KSII Transactions on Internet and Information Systems (TIIS)
/
v.17
no.8
/
pp.2140-2156
/
2023
The Wireless Sensor Network (WSN), is constructed out of teeny-tiny sensor nodes that are very low-cost, have a low impact on the environment in terms of the amount of power they consume, and are able to successfully transmit data to the base station. The primary challenges that are presented by WSN are those that are posed by the distance between nodes, the amount of energy that is consumed, and the delay in time. The sensor node's source of power supply is a battery, and this particular battery is not capable of being recharged. In this scenario, the amount of energy that is consumed rises in direct proportion to the distance that separates the nodes. Here, we present a Hybrid Firefly Glow-Worm Swarm Optimization (HF-GSO) guided routing strategy for preserving WSNs' low power footprint. An efficient fitness function based on firefly optimization is used to select the Cluster Head (CH) in this procedure. It aids in minimising power consumption and the occurrence of dead sensor nodes. After a cluster head (CH) has been chosen, the Glow-Worm Swarm Optimization (GSO) algorithm is used to figure out the best path for sending data to the sink node. Power consumption, throughput, packet delivery ratio, and network lifetime are just some of the metrics measured and compared between the proposed method and methods that are conceptually similar to those already in use. Simulation results showed that the proposed method significantly reduced energy consumption compared to the state-of-the-art methods, while simultaneously increasing the number of functioning sensor nodes by 2.4%. Proposed method produces superior outcomes compared to alternative optimization-based methods.
Jae Hyung Park;Jihun Im;Hyo Jun An;Yonghee Kim;Jeong Ik Lee;Sung Joong Kim
Nuclear Engineering and Technology
/
v.56
no.7
/
pp.2534-2544
/
2024
This paper proposes a flooding safety system (FSS) and its operation strategy that can provide long-term safety and effective maintenance for modules of small modular reactor (SMR) and metal containment maintained at dried environment during normal operation. During hypothesized accidents, the FSS re-collects the evaporated steam into the common pool by the condenser installed above the common water pool and provides an emergency coolant for the cavities and auxiliary pools. This study suggested that the condensate re-collection strategy using the FSS can effectively delay the depletion of available water in response to the accidents. Without recollection, the achievable grace periods ranged from 44 to 1507 days for six-module and one-module accidents, respectively. However, with a full re-collection (ratio = 1.0), the time to total depletion of emergency coolant was estimated indefinite. Even with a partial re-collection ratio of 0.3, a grace period of 83.5 days could be ensured for a six-module transient. This study reported the effectiveness of condensate re-collection and the FSS as an innovative safety management strategy and system. Employing a condensate re-collection strategy with a high re-collection ratio can enhance the long-term safety and effective convenience of SMR operations and maintenance.
It is well known that diabetes mellitus is associated with metabolic derangements, such as hyper-glycemia, ketosis, glycosuria, and also widespread alterations in the blood vessels, kidneys, eyes, peripheral nerves and heart. It is also recognized that healing of skin wound is delayed in diabetics. In bone, according to Aegerter, osteopenia develops in diabetes mellitus and it is chiefly ascribed to overutilization of protein. Shim claims that total blood flow to the entire skeletal system is approximately 4 to 8 percent of resting cardiac output and blood supply to the skeletal system would be decreased on account of secondary arteriosclerotic changes in the diabetics. An adequate blood supply is an essential factor in the healing process of fracture, and disturbed blood flow, either local or systemic, will invariably delay union of the fragments or the fragments from being fused. As the author has encountered several cases of diabetics in whom healing of fracture was delayed or incomplete, this experimental study was undertaken to elucidate the effects of hyperglycemia and diabetes mellitus on the healing process of fracture. In this experiment adult albino rabbits, weighing about 2 kg. were used and divided into 6 groups. The femur of each animal was fractured surgically, and then the healing process of fracture was periodically checked by radiography at an interval of one week for a period of 6 weeks. Thereafter, all the rabbits were killed to obtain tissue preparation of the femur. The experimental groups were as follows; 1) Control group: Six rabbits sustained a surgical fracture to the femur, without being given any other treatment or drug. 2) Alloxan-treated group: For inducing diabetes, alloxan was given intravenously to 17 rabbits in various dose as follows; to 7 of them 40 mg/kg, to 6 rabbits 80 mg/kg and to 4 rabbits 120 mg/kg of body weight, respectively. 