• Title/Summary/Keyword: stone masonry

Search Result 71, Processing Time 0.022 seconds

New methodology to prevent blasting damages for shallow tunnel

  • Ozacar, Vehbi
    • Geomechanics and Engineering
    • /
    • v.15 no.6
    • /
    • pp.1227-1236
    • /
    • 2018
  • From all of the environmental problems, blast-induced vibrations often cause concern to surrounding residents. It is often claimed that damage to building superstructures is due to blasting, and sometimes the building owner files a lawsuit against the company that perform blasting operations. The blast-vibration problem has been thoroughly investigated in the past and continues to be the subject of ongoing research. In this study, a tunnel construction has been performed by a construction company, according to their contract they must have used drilling & blasting method for excavation in tunnel inlet and outlet portal. The population is very condensed with almost tunnel below in the vicinity houses of one or two floors, typically built with stone masonry and concrete. This situation forces the company to take extreme precautions when they are designing blasts so that the blast effects, which are mainly vibration and aerial waves, do not disturb their surrounding neighbors. For this purpose, the vibration measurement and analysis have been carried out and a new methodology in minimizing the blast induced ground vibrations at the target location, was also applied. Peak particle velocity and dominant frequencies were taken into consideration in analyzing the blast-induced ground vibration. The methodology aims to employ the most suitable time delays among blast-hole groupings to render destructive interference of surface waves at the target location.

Characteristics on Stabilization Measures for Cutting Slopes of Forest Roads (임도구조 요인에 따른 절토비탈면 안정구조물의 특성)

  • Baek, Seung-An;Ji, Byoung-Yun;Lee, Joon;Cha, Du-Song
    • Journal of Forest and Environmental Science
    • /
    • v.30 no.1
    • /
    • pp.71-75
    • /
    • 2014
  • Forest roads failure is one of the most common problems caused by heavy rainfalls. This study investigated the characteristics on stabilization measures installed for cutting slopes failure of forest road resulted from heavy rainfalls. Three primary factors (slope length, slope gradient, soil type) affecting cutting slope failure were considered and stabilization measures were classified into two types (A type: wooden fence, vegetation sandbag, stone masonry; B type: wire cylinder, gabion, concrete retaining wall) through discriminant analysis based on their capacity of resistance to slope failure. Results showed that A type was mainly installed in such conditions as cut slope <8 m, cut slope gradient $30-40^{\circ}$ and soil type with soil while B type occurred in locational conditions as cut slope length >8 m, cut slope gradient < $30^{\circ}$ and > $30^{\circ}$, and soil type of gravelly soil and rock.

Relationship between Le Corbusier's Errazuris House Project and Antonin Raymond's Karuizawa Villa (르 코르뷔지에의 에라즈리스 주택계획안과 안토닌 레이몬드의 카루이자와 별장의 상관성에 관한 연구)

  • Kim, Kyoung-Yon;Jun, Byung-Kweon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.1
    • /
    • pp.15-22
    • /
    • 2018
  • Raymond, who adopted Le Corbusier's Errazuris House Project, built Karuizawa Villa by incorporating Japan's aspiration for Western modern architecture and strong convictions regarding the preservation of traditional culture heritage, which were prevalent in Japan at the time. Despite the controversy over his plagiarism, Karuizawa Villa shows several unique architectural characteristics. First, in terms of the arrangement and access system, the villa has a common space that affords a view of the lake by accessing from the mountain side. Second, in terms of spatial composition, the common space is connected to the mesonnette by placing a trail to enable enjoyment of natural scenery. In particular, personal space is planned in the shape of a cross by connecting several surfaces to the outside in order to secure enjoyment of the natural environment. Lastly, in the aspect of structure and materials, both architectural buildings adopted masonry by using natural stone as well as building materials suitable for each region and climate by using logs in constructing the main columns and beams. Through Karuizawa Villa, Raymond is considered to have established his own style by combining the standard of Western modern architecture and the elements of Japanese traditional architecture while valuing local architectural technology.

An Analysis on the Properties of Cement Mortar using Sewage Sludge Incineration Ash (하수슬러지 소각재를 이용한 시멘트 모르타르의 특성분석)

  • Ryu, Heon-Ki;Park, Jeong-Min
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.55-62
    • /
    • 2010
  • This is an experimental research in order to judge the applicability of sewage sludge incineration ash having applied the mixing proportion needed to manufacture bricks and to do plaster work with addition of hwangtoh and slaked lime as a part of the methods for utilizing the wastes produced from sewage sludge incineration ash. Based on the results from experiment and analysis, it is judged that, in case of mixing proportion of 1:2 for the purpose of plastering and masonry work, the cement mortar produced by using a 10% addition ratio of sewage sludge incineration ash with mixture of hwangtoh covering all range of addition ratio, and also the cement mortar produced by using a 20% of sewage sludge incineration ash together with 0% and 10% addition ratio of hwangtoh, was possible to be applied to the practical use. In case of mixing proportion of 1:7 for manufacture of bricks and blocks, if such brick and block products are produced with 10% and 20% addition ratio of sewage sludge incineration ash having added aggregate fines or stone dust that has been actually used in brick and block manufacturing, it is judged that these bricks and blocks could be practically used in the job sites, although strength development is a little bit lower.

