (LPG 복합 이동식 수소충전소 안전성 분석에 관한 연구)

  • Kim, Piljong;Kang, Seungkyu;Yoo, Myoungjong;Huh, Yunsil
    • Journal of Energy Engineering
    • /
    • v.28 no.4
    • /
    • pp.48-60
    • /
    • 2019
  • After the Paris Agreement in 2015, the government has been promoting various policies such as 'Hydrogen-Economy Roadmap(2019)' to supply hydrogen. As part of this, the government announced the goal of building 310 hydrogen refueling stations(HRS) until 2022. To this end, special case standard for the introduction of complex, packaged, and mobile hydrogen refueling stations(MHRS) have been enacted and promulgated. The MHRS has the advantage of being able to supply hydrogen to multiple regions. However, due to the movement and close distance between facilities, it is necessary to secure proper installation standards and operational safety through safety analysis. In this study, the possibility of introduction was investigated by designing a standard model and quantitative risk assessment(QRA). As a result of QRA, personal and social risk were acceptable, and the empirical test direction and implications were derived.

Effect of Change of Reactor Coolant Injection Method on Risk at Loss of Coolant Accident due to Beam Tube Rupture (빔튜브파단 냉각재상실사고시 원자로냉각수 보충방법 변경이 리스크에 미치는 영향)

  • Lee, Yoon-Hwan;Lee, Byeonghee;Jang, Seung-Cheol
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.4
    • /
    • pp.129-138
    • /
    • 2022
  • A new method for injecting cooling water into the Korean research reactor (KRR) in the event of beam tube rupture is proposed in this paper. Moreover, the research evaluates the risk to the reactor core in terms of core damage frequency (CDF). The proposed method maintains the cooling water in the chimney at a certain level in the tank to prevent nuclear fuel damage solely by gravitational coolant feeding from the emergency water supply system (EWSS). This technique does not require sump recirculation operations described in the current procedure for resolving beam tube accidents. The reduction in the risk to the core in the event of beam tube rupture that can be achieved by the proposed change in the cooling water injection design is quantified as follows. 1) The total CDF of the KRR for the proposed design change is approximately 4.17E-06/yr, which is 8.4% lower than the CDF of the current design (4.55E-06/yr). 2) The CDF for beam tube rupture is 7.10E-08/yr, which represents an 84.1% decrease compared with that of the current design (4.49E-07/yr). In addition to this quantitative reduction in risk, the modified cooling water injection design maintains a supply of pure coolant to the EWSS tank. This means that the reactor does not require decontamination after an accident. Thermal hydraulic analysis proves that the water level in the reactor pool does not cause damage to the nuclear fuel cladding after beam tube rupture. This is because the amount of water in the chimney can be regulated by the EWSS function. The EWSS supplies emergency water to the reactor core to compensate for the evaporation of coolant in the core, thus allowing water to cover the fuel assemblies in the reactor core over a sufficient amount of time.

Feasibility Study of Multi-regional Transmission Main Stabilization for Sustainable Water Supply (수돗물 공급 안정화를 위한 광역상수도 관로 안정화 타당성 연구)

  • Lee, Jae Bum;Yi, Choong Sung;Jung, Kwan Sue
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.3
    • /
    • pp.395-404
    • /
    • 2013
  • The risk of pipe-bursting in multi-regional transmission mains consisting of 89 % of singled pipeline is so high that pipeline stabilization project is required such as renewal and replacement, pipe paralleling, emergency ties. Pipeline stabilization projects could be postponed at the step of initial decision-making because effect of this project is intangible benefit like activation of economic, improvement of welfare related to water. This study is to suggest quantified economical feasibility model for intangible benefit presumption to solve above problem. Cost reduction of emergency water supply, leakage, burst restore and energy efficiency improvement was altered and applied. As a result of economic analysis taking into account estimated benefit and cost under discount rate 5.5 %, service life 40 years, sufficient economic feasibility analyzed with B/C 2.45, NPV 317,700 million won, IRR 9.09 %.

Study on the Safe Evacuation Management in a Power Supply Disturbed Emergency

  • Suzuki, Nobuyuki;OHASHI, Tsubasa;WHORLOW, James R
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.87-91
    • /
    • 2015
  • For construction projects it is imperative that site management gives the highest priority to planning safe site evacuation for all foreseeable emergencies, including earthquakes and typhoons which are often experienced in Japan. This is especially important and even more critical for high risk projects involving underground works, such as Tunneling & Pneumatic Caissons. Based on the safety regulation of underground works, a back-up power supply system must be provided during the construction period at all times. Often, fluorescent lamps with re-chargeable batteries are provided for infrequent emergency cases, however these have a questionable useable life span and thus need careful maintenance and periodical replacement. In this paper we focused on using the phosphorescence materials to indicate the evacuation direction. As a result, it was confirmed that the phosphorescence materials were considered useful in reducing panic and facilitating a controlled evacuation in the event of a total black-out due to power failure.

  • PDF

Study on Application of Superconducting Fault Current Limiter Considering Risk of Circuit Breaker Short-Circuit Capacity in a Loop Network System

  • Kim, Jin-Seok;Lim, Sung-Hun;Kim, Jae-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1789-1794
    • /
    • 2014
  • This paper suggests an application method for a superconducting fault current limiter (SFCL) using an evaluation index to estimate the risk regarding the short-circuit capacity of the circuit breaker (CB). Recently, power distribution systems have become more complex to ensure that supply continuously keeps pace with the growth of demand. However, the mesh or loop network power systems suffer from a problem in which the fault current exceeds the short-circuit capacity of the CBs when a fault occurs. Most case studies on the application of the SFCL have focused on its development and performance in limiting fault current. In this study, an analysis of the application method of an SFCL considering the risk of the CB's short-circuit capacitor was carried out in situations when a fault occurs in a loop network power system, where each line connected with the fault point carries a different current that is above or below the short-circuit capacitor of the CB. A loop network power system using PSCAD/EMTDC was modeled to investigate the risk ratio of the CB and the effect of the SFCL on the reduction of fault current through various case studies. Through the risk evaluations of the simulation results, the estimation of the risk ratio is adequate to apply the SFCL and demonstrate the fault current limiting effect.