3) Insulin-treated group: Protamine-zinc insulin was injected subcutaneously to each of 6 rabbits in a daily dose of 1 unit per kilogram of body weight. 4) Group treated with insulin after alloxan: Four rabbits were given 80 mg of alloxan once and than 1 unit of insulin per kilogram of body weight daily. Another 5 rabbits were injected 1 unit of insulin per kg of body weight daily following administration of alloxan in a dose of 120 mg/kg. 5) Homotransplantation group: Following intravenous injection of alloxan in a dose of 120 mg/kg, 10 rabbits underwent homotransplantation of a short bone segment to the femur. Five of them were subsequently given 1 unit/kg of insulin daily. 6) Sugar-treated group: six rabbits were fed $15{\sim}20$ gm of sugar daily throughout the period of experiment. The results obtained are summarized as follows; 1. Blood sugar level and damage to the pancreatic islet increased proportionately when alloxan was given to the rabbits in various doses. No appreciable change could be observed in the islets when the blood sugar level was altered by either oral administration of sugar or subcutaneous injection of insulin. 2. Comparing with the control group, healing of fracture was delayed in the alloxan-treated group, while callus formation and periosteal reaction were shown to be more prominent in this group and subsequently, the ultimate osseous tissue formed at the fracture site was significantly smaller in amount and less compact. These findings were more marked as the amount of alloxan increased. 3. Administration of insulin prevented the delay in healing process of fracture in the rabbits with alloxan-induced hyperglycemia. In this case, the course and progression of fracture healing were almost similar to those of control group. 4. Union between the host bone and the fragment transplanted from other rabbit of the same species was more delayed in the group treated with alloxan alone than in the group to which insulin was administered after development of alloxan-induced diabetes. In both groups periosteal new bone developed from the ends of the host bone, above and below the transplanted fragment, and directly fused with failure of periosteal callus to bridge the adjacent ends of the host bone and the transplanted fragment. 5. The healing process of fracture was not inhibited by alteration in blood sugar level when the blood sugar was abnormally increased by excessive sugar intake or lowered by administration of insulin alone. The healing of fracture in these groups progressed similarly as in the control group. In brief summary, it appears that the healing process of fracture would be definitely disturbed in diabetic state brought about by damage to the pancreatic islet. As such an inhibition could be overcome with insulin, it seems that insulin plays an important role in healing of fracture, but alteration in blood sugar level alone does not modify healing process of fracture to significant degree.
Journal of Korean Tunnelling and Underground Space Association
/
v.24
no.4
/
pp.327-339
/
2022
The purpose of this study is to present the effective smoke control flow rate and mode for securing safety through quantitative risk assessment according to the smoke control flow rate and mode (supply or exhaust) of the platform when a train fire occurs at the subway platform. To this end, a fire outbreak scenario was created using a side platform with a central staircase as a model and fire analysis was performed for each scenario to compare and analyze fire propagation characteristics and ASET, evacuation analysis was performed to predict the number of deaths. In addition, a fire accident rate (F)/number of deaths (N) diagram (F/N diagram) was prepared for each scenario to compare and evaluate the risk according to the smoke control flow rate and mode. In the ASET analysis of harmful factors, carbon monoxide, temperature, and visible distance determined by performance-oriented design methods and standards for firefighting facilities, the effect of visible distance is the largest, In the case where the delay in entering the platform of the fire train was not taken into account, the ASET was analyzed to be about 800 seconds when the air flow rate was 4 × 833 m3/min. The estimated number of deaths varies greatly depending on the location of the vehicle of fire train, In the case of a fire occurring in a vehicle adjacent to the stairs, it is shown that the increase is up to three times that of the vehicle in the lead. In addition, when the smoke control flow rate increases, the number of fatalities decreases, and the reduction rate of the air supply method rather than the exhaust method increases. When the supply flow rate is 4 × 833 m3/min, the expected number of deaths is reduced to 13% compared to the case where ventilation is not performed. As a result of the risk assessment, it is found that the current social risk assessment criteria are satisfied when smoke control is performed, and the number of deaths is the flow rate 4 × 833 m3/min when smoke control is performed at 29.9 people in 10,000 year, It was analyzed that it decreased to 4.36 people.