  • PDF

Three dimensional modelling of ancient colonnade structural systems subjected to harmonic and seismic loading

  • Sarhosis, V.;Asteris, P.G.;Mohebkhah, A.;Xiao, J.;Wang, T.
    • Structural Engineering and Mechanics
    • /
    • v.60 no.4
    • /
    • pp.633-653
    • /
    • 2016
  • One of the major threats to the stability of classical columns and colonnades are earthquakes. The behavior of columns under high seismic excitation loads is non-linear and complex since rocking, wobbling and sliding failure modes can occur. Therefore, three dimensional simulation approaches are essential to investigate the in-plane and out-of-plane response of such structures during harmonic and seismic loading excitations. Using a software based on the Distinct Element Method (DEM) of analysis, a three dimensional numerical study has been performed to investigate the parameters affecting the seismic behaviour of colonnades' structural systems. A typical section of the two-storey colonnade of the Forum in Pompeii has been modelled and studied parametrically, in order to identify the main factors affecting the stability and to improve our understanding of the earthquake behaviour of such structures. The model is then used to compare the results between 2D and 3D simulations emphasizing the different response for the selected earthquake records. From the results analysis, it was found that the high-frequency motion requires large base acceleration amplitude to lead to the collapse of the colonnade in a shear-slip mode between the drums. However, low-frequency harmonic excitations are more prominent to cause structural collapse of the two-storey colonnade than the high-frequency ones with predominant rocking failure mode. Finally, the 2D analysis found to be unconservative since underestimates the displacement demands of the colonnade system when compared with the 3D analysis.

A Study on the Dome Plan of S. M. del Fiore Church of F. Brunelleschi (브루넬레스키의 산타 마리아 델 휘오레 교회의 돔계획에 관한 연구)

  • Kim, Seok-Man
    • Journal of architectural history
    • /
    • v.21 no.5
    • /
    • pp.19-32
    • /
    • 2012
  • The purpose of this paper is a study on the dome plan of S. M. del Fiore Church of F. Brunelleschi. The results of study are as follows: 1. The planning of floor, elevation and cross section plan of S. M. del Fiore church is basically planned by each other correlation. In particular, the octangular form of geometrical standard which is formed with altar as the center at the crossing part is important component elements which is decided by not only the dome, but form and size of the drum and floor plan form of the lantern 2. The dome which has been planned by F. Brunelleshi has completed the new dome, preserving gothic thought intended by the church plan after study on architecture of ancient Rome with Pantheon. And the dome which is a main space of church through all aspects of plan, structure, function and construction about the dome is a opportunity in the beginning of Renaissance architecture which is a new epoch and a turning point of architecture on various point of view. 3. The dome which is constructed by F. Brunelleshi has been planned through the innovative solution by the refusal of traditional semicircle form dome, centering use and creation double-shell structure form for the first time in history. And the construction of dome has been solved with the invention of various construction equipments and machineries, the stone rib planned for connection and reinforcement about shells of the octangular form, the support method for reduction the gravity of bricklayers work and the brick work of nock-patterned shape which is masonry construction method of the architecture of ancient Rome.

Geophysical Exploration of Songsalli Ancient Tombs and Analysis of King Muryeong's Tomb Structure, Gongju (공주 송산리 고분군(公州 宋山里 古墳群)에서의 물리탐사와 무령왕릉(武寧王陵)의 구조분석)

  • Oh, Hyun-dok
    • Korean Journal of Heritage: History & Science
    • /
    • v.46 no.4
    • /
    • pp.4-23
    • /
    • 2013
  • Songsalli Ancient Tombs of Gongju consists of seven tombs. King Muryeong's tomb, the seventh tomb, is a brick chamber tomb discovered during the drainage works for the fifth and the sixth tombs in 1971. The excavation at the time focused on topographic surveys of the tomb entrance and the inside of the burial chamber as well as collection of the remains. The burial mount survey confirmed the status of some stone slab remaining and lime-mixed soil layers, but the survey did not examine the exterior structure of the whole tomb as the mounds were removed even more deeply. The excavation revealed damages to the bricks and mural damages due to moisture and fungus in the sixth and the seventh tombs. Between 1996 and 1997, Gongju National University conducted a comprehensive detailed survey of Songsalli Ancient Tombs including a geophysical survey, with an aim to identify the root causes of such degradation. Based on the results, repair took place in 1999 and the fifth, sixth and seventh tombs were placed under permanent conservation to conserve the cultural assets. General public is currently denied access. The purpose of this study was to conduct a three-dimensional resistivity and GPR surveys on the ground surface of the fifth, sixth and seventh tombs of Songsalli Ancient Tombs in order to understand the underground status after repair. The study also aimed to understand the thickness of all the tomb walls and exterior structure based on GPR inside King Muryeong's tomb. The exploration on the ground surface found that the three tombs and soil adjacent to the tombs had resistivity as low as 5 to $90{\Omega}m$, which confirmed that the soil water content was still as high as that prior to the repair work. Additionally, GPR found that the wall construction of the burial chamber of King Muryeong's tomb was approximately 70cm in thickness, while the structure was of 2B with two bricks, about 35cm in length, put together longitudinally(2B brick masonry). The pathway to the burial chamber was of the 2B structure just like that of the burial chamber walls, while its thickness was 80cm with an eyebrow-type arch connected to it. Also, the ceiling exterior appears to have an arch structure, identical to the shape inside.

