Browse > Article
http://dx.doi.org/10.7737/JKORMS.2013.38.2.043

Production and Remanufacturing Planning under Uncertain Supply of Recovery Cores and a Disassemble-to-order Environment  

Kang, Changmuk (숭실대학교 산업정보시스템공학과)
Publication Information
Abstract
Remanufacturing is a process of recovering end-of-life products into serviceable parts for producing new products. Due to the limited supply of recovery cores to remanufacture, a remanufacturing firm also needs to produce or procure new parts for fulfilling the demand. This paper is targeted for solving the problem of determining the optimal amount of newly produced and remanufacturing parts, which is called production and remanufacturing planning (PRP) problem, under uncertain supply of recovery cores. The new production mitigates the risk of insufficient core supply while it takes more costs than the remanufacturing. The PRP model in this paper also considers disassemble-to-order (DTO) environment, in which multiple kinds of parts are remanufactured from multiple products on order of the parts. Whereas existing studies presents only heuristic solutions for DTO remanufacturing, this paper provides an exact solution for this problem and analytical sensitivity of the involved cost parameters, adopting multi-dimensional newsvendor modeling and stochastic linear programming techniques. The result shows that production and remanufacturing plans for multiple products are mutually dependent, and a change of cost parameters involved in only one part is propagated to all other parts.
Keywords
Production and Remanufacturing Planning; Core Supply Uncertainty; Disassemble-to-Order; Mutli-Dimensional Newsvendor; Stochastic Linear Programming;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 박상욱, "공급업자의 공급불확실성이 재고관리 비용에 미치는 효과에 관한 연구", 한국경영과학회지, 제26권, 제3호(2001), pp.105-117.   과학기술학회마을
2 박찬우, 이효성, "주문-조립시스템의 설계 및 성능평가", 한국경영과학회지, 제27권, 제4호 (2002), pp.41-65.   과학기술학회마을
3 Dogru, M.K., M.I. Reiman, and Q. Wang, "A stochastic programming based inventory policy for assemble-to-order systems with application to the w model," Operations Research, Vol.58, No.4(2010), pp.849-864.   DOI
4 Fine, C.H. and R.M. Freund, "Optimal investment in product-flexible manufacturing capacity," Management Science, Vol.36, No.4(1990), pp.449-466.   DOI   ScienceOn
5 Fleischmann, M, R. Kuik, and R. Dekker, "Controlling inventories with stochastic item returns : A basic model," European Journal of Operational Research, Vol.138, No.1(2002), pp.63-75.   DOI   ScienceOn
6 Golany, B., J. Yang, and G. Yu, "Economic lotsizing with remanufacturing options," IIE Transactions, Vol.33, No.11(2001), pp.995-1003.
7 Guide Jr., V.D.R, "Production planning and control for remanufacturing : Industry practice and research needs," Journal of Operations Management, Vol.18, No.4(2000), pp.467-483.   DOI   ScienceOn
8 Guide Jr., V.D.R. and L.N. Wassenhove, "Managing product returns for remanufacturing," Production and Operations Management, Vol.10, No.2(2001), pp.142-155.