Journal of the Korea Institute of Information and Communication Engineering
/
v.17
no.10
/
pp.2409-2418
/
2013
Two frequency synthesizers are proposed to generate a clock for a sub-sampler of an on-chip oscilloscope in this paper. These proposed frequency synthesizers are designed by using a multi-phase delayed-locked loop (DLL)-based phase selector and a fractional-N phase-locked loop (PLL), and they are analyzed by comparing simulation results of each frequency synthesizer. Two proposed frequency synthesizers are designed using a 65-nm CMOS process with a 1V supply and output the clock with the frequency of 121.15 MHz when the frequency of an input clock is 125 MHz. The designed frequency synthesizer using a multi-phase DLL-based phase selector has the area of 0.167 $mm^2$ and the peak-to-peak jitter performance of 2.88 ps when it consumes the power of 4.75 mW. The designed frequency synthesizer using a fractional-N PLL has the area of 0.662 $mm^2$ and the peak-to-peak jitter performance of 7.2 ps when it consumes the power of 1.16 mW.
Journal of the Institute of Electronics and Information Engineers
/
v.53
no.7
/
pp.17-26
/
2016
This work proposes a 12b 60MS/s 0.18um CMOS Flash-SAR ADC for various systems such as wireless communications and portable video processing systems. The proposed Flash-SAR ADC alleviates the weakness of a conventional SAR ADC that the operation speed proportionally increases with a resolution by deciding upper 4bits first with a high-speed flash ADC before deciding lower 9bits with a low-power SAR ADC. The proposed ADC removes a sampling-time mismatch by using the C-R DAC in the SAR ADC as the combined sampling network instead of a T/H circuit which restricts a high speed operation. An interpolation technique implemented in the flash ADC halves the required number of pre-amplifiers, while a switched-bias power reduction scheme minimizes the power consumption of the flash ADC during the SAR operation. The TSPC based D-flip flop in the SAR logic for high-speed operation reduces the propagation delay by 55% and the required number of transistors by half compared to the conventional static D-flip flop. The prototype ADC in a 0.18um CMOS demonstrates a measured DNL and INL within 1.33LSB and 1.90LSB, with a maximum SNDR and SFDR of 58.27dB and 69.29dB at 60MS/s, respectively. The ADC occupies an active die area of $0.54mm^2$ and consumes 5.4mW at a 1.8V supply.
With Korean Government's Renewable energy 3020 plan and 8th Basic plan for long-term power supply, renewable energy industries in Korea are active and catching attention from many relevant industry's relations. Especially with Interconnection guarantee policy established in Oct, 2016, DERs interconnection delay due to lack of allowable distribution hosting capacity is happening and reduction of reinforcement cost for distribution system where 70 % of DERs in South Korea are installed became one of important issues of KEPCO. Therefore, KEPCO needed to extract reasonable solutions to increase feasible hosting capacity of distribution feeders in order to reduce reinforcement cost under the condition of no matter in distribution system operation. This paper proposes feasible hosting capacity of distribution feeders that can be adopted and the status of DER installation in distribution system, PV output data, minimum load in distribution feeders as well as capacity of distribution lines have been investigated and analyzed in proof of the proposal.
The purpose of this paper is to develop a dynamic OD estimating model to overcome the limitation of depicting teal situations in dynamic simulation models based on static OD trip. To estimate dynamic OD matrix we used the hybrid discrete choice model(called the 'Demand Simulation Model'), which combines travel departure time with travel mode and travel path. Using this Demand Simulation Model, we deduced that the traveler chooses the departure time and mode simultaneously, and then choose his/her travel path over the given situation In this paper. we developed a hybrid simulation model by joining a demand simulation model and the supply simulation model (called LiCROSIM-P) which was Previously developed. We simulated the hybrid simulation model for dependent/independent networks which have two origins and one destination. The simulation results showed that AGtt(Average gap expected travel time and simulated travel time) did not converge, but average schedule delay gap converged to a stable state in transportation network consisted of multiple origins and destinations, multiple paths, freeways and some intersections controlled by signal. We present that the hybrid simulation model can estimate dynamic OD and analyze the effectiveness by changing the attributes or the traveler and networks. Thus, the hybrid simulation model can analyze the effectiveness that reflects changing departure times, travel modes and travel paths by demand management Policy, changing network facilities, traffic information supplies. and so on.