A Study on the Management Guidelines of Erosion Control Facilities in National Forests (I) - The Inspection Results of Erosion Control Facilities from 2009 to 2011 - (국유림 내 사방시설 관리방안에 관한 연구(I) - 2009~2011년 국유림 내 사방시설 점검 결과를 중심으로 -)

  • Lee, Sang-Ho;Jung, Cha-Sik;Kim, Jeong-Sig;Jung, Ho-Jin;Kim, Min-Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.2
    • /
    • pp.251-258
    • /
    • 2012
  • This study was conducted to analyze field inspection results of erosion control facilities within national forests and to suggest maintenance and management plan of erosion control facilities. The objects amounted to a total of 1,628 locations, comprising 308 erosion control dams and 1,320 erosion control areas (1,269.05 ha). The field inspections were conducted during March-June each year. The erosion control dams inspected were constructed during 1991-2005, with 96.4% of them, or 297 dams, constructed in or after 2000. The erosion control areas were constructed during 1986-2005, with 68.6% of them, or 903 areas, constructed in or after 2000. As for erosion control dams, there were 205 concrete erosion control dams and 68 concrete with boulder pitching erosion control dams, respectively, with 296 out of a total of 308 erosion control dams in a good condition. As for erosion control areas, there were many erosion control structures using stone masonry works and gabions, with 1,245 out of a total of 1,320 (94.3%) erosion control areas in a good condition. Overall, erosion control facilities within national forests were in a good condition, amply fulfilling their functions. As for erosion control facilities in a bad condition, they must be made to accomplish the goals of erosion control works through supplementation and repairs without fail. In addition, for the systematic maintenance and management of existing erosion control facilities and erosion control facilities constructed in the future as part of erosion control works, the construction of an erosion control facility management system is urgently needed.

A study on development of disaster-risk assessment criteria for steep slope -Based on the cases of NDMS in Ministry of Interior and Safety- (급경사지 재해위험도 평가 기준 개선 방안 연구 -행정안전부 급경사지 관리시스템 사례를 중심으로-)

  • Suk, Jae-Wook;Kang, Hyo-Sub;Jeong, Hyang-Seon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.372-381
    • /
    • 2019
  • In this study, the National Disaster Management System (NDMS) was analyzed to evaluate the disaster impact assessment standards for steep slopes. Problems in the assessment methods and systems were discovered, which could be reasons for poor reliability. The disaster-risk evaluation index needs improvement to evaluate various types of retaining walls, such as concrete/reinforced soil walls and reinforcing stone masonry. Additionally, using the same score for overturning, bulging, and efflorescence could be reasons for poor reliability, and different weighting factors are needed. Assessment methods are needed to subdivide the social influence evaluation index while considering environmental conditions of steep slopes, such as railroads and reservoirs. For the evaluation of steep slopes, standards for start and end points of steep slopes should be created for effective management, and disaster impact assessment needs to be performed after redevelopment from an advanced index for protection and reinforcement. These problems were derived from a current evaluation system, so a disaster impact assessment is necessary to supplement the results of this study.

Influence on the Movement of Fish by the Installation of Structures in Mountain Streams: Focused on Chinese Minnow (산지계류에 설치된 계상구조물이 어류의 이동에 미치는 영향: 버들치를 중심으로)

  • Ma, Ho-Seop;Park, Jae-Hyeon
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.2
    • /
    • pp.224-232
    • /
    • 2019
  • The movement of fish to the upper and the lower parts of a mountain stream was investigated based on the installation of specific types of structures within the stream. The results indicated that as the flow rate increases after a rain, the height of the drop in an open-type structure, such as a concrete box, is decreased so that the floating fishes, such as the Chinese minnow fish, move relatively easily from the upper to the lower parts and from the lower to the upper parts of the stream. In contrast, the fishes released from an upper point of a wall-type structure with <1 m, such as rocks drop works and stone masonry for stream-grade stabilization, were trapped in the lower part of the stream and, even after the rainy season, it was difficult for the fish to move from the lower to the upper parts of the stream. In particular, the barrier-type structures ${\geq}3m$ limit the movement of fish, even when there are few drainage holes at the lower end of the dam, and there is no space for the fishes to communicate with each other, even when the flow rate is high; therefore, although the fish are active, they are restricted to move according to the type and characteristics of the structures. When installing structures in a mountain stream, the height of the structure must be low enough to allow the fish to communicate with each other or an open-type structure must be installed. The fish habitat and water conditions within the stream must be considered when designing the type and height of the in-stream structures.