9 Harrison, J.M. and J.A. Van Mieghem, "Multi-resource investment strategies : Operational hedging under demand uncertainty," European Journal of Operational Research, Vol.113, No.1 (1999), pp.17-29.   DOI   ScienceOn
10 Henig, M. and Y. Gerchak, "The structure of periodic review policies in the presence of random yield," Operations Research, Vol.38, No.4(1990), pp.634-643.   DOI   ScienceOn
11 Inderfurth, K., "Simple optimal replenishment and disposal policies for a product recovery system with leadtimes," OR Spectrum, Vol.19, No.2(1997), pp.111-122.   DOI
12 Inderfurth, K. and I.M. Langella, "Heuristics for solving disassemble-to-order problems with stochastic yields," OR Spectrum, Vol.28, No.1 (2006), pp.73-99.   DOI
13 Inderfurth, K. and E. Van Der Laan, "Leadtime effects and policy improvement for stochastic inventory control with remanufacturing," International Journal of Production Economics, Vol. 71, No.1(2001), pp.381-390.   DOI   ScienceOn
14 Kang, C.M. and Y.S. Hong, "Dynamic disassembly planning for remanufacturing of multiple types of products," International Journal of Production Research, Vol.50, No.22(2012), pp.6236-6248.   DOI   ScienceOn
15 Kiesmuller, G.P., "A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes," European Journal of Operational Research, Vol.147, No.1(2003), pp.62-71.   DOI   ScienceOn
16 Kim, H.J. and P. Xirouchakis, "Capacitated disassembly scheduling with random demand," International Journal of Production Research, Vol.48, No.23(2010), pp.7177-7194.   DOI   ScienceOn
17 Kim, K., I. Song, J. Kim, and B. Jeong, "Supply planning model for remanufacturing system in reverse logistics environment," Computers and Industrial Engineering, Vol.51, No.2(2006), pp. 279-287.   DOI   ScienceOn
18 Kongar, E. and S.M. Gupta, "A multi-criteria decision making approach for disassembly-to-order systems," Journal of Electronics Manufacturing, Vol.11, No.2(2002), pp.171-183.   DOI   ScienceOn
19 Kwak, M., S. Behdad, Y. Zhao, H. Kim, and D. Thurston, "E-waste stream analysis and design implications," Journal of Mechanical Desing, Vol.133, No.10(2011), pp.1010031-8
20 Langella, I.M., "Heuristics for demand-driven disassembly planning," Computers and Operations Research, Vol.34, No.2(2007), pp.552-577.   DOI   ScienceOn
21 Lund, R., "Remanufacturing," Technology Review, Vol.87, No.2(1984), pp.18-23.
22 Schulz, T. and I. Langella, "Examining the performance of heuristics for the disassemble-to-order problem under rolling planning using actual product structures," Available at SSRN 1341108, (2009).
23 Madansky, A., "Inequalities for stochastic linear programming problems," Management Science, Vol.6, No.2(1960), pp.197-204.   DOI   ScienceOn
24 Mangun, D. and D.L. Thurston, "Incorporating component reuse, remanufacture, and recycle into product portfolio design," IEEE Transactions on Engineering Management, Vol.49, No. 4(2002), pp.479-490.   DOI   ScienceOn
25 Schulz, T. and I. Ferretti, "On the alignment of lot sizing decisions in a remanufacturing system in the presence of random yield," Journal of Remanufacturing, Vol.1, No.1(2011), pp. 1-11.   DOI
26 Taleb, K.N. and S.M. Gupta, "Disassembly of multiple product structures," Computers and Industrial Engineering, Vol.32, No.4(1997), pp. 949-961.   DOI   ScienceOn
27 Teunter, R.H., Z.P. Bayindir, and W. Van Den Heuvel, "Dynamic lot sizing with product returns and remanufacturing," International Journal of Production Research, Vol.44, No.20(2006), pp.4377-4400.   DOI   ScienceOn
28 Thierry, M.C., M. Salomon, J. Nunen, and L.N. Wassenhove, "Strategic issues in product recovery management," California Management Review, Vol.37, No.2(1995), pp.114-135.   DOI   ScienceOn
29 Van der Laan, E., M. Salomon, R. Dekker, and L. Van Wassenhove, "Inventory control in hybrid systems with remanufacturing," Management Science, Vol.45, No.5(1999), pp.733-747.   DOI   ScienceOn
30 Van Mieghem, J.A., "Investment strategies for flexible resources," Management Science, Vol.44, No.8(1998), pp.1071-1078.   DOI   ScienceOn
31 Yang, J., B. Golany, and G. Yu, "A concave-cost production planning problem with remanufacturing options," Naval Research Logistics, Vol. 52, No.5(2005), pp.443-458.   DOI   ScienceOn