Magazine of the Korean Society of Agricultural Engineers
/
v.28
no.2
/
pp.31-41
/
1986
Knowledge of the degree of yield reduction due to water stress at different crop growth stages in rice production is important for rational scheduling of irrigation during periods of insufficient water supply. Previous studies to determine the degree of yield reduction duo to water stress suffered from interruptions by rain during experiment. Also the findings did rot relate the degree of water stress to the soil water potential and water deficit status of rice plants. In this study, two years experiments were conducted using the high yielding rice varieties, an Indica x Japonica (Nampoong) and a Japonica variety(Choochung). These were grown in 1/200$^{\circ}$ plastic pots placed under a rainfall autosensing, sliding clear plastic roof facility to control rainfall interruptions. The results obtained were as follows. 1.The two varieties differed in the growth stage most sensitive to water stress as well as the degree of yield reductions. When rice plants were stressed to the leaf rolling score 4 and soil water potential of about - 20 bar at major crop growth stages which included heading, booting, non-effective tillering, panicle initiation and early tillering stages, the yield reductions in the Indica x Japonica variety were 58%, 34%, 27%, 22%, and 21%, respectively, whereas in the Japonica vairety they were 23%, 36%, 1%, 13% and 22%, respectively. This result show that the recommended drainage during non-effective tillering is valid only for the Japonica variety. Sufficient irrigation at booting, heading and early tillering stages are necessary for both varieties. 2.The two varieties showed visible wilting symptoms when the soil water potential dropped to about - 3.0 bar. The Japonica variety showed more leaf rolling than the Indica X Japonica. However, it had a higher retention of leaf water content and greater stomatal diffusive resistance. When the soil water potential dropped, the Japonica variety showed leaf rolling score (LRS) 1 at 0 soil-5. 0 bar and LRS 2 at 0 soil -6.0 bar while the Indica X Japonica showed LRS 1 at 0 soil - 5.5 bar and LRS 2at 0 Soil - 9.0 bar. The stomatal diffusive resistance was maximum at the second top leaf blade in both varieties at intermediate water stress of 0 soil - 4.5 bar. 3.The number of days that was required for the soil water potential to drop to-3. 0 bar and to - 20.0 bar after drainage of irrigation water from the 20cm deep silty clay loam soil in the pots were 6 and 13 days, respectively for booting stage, and 7 and 11 days, respectively for heading stage, 9 and 12 days, respectively for panicle initiation stage, and 12 and 19 days, respectively for early tillering stage. 4.Water stress during the early tillering stage recorded the longest delay in beading time, the largest reduction in panicle numbers and a substantial yield decrease of 20%. This calls for better water management to ensure the availability of water at this stage, particularly during drought periods. In addition, a reexamination of the conventional inter-drainage practice during the non-effective tillering stage is necessary for the high yielding Indica X Japonica varieties.
As with appearing new applications that requires QoS guarantee such as VoIP, VPN in Internet, problems of IP QoS has been one of most important issues in next-generation Internet. IETF has proposed integrated services model(Int-Serv) and differentiated service(Diff-Serv) to supply IP QoS in Internet. Int-Serv model uses the state information of each IP flow, so satisfies QoS according to traffic characteristics, but increases the amount of flow state information with increasing flow number. Diff-Serv model uses PHP(Per Hop Behavior), and there are well-defined classes to provide differentiated traffics with different services according to delay and loss sensitivity. Diff-Serv model can provide diverse services in Internet because of having no the state and signal information of each flow. As MPLS uses the packet forwarding technique based-on label, it implements the traffic engineering in the networks easily. The MPLS can set up the path with different traffic parameters, and assign each path to particular Class of Services. Therefore it is possible to support the Diff-Serv model with well-defined classes. In this paper we investigate the performance improvement of Diff-Serv function in the MPLS network to guarantee class of services in Internet